Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance F 33 3 OKHLA INDUSTRIAL AREA PHASE 2 DELHI 110020 | SOUTH | DELHI | 110020 | Admitted-Finance |
| 2 | Admitted-Finance B 10 KRISHNA INDUSTRIAL ESTATE OPP B I D C GORWA ESTATE VADODARA 390016 GUJARAT | VADODARA | GUJARAT | 390016 | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
2 Jan 2025, 3:00 pmClosed
Regional Officer
Regional Office MoRTH,House No 281,Sector-1,Channi Himmat ,Jammu.
PMC services for FS, preparation of DPR, providing pre-construction services and Construction supervision of construction for 2 lane with PS of NH 701A for Shopian Kellar Pakherpora Yousmarg Doodthpathri Magam in the UT of JK .
2024_MoRTH_832853_1
RO/JK/PMC/NH-701A/58/2024
Open Tender
Consultancy
Works
3060 days
Srinagar
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,900
RPAO MoRTH
Exempted
Jammu
18 Jun 2025
28 Oct 2024
3 Jan 2025
28 Oct 2024
2 Jan 2025
28 Oct 2024
28 Oct 2024 - 12 Nov 2024
12 Nov 2024
Amount
For Phase 1 & 2 (DPR and Pre-Construction Activities) Remuneration for Local Staff (inclusive of per Diem allowance) (Normal Highway Project) Profesional Staff
Team Leader cum Senior Highway Engineer
Senior Bridge Engineer
Highway cum Pavement Engineer
Meterial cum Geotechnical Engineer - Geologist
Senior Survey Engineer
Road/Traffic Safety Expert
Environmental Specilist
Quantity Surveyor / Documentation Expert
Land Acquistion Expert
Utility Expert
Sub-Total-1
SUB-PROFESSIONAL STAFF :(To be assessed by consultant as per requirement of assignment and one sub professional be a fresh graduate)
Sub-Professional-1
Sub-Professional-2
Sub-Professional-3
Sub-Professional-4
Sub-Professional-5
Sub-Professional-6
Sub-Professional-7
Sub-Total-2
Total(Sub Total 1 + Sub Total 2)
SUPPORT STAFF(inclusive of per diem allowance)
Office Manager
Typist
Office Boy
Night Watch ment
Total:
Transportation (Fixed Costs)
Innova/Scorpio or equivalent 4 x 4 vehicles (not more than 2 years old) (2*18) Rate per month
Bolero or equivalent 4 x 4 vehicles (not more than 2 years old) (1*18) Rate per month
Total:
Duty Travel to Site(Fixed Costs): Trips
Employers HQ
Other Trips
Total:
Office Rent (Fixed Costs) The rent includes maintenance, cleaning, repairing etc. (Rate per Month)
During DPR & Pre-construction
Total:
OFFICE SUPPLIES, UTILITIES AND COMMUNICATIONS (Fixed Costs)
Office Supplies
Drafting Supplies
Computer Running Costs
Domestic and International Communication
Total:
OFFICE FURNITURE AND EQUIPMENT (Rental)
Office Furniture and Ecquipment (LS)
Total:
REPORTS & DOCUMENTS PRINTING ( For Clubbed Projects)
Monthly report (3 copies per Month)
Inception Report & QAP
Environment and Social Impact Screening Report
Draft Feasibility Report
Final Feasibility Report
Strip Plan with LA Reports
Draft LA and Clearances I Report
Final LA and Clearances I Report
Draft Environmental Assessment Report & RAP
Final Environmental Assessment Report and RAP
Draft Detailed Design Report & Drawings etc.
Draft EMP
Draft Bidding Documents
Final Detailed Project Report with Bill of Quantities, Cost Estimates, Updated Drawings etc.
Final EMP.
Final Bidding Documents
Draft 3(a),3(A) and 3(D) notification for land acquisition (3 copies each)
LA & Clearances II Report
Total:
Survey and Investigation: A. Topographical Survey (Fixed Rate)
Topographic Survey including hire charges for equipment and supply of survey teams comprising of project survey filed staff etc. inclusive of cost of materials, labourer.
Detailed topographic surveys using mobile / aerial LiDAR or better Technology
B. Investigation (Fixed Cost)
Road and Bridge Inventory
FWD Test and Pavement Evaluation
Roughness Survey
Axle Load Survey
Material Survey and Investigation
Sub-grade Investigation
Traffice Survey
Socio-economic & Census Survey/Studies
Land Acquisition Studies
Any other Investigations/Surveys
Sub-Soil Investigation (Boring) Note:*Quantities of boring shall be taken from Financial Proposal Form No.V. for financial evaluation, the sequantities and rates quoted by the consultant will be considered. However, payment shall be made on the actual quantity of boring at rates quoted above by the consultant, which may be substantially more or less than the estimated quantities.
a) Boring in all type of soils (other than hard rock)
b) Boring in hard rock
Total:
C. Network Survey and GPR
Network Survey of the existing Highways as a repository for civil works as per directions from Authority.
GPR Survey for detection of under ground utilities
Total:
Cost of Supply and Fixing Boundary pillars
Procuring and fixing boundary pillars and its installation, complete in all respect as per IRC:25,1967: Wherever the proposed alignment follows the existing alignment, the boundary pillars shall be fixed atan interval of 200m on either side of proposed Right of Way. Wherever there is a proposal of realignment of the existing Highway and/ or construction of New Bypasses, Consultant shall fix boundary pillars along the proposed alignment on the extreme boundary on either side of the project Highway at 50 m interval. (lumpsum )
Total:
Land Acquisition Team including support staff and logistics/ transportation. A. Land Acquisition Team including support staff :
Ex-Land Revenue Inspector/ Officer or equivalent (1*8)
Ex-Kanoogo/Girdwar or equivalent (1*8)
Ex-Patwari or Equivalent (1*8)
Typist (2*8)
Number of Land acquisition Teams (One Only)
Grand Total for All Land acquisition Teams(A)
B. Logistics for Land Acquisition Team
Computer including necessary peripherals (2*8)
Printers (2*8)
Vehicles (Bolero or Equivalent) with monthly running limit of 4000 km (1*8)
Number of Land acquisition Teams (One Only)
Grand Total (B)
Grand Total for All Land acquisition Teams and Logistics (A) + (B)
Estimate of Local Currency costs B. FOR PHASE 3 (CONSTRUCTION SUPERVISION AND MAINTENANCE) . REMUNERATION FOR LOCAL PROFESSIONAL STAFF For Normal Highway Project Construction Period 24 months+DLP 60months
Team Leader cum Senior Highway Engineer
Resident cum Highway Engineer (2 nos)
Bridge/Structural Engineer
Senior Pavement Specialists
Senior Quality cum Material Expert
Road Safety expert
Sub-Total(A)
B: Sub Professional Staff Construction Period 24 months+DLP 60months
Survey Engineer (2 nos)
Assistant Highway Engineer (3 nos)
CAD Expert
Environmental Engineer
Assistant Bridge Engineer (2 nos) (number may be increased to 3 if no. of bridges and structures are more and total man-month are accordingly corrected.
Assistant Quality cum Material Engineer (3 nos)
Electrical Engineer
HTMS/Toll Expert
Quantity Surveyor
Horticulture cum Landscaping Expert
Lab Technician (4 Nos)
Document/Data Entry Operator
Sub-Total (B)
Total (A+B)
Support Staff
Office Manager
Accountant cum cashier
Steno cum Computer Operator
Office Boy (1 no)
Total
Transportation (Fixed rate on rental basis) The vehicles provided by the consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc., for all complete approx 4000km/month run
Description of Vehicles
Innova/Scorpio or equivalent 4 x 4 vehicles (not more than 2 years old) (3 nos during Construction Period and 1 nos During Development and O&M Period), (3*24+1*30) Rate per month
Bolero or equivalent 4 x 4 vehicles (not more than 2 years old) (1 nos during Construction Period and 1 nos During Development and O&M Period), (1*24+1*60) Rate per month
Total
Duty Travel to Site(Fixed Costs) (for all lengths of projects): Professional and Sub-Professional Staff. *Rate quoted includes Hotel charges, travel cost etc, complete (Trips)
For 40 round trips to Employers HQ
For 40 round trips to Other Trips
Total
Office Rent (Fixed Costs)- Minimum 200 sqm area of office shall be rented. The rent cost includes electricity and water charges, maintenance, cleaning, repairs, etc. (Rate per Month)
200 sqm (During Construction)
50 sqm (During Maintenance)
Total
Office Supplies, Utilities and Communication (Fixed Costs), Rate per Month
Office Supplies
Drafting Supplies
Computer Running Costs
Domestic and International Communication
Total
Office Furniture and Equipment (Rental) The cost shall include rental charges towards all such furniture and equipment as required for proper functioning of office. Office furniture shall include executive tables, chairs, visitor chairs, steel almirahs, computer furniture, conference table etc. Office equipment shall include as a minimum of telephone (2external &10 internal lines), photocopier (15ppm, 12000copies per month with A3 & A4 input) fax machine, PCs(5 No., Intel Core 2 Duo E8300, 19’’ colour TFT, Cache-6MB, RAM-2 GB, HDD-250 GB, DVD Writer, Key board, optical scroll mouse, MS- Windows Vista Business, pre-loaded anti-virus etc.), laser printers (2 no., 14 ppm, 266 MHZ, 5000 pages per month, 600x600 dpi or better etc., Engineering Plan printer (1 no.), binding machine (1 no.), plotter A0 size, overhead projector, AC (4 no., 1.5 Ton), Water Coolers (as required)etc.
During Construction
During Maintenance
Total
Reports and Document Printing ( rate as per copy)
Monthly reports (Design and Construction) ((24+60)*3)
Half yearly Reports (8*3)
Various others reports as provided in the Concession Agreement such as Completion Report (4*3)
Total
Road Survey Equipment (Rate per Km) The cost shall include carrying out survey using equipment, manpower, software and report processing.
Surface defects detection and roughness measurement using Network Survey Vehicle. Kms - 75 No. of times survey to be conducted - 8 (75*8)
Pavement strength measurement using FWD Kms - 75 No. of times survey to be conducted - 4 (75*4)
Bridge inspection using Mobile Bridge Inspection Unit or Drone technology Kms - 75 No. of times survey to be conducted - 8 (75*8)
Road signs inspection using Retro Reflectometer Kms - 75 No. of times survey to be conducted - 8 (75*8)
Total
Estimate of costs for Expatriate consultants (in Indian Rupees) I. REMUNERATION OF EXPATRIATE STAFF including per diem allowances.
Staff
Sub-Professional-1
Sub-Professional-2
Sub-Professional-3
Sub-Professional-4
Sub-Professional-5
Sub-Professional-6
Sub-Total-I
II. Mobiliation and Demobilization
A. International Airfares (Fixed costs)
B. Inland Travel in Home Country (Fixed costs)
C. Other Missc expenses (like DA, internal travel expenses other incidentals)
Sub-Total-II
Total (I+II)
Contigencies
A fixed amount of Indian Rupees ONE MILLION shall be included in the Financial Proposal. The provisions of contingency shall be operated with the specific approval from the Competent Authority in <agency> (Fixed as Rs. 10,00,000) to be entered by bidder.
Grand Total:
TECHNICAL CONSULTANCY SERVICES (BID ID -3147694)
Institute Giprostroymost (BID ID -3146889)
Lion Engineering Consultants Private Limited (BID ID -3147824)
Almondz Global Infra Consultant Limited (BID ID -3148282)
Geo Designs and Reserch Pvt. Ltd. (BID ID -3147715)
Technocrats Advisory Services Pvt. Ltd. (BID ID -3143579)
SA Infrastructure Consutants Pvt. Ltd. (BID ID -3148083)
ISAN CORPORATION (BID ID -3145877)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .