Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹9.2 Laccepted-aoc | ₹9.2 L | accepted-aoc |
Tender Value
₹8.7 L
EMD Value
₹8,746
Closing Date
17 Mar 2026, 3:30 pmClosed
TENALI MUNICIPALITY
Tenali
Construction of cc road Hier pet main road extension to Sathyanarayana street in 2nd ward of Tenali Municipality under Municipal General Funds
912341
14/2025-26/GENERAL FUND
OPEN - NCB
Civil Works
GUNTUR
7 documents required · 5 mandatory · 2 optional
₹310
₹8,746
1 Apr 2026
10 Mar 2026
10 Mar 2026
Earthwork in excavation for roads as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing. removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH (Mannual)
Earthwork in excavation for roads as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH (Mechanical)
Collection and spreading of Sand including cost and conveyance of all 6 materials to work site all labour charges and stacking to departmental guage etc., complete as per SS for berms
Plain Cement concrete (1:4:8) using 40 mm HBG metal with concrete mixture 7 including cost and convayance of all materials, labour charges, machine mixing charges, and curing charges etc., complete as per S.S.
Vibrated cement concrete M. 30 grade using 20mm & 10mm HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, seigniorage conveyance of all materials to site and labour charges, centering, machine mixing laying. 8 vibrating, curing etc., including all other incidental and operational charges of all T&P etc. complete for finished item of work as per MoRT&H specification 1500, 1700, 2100 & 2702 (4th Revision) and as directed by the Engineer-in-Charge for C.C Pavement.
Supply of Bitumenious hot sealing compound (Grade 'A' ISI) / polysulphide and sealing the joints including cost and conveyance of all material etc., including labour charges for placing in position for contraction joints at-4.50 M interval/for expansion joints/ for longitudinal joints Os per MORTH specification No. 602
Supply and placing Poly Sheet (separation membrane of impermeable sheeting) 125 Micron thick under CC Pavement slab including cost of 10 conveyance etc. complete, including over head and contractors profit etc complete
Carting away the surplus excavated earth from the work site with a lead of 2.00 Km beyond initial lead including loading, unloading and conveyance but excluding stacking charges etc. complete.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
HIERPET.xlsx
TENDER_DOCUMENT • 0.77 MB
10.NIT, Schedule Part - 2.xls
TENDER_DOCUMENT • 0.10 MB
10.Tender-Doc_-_Corrected.doc
TENDER_DOCUMENT • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .