Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹16.5 LAdmitted-Finance | -26.01% | ₹16.5 L | L1 | Admitted-Finance |
| 2 | L2₹19.7 LAdmitted-Finance | -11.33% | ₹19.7 L | L2 | Admitted-Finance |
Tender Value
₹22.3 L
EMD Value
₹44,502
Closing Date
31 May 2026, 6:00 pmClosed
X.En. (RMC) Div.-I, CAD Chambal, Kota
X.En. (RMC) Div.-I, CAD Chambal, Kota
Constructions VRBS at GP Jhargaon, Drainage System in Sultanpur Sub Branch Section Sub Division Sultanpur
2026_CADKO_561489_14
NIT No. 03/2026-27 (No. 799-815)
Open Tender
Civil Works
365 days
Kota
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
X.En. (RMC) Div.-I, CAD Chambal, Kota
₹44,502
Yes
3 Jun 2026
22 May 2026
1 Jun 2026
22 May 2026
31 May 2026
22 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Side shuttering including propping etc. complete (to achieve finish F-2 for Block joints of foundation stilling basins buckets, aprons etc. (non-suspended horizontally laid mass concrete) | 251.38 | Sqm | 160 | ₹40,220.8 |
| 2 | Extra labour charges for RCC due to obstruction in laying and placing the reinforced cement concrete due to reinforcement. In foundation rafts, beams, columns bases stilling basins, buckets, aprons etc. (non suspended horizontally laid mass concrete) | 196.95 | Cum | 140 | ₹27,573 |
| 3 | Centering and shuttering for slabs, beams, lintels Columns, trough with or without caps and base including propping and removing. | 87 | Sqm | 225 | ₹19,575 |
| 4 | Supplying of M.S. reinforcement including labour charges for bending binding and placing in position all reinforcement as per drawing including cost of binding wire and all leads and lifts using. Tor or ribbed bars (IS :1786) | 12,091.06 | Kg | 78 | ₹9,43,102.68 |
| 5 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect (b) Hard / dense soil | 193.35 | Cum | 79 | ₹15,274.65 |
| 6 | Providing and Laying in position of Cement concrete Nominal mix (1:1.5:3) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto 20 mm | 45.75 | Cum | 5,564 | ₹2,54,553 |
| 7 | Providing and Laying in position of Cement concrete Nominal mix (1:2:4) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto 20 mm | 151.2 | Cum | 5,161 | ₹7,80,343.2 |
| 8 | Providing and Laying in position of Cement concrete Nominal mix (1:3:6) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto 20 mm | 31.04 | Cum | 4,654 | ₹1,44,460.16 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.82 MB
BOQ_999326.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid