| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹1.3 CrAccepted-Finance | ₹1.3 Cr | L-1 | Accepted-Finance Found Lowest one |
| 2 | L-2₹1.4 Cr+₹9.4 L (7.33%)Rejected-Finance VILLAGE DOHAL PO PATTI TEHSIL PALAMPUR DISTRICT KANGRA | KANGRA | HIMACHAL PRADESH | 175013 | ₹1.4 Cr+₹9.4 L (7.33%) | L-2 | Rejected-Finance High rate quoted |
| 3 | L-3₹1.4 Cr+₹11.4 L (8.97%)Rejected-Finance R O VILL AIMA P O TEHSIL PALAMPUR DISTT KANGRA H P | ₹1.4 Cr+₹11.4 L (8.97%) | L-3 | Rejected-Finance High rate quoted |
| 4 | L-4₹1.4 Cr+₹11.8 L (9.23%)Rejected-Finance | ₹1.4 Cr+₹11.8 L (9.23%) | L-4 | Rejected-Finance High rate quoted |
| 5 | L-5₹1.4 Cr+₹11.8 L (9.26%)Rejected-Finance | ₹1.4 Cr+₹11.8 L (9.26%) | L-5 | Rejected-Finance High rate quoted |
| Sl No | Description | Qty | Unit | Sohan Singh Govt. Contractor L11 | SUBHASH CHAND GOVT. CONTRACTOR L3 | AMIT KATOCH L1 | GANTANTAR THAKUR L2 | Shashank Jagota Govt. Contractor L10 | KARUN KUMAR L6 | RAMESH CHAND PARIHAR L9 | ABHINAV DHIMAN L5 | Anubhav Sharma L7 | VIJAY KAPOOR L4 | Rakesh Kumar L8 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.within all leads and lifts as per the direction of Engineer-in-charge | 1,805.23 | Per Cubic metre | 275 ₹4,96,438.25 | 220 ₹3,97,150.6 | 250 ₹4,51,307.5 | 150 ₹2,70,784.5 | 150 ₹2,70,784.5 | 180 ₹3,24,941.4 | 180 ₹3,24,941.4 | 140 ₹2,52,732.2 | 190 ₹3,42,993.7 | 250 ₹4,51,307.5 | 90 ₹1,62,470.7 Lowest |
| 2.00 | Providing and laying cement concrete 1:4:8 (One cement : four sand : eight graded stone aggregate 40 milimetre nominal size) and curing complete excluding the cost of form work in foundation and plinth within all leads and lifts as per the direction of Engineer-in-charge | 62.1 | Per Cubic metre | 5,200 ₹3,22,920 | 5,000 ₹3,10,500 | 4,500 ₹2,79,450 | 5,500 ₹3,41,550 | 5,500 ₹3,41,550 | 4,650 ₹2,88,765 | 5,280 ₹3,27,888 | 4,500 ₹2,79,450 | 4,750 ₹2,94,975 | 4,500 ₹2,79,450 | 4,000 ₹2,48,400 Lowest |
| 3.00 | Providing and laying cement concrete 1:2:4 (One cement : two sand : four graded stone aggregate 40 milimetre nominal size) and curing complete excluding the cost of form work and reinforcement for reinforced cement concrete in:- Foundation,footings bases of column and the like mass concrete within all leads and lifts as per the direction of Engineer-in-charge | 95.9 | Per Cubic metre | 6,500 ₹6,23,350 | 5,800 ₹5,56,220 | 6,000 ₹5,75,400 | 6,500 ₹6,23,350 | 7,500 ₹7,19,250 | 6,560 ₹6,29,104 | 6,381 ₹6,11,937.9 | 5,600 ₹5,37,040 Lowest | 6,450 ₹6,18,555 | 6,000 ₹5,75,400 | 6,000 ₹5,75,400 |
| 4.00 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3 (1 cement : 1.5 coarse sand) : 3 graded stone aggregate 20 mm nominal size) within all leads and lifts as per the direction of Engineer-in-charge | 304.75 | Per Cubic metre | 6,900 ₹21,02,775 | 6,800 ₹20,72,300 | 6,500 ₹19,80,875 | 8,000 ₹24,38,000 | 8,500 ₹25,90,375 | 7,350 ₹22,39,912.5 | 7,931 ₹24,16,972.25 | 6,400 ₹19,50,400 Lowest | 7,250 ₹22,09,437.5 | 6,800 ₹20,72,300 | 8,000 ₹24,38,000 |
| 5.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:5:10 (1 cement : 5 coarse sand): 10 graded stone aggregate 40 mm nominal size) within all leads and lifts as per the direction of Engineer-in-charge | 1,037.16 | Per Cubic metre | 4,800 ₹49,78,368 | 4,300 ₹44,59,788 | 4,450 ₹46,15,362 | 4,000 ₹41,48,640 | 5,000 ₹51,85,800 | 4,180 ₹43,35,328.8 | 5,090 ₹52,79,144.4 | 4,100 ₹42,52,356 | 4,625 ₹47,96,865 | 3,800 ₹39,41,208 Lowest | 4,800 ₹49,78,368 |
| 6.00 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Mild steel and Medium Tensile steel bars within all leads and lifts as per the direction of Engineer-in-charge | 6,095 | Per Killogramme | 90 ₹5,48,550 | 82 ₹4,99,790 Lowest | 82 ₹4,99,790 Lowest | 95 ₹5,79,025 | 92 ₹5,60,740 | 89.5 ₹5,45,502.5 | 92 ₹5,60,740 | 88 ₹5,36,360 | 89 ₹5,42,455 | 90 ₹5,48,550 | 82 ₹4,99,790 Lowest |
| 7.00 | Providing form work with steel plates 3.15 milimetre thick welded with angle iron in frame 30x30x5 milimetre so as to give a fair finish including centring,shuttering,strutting and propping etc.with wooden battens ballies,height of propping and centring below supporting floor to ceiling not exceeding 4 metre and removal of the same for in-situ-reinforced concrete and plain concrete work in:-Vertical surfaces such as walls(any thickness)partitions walls and the like including attached pillasters,buttreses plinth string courses and the like within all leads and lifts as per the direction of Engineer-in-charge. | 2,415 | Per Square metre | 375 ₹9,05,625 | 175 ₹4,22,625 | 125 ₹3,01,875 Lowest | 250 ₹6,03,750 | 200 ₹4,83,000 | 125 ₹3,01,875 Lowest | 265 ₹6,39,975 | 300 ₹7,24,500 | 198 ₹4,78,170 | 190 ₹4,58,850 | 200 ₹4,83,000 |
| 8.00 | Stacking of stone within 20 mtrs. of the unloading point in stacks of specified size. pitching,stone, spalls, bricks-batsbuilding stones, ballast, stone metal, coal or shinglecomplete in all respect with in all leads & lifts as per the direction of Engineer-in-charge. | 834.14 | Per Cubic metre | 880 ₹7,34,043.2 | 300 ₹2,50,242 Lowest | 500 ₹4,17,070 | 500 ₹4,17,070 | 375 ₹3,12,802.5 | 920 ₹7,67,408.8 | 987 ₹8,23,296.18 | 375 ₹3,12,802.5 | 900 ₹7,50,726 | 1,100 ₹9,17,554 | 800 ₹6,67,312 |
| 9.00 | Wire crates made of galvanised iron wire filled with boulders with square cut faces against the wire. (Boulder filling to be measured and paid for separately) Galvanised iron wire 5 milimetre thick corressponding to SWG-6 (15 centimetre x15 centimetre mesh) within all leads and lifts as per the direction of Engineer-in-charge. | 8,187.71 | Per Square metre | 405 ₹33,16,022.55 | 296 ₹24,23,562.16 | 151 ₹12,36,344.21 Lowest | 250 ₹20,46,927.5 | 425 ₹34,79,776.75 | 295 ₹24,15,374.45 | 319 ₹26,11,879.49 | 350 ₹28,65,698.5 | 275 ₹22,51,620.25 | 295 ₹24,15,374.45 | 350 ₹28,65,698.5 |
| 10.00 | Providing and laying geotextile filter behind stone pitching and crate appron having thickness not less than 2.50 mm (Two and half) and minimum weight 275 Gms/Sq. mtr (Two hundred sewenty five) in suitable width including lap folding and jointing etc. Not less than 4 metre in width complete including carriage of materials with in all lead and lifts as per satisfaction of the engineer in charge. | 833.53 | Per Square metre | 150 ₹1,25,029.5 | 100 ₹83,353 | 125 ₹1,04,191.25 | 105 ₹87,520.65 | 150 ₹1,25,029.5 | 135 ₹1,12,526.55 | 85 ₹70,850.05 Lowest | 160 ₹1,33,364.8 | 320 ₹2,66,729.6 | 180 ₹1,50,035.4 | 100 ₹83,353 |
Tender Value
₹2.0 Cr
EMD Value
₹2.7 L
Closing Date
1 Sept 2025, 5:00 pmClosed
EXECUTIVE ENGINEER
JAL SHAKTI DIVISION PALAMPUR
Construction of Retaining wall RD 0 to 50 Rmt. and Stud Near Neugal Bridge and Retaining wall RD 450 to 515 65 Rmt. and 1 No. Spur
2025_HPIPH_112656_1
HPIPH 3792-3842 DATED 21.08.2025
Open Tender
Civil Works
Item Rate
365 days
PALAMPUR
Please refer Tender documents.
9 documents required · 9 mandatory
₹5,000
EXECUTIVE ENGINEER
₹2.7 L
24 Oct 2025
21 Aug 2025
2 Sept 2025
21 Aug 2025
1 Sept 2025
21 Aug 2025
Amount
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.within all leads and lifts as per the direction of Engineer-in-charge
Providing and laying cement concrete 1:4:8 (One cement : four sand : eight graded stone aggregate 40 milimetre nominal size) and curing complete excluding the cost of form work in foundation and plinth within all leads and lifts as per the direction of Engineer-in-charge
Providing and laying cement concrete 1:2:4 (One cement : two sand : four graded stone aggregate 40 milimetre nominal size) and curing complete excluding the cost of form work and reinforcement for reinforced cement concrete in:- Foundation,footings bases of column and the like mass concrete within all leads and lifts as per the direction of Engineer-in-charge
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3 (1 cement : 1.5 coarse sand) : 3 graded stone aggregate 20 mm nominal size) within all leads and lifts as per the direction of Engineer-in-charge
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:5:10 (1 cement : 5 coarse sand): 10 graded stone aggregate 40 mm nominal size) within all leads and lifts as per the direction of Engineer-in-charge
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Mild steel and Medium Tensile steel bars within all leads and lifts as per the direction of Engineer-in-charge
Providing form work with steel plates 3.15 milimetre thick welded with angle iron in frame 30x30x5 milimetre so as to give a fair finish including centring,shuttering,strutting and propping etc.with wooden battens ballies,height of propping and centring below supporting floor to ceiling not exceeding 4 metre and removal of the same for in-situ-reinforced concrete and plain concrete work in:-Vertical surfaces such as walls(any thickness)partitions walls and the like including attached pillasters,buttreses plinth string courses and the like within all leads and lifts as per the direction of Engineer-in-charge.
Stacking of stone within 20 mtrs. of the unloading point in stacks of specified size. pitching,stone, spalls, bricks-batsbuilding stones, ballast, stone metal, coal or shinglecomplete in all respect with in all leads & lifts as per the direction of Engineer-in-charge.
Wire crates made of galvanised iron wire filled with boulders with square cut faces against the wire. (Boulder filling to be measured and paid for separately) Galvanised iron wire 5 milimetre thick corressponding to SWG-6 (15 centimetre x15 centimetre mesh) within all leads and lifts as per the direction of Engineer-in-charge.
Providing and laying geotextile filter behind stone pitching and crate appron having thickness not less than 2.50 mm (Two and half) and minimum weight 275 Gms/Sq. mtr (Two hundred sewenty five) in suitable width including lap folding and jointing etc. Not less than 4 metre in width complete including carriage of materials with in all lead and lifts as per satisfaction of the engineer in charge.
Providing and laying 15 cm thick sand layer on top of geotextile fabric filter to protect it including carriage of material within all leads and lifts as per the direction of Engineer-in-charge.
Wire crates of galvanised iron wire filled with boulders with square cut faces against the wire. (Wire crates to be measured and paid for separately) within all leads and lifts as per the direction of Engineer-in-charge.
GANTANTAR THAKUR (BID ID -549935)
SUBHASH CHAND GOVT. CONTRACTOR (BID ID -549564)
VIJAY KAPOOR (BID ID -550126)
ABHINAV DHIMAN (BID ID -549959)
KARUN KUMAR (BID ID -549951)
Anubhav Sharma (BID ID -550067)
Rakesh Kumar (BID ID -549555)
RAMESH CHAND PARIHAR (BID ID -550120)
Shashank Jagota Govt. Contractor (BID ID -550078)
Sohan Singh Govt. Contractor (BID ID -548429)
stage.html
html • 0.07 MB
technical_164282.pdf
techsummary_164282.pdf
finance_164282.pdf
BOQ Comparative Chart
xlsx
finsummary_164282.pdf
cancelled_1.pdf
pdf • 0.48 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.37 MB
Termsandconditions.pdf
Tender Documents • 0.10 MB
BOQ_164282.xls
BOQ • 0.24 MB
Form6.pdf
Tender Documents • 0.58 MB
Form8.pdf
Tender Documents • 1.18 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .