REPAIRING OF CHECKDAM Repairing of 4(Nos.) Checkdam at village : Khatiya Beraja & Navagam in Taluka Lalpur Dist. Jamnagar Package No.2. (Second Attempt)
309072
04 of 2026-27
Open
Civil Works
Jamnagar
7 documents required · 7 mandatory
₹1,500
EXECUTIVE ENGINEER UND IRRIGATION DIVISION JAMNAGAR
₹32,000
27 May 2026
27 May 2026
27 May 2026
11 Jun 2026
27 May 2026
BILL OF QUANTITIES
(A) Percentage Rate Tender (Up to INR 10 Cr.)
Name of work : BIG CHECKDAM
Repairing of 4(Nos.) Checkdam at village : Khatiya Beraja & Navagam in
Taluka Lalpur Dist. Jamnagar Package No.2 (Second Attempt).
Item Description of Item (with brief Quantity Unit Rate In Amount
No. specification and reference to book of figures
specifications)
1 Dismantling stone/brick masonary & stacking of useful 8.00 Cum. 616.00
and unuse full materials from the dismantled materials
as directed etc. complete. (a) In Cement Mortar
2 Dismantling C.C. foundation or flooring sorting & 88.00 Cum. 828.00
stacking useful and unuseful material in lead upto
200mt as directed etc. complete.
3(a) Excavation in all sort of strata and formations incl. 120.00 Cum. 79.00
depositing the unuseful excavated stuff as and
where directed incl sorting and stacking useful
materials as directed upto 200 mt lead and all lift
etc. complete incl. dewatering. (A) IN OVER
BURDEN HARD MURRUM.
3(b) (B) IN SOFT ROCK 134.00 Cum. 176.00
3(c) (C) IN HARD ROCK 156.00 Cum. 590.00
4 Drilling 25mm dia. holes at distant as specified 373.50 Rmt. 252.00
upto 3.00 mt. depth in checkdam foundation and
fixing anchor bars of specified diameter with
cement grout including cleaning holes as directed
etc. (Excluding cost of Bars)
5 Providing & laying uncoursed rubble masonary in cement and
sand mortar by mass and machine mixing incl. use of header and
bond stones etc. and incl. scaffolding and finishing to required
shape and batter end step set casper drawing and racking out
the joints, curing etc. complete in all respect. For all lead lift.
(A) In C.M. 1:5 for Foundation & Super Structure.
6 Prov. & Laying in position cement concrete using 510.00 Cum. 3465.00
cement, sand and crushed metal coarse aggregate
by mass and machine mix for PCC/RCC including
necessary formworks compaction by vibrator,
curing as directed with all lead & lift etc
complete.(Excluding cost of steel) FOR .BODY
WALL, APRON, TRAINING WALL, SIDE WALL,
SPLAY WALL, KEY WALL, CUT OF WALL ETC.
4/E) "NOMINAL MIX" Concrete Grade 1:2:4 and
7 Providing, cutting, bending, binding and fixing in 9.50 M.T. 76574.00
position as per drawing TMT BAR, reinforcement
for R.C.C. works and anchor bars incl. cost of black
annealed 16 to 18 BWG M.S.. Wire etc. complete
with all lead and lift. (B) Fe-500
8 Earthwork / Back filling with selected earth 265.00 Cum. 141.00
brought from out side borrow area or from
excavated useful material including watering
ramming, compaction with pneumatic temping
and all lead and lift etc. complete.
9 Providing & fixing in position 100/110 mm dia 30.00 Rmt. 358.00
PVC Pipe weep holes in the retaining walls / side
wall / abt. etc.
10 Providing and laying STONE 15 LAUNCHING 300.00 Cum. 765.00
APRON by using 50% stone which having
weighing not less than 40 Kg or as specified incl.
hand packing and filling the interstices by spouls
etc. complete with all lead and lift.
Item Description of Item (with brief Quantity Unit Rate In Amount
No. specification and reference to book of figures
specifications)
I am/we are willing to carry out the work at ____________________ % below/above percent
(Should be written in figures and words) of the estimated rates mentioned above. Amount of
My/Our tender works out as under :-
Estimated Amount Rs. 31,36,901=00 Estimated Amount Rs. 31,36,901=00
Put to Tender Rs. Put to Tender Rs.
Deduct _______% Below Rs. __________ Add _______% Above Rs. __________
Net Rs. Net Rs.
(Rupees in words) ________________________ (Rupees in words) ________________________
1. The Contractor shall exhibit a board with detailed specification and details of work as
directed by the Engineer-In-Charge for which no extra payment shall be made.
2. The labour cess will be deducted as per prevailing rules i.e.1% of the work done.
3. GST and Income tax TDS will be deducted at a source while making payments of bills
4. In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per
Govt.G.R.:PRC-10/2017CementConsumption/16/CDate:11/05/2017as stated in S.O.R.
therefore in R.C.C. items where there is a change as per actual mix design the cost of
difference of cement consumption have been deducted from the rate of original item at the
rate of input rate mentioned in all the tender.
5. The rates to be quoted by the contractor must be inclusive of all duties, taxes, and other
levies except GST payable by the contractor under the contract.
Signature of Contractor Executive Engineer
Und Irrigation Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
BOQ.pdf
Doc.pdf
Tender Notice No.4.pdf
Download all tender documents and submit your bid