Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.2 LAdmitted-Finance N A | -25.21% | ₹3.2 L | L1 | Admitted-Finance |
| 2 | L2₹3.8 LAdmitted-Finance V P O GANVI TEH RAMPUR DISTT SHIMLA | GANVI | SHIMLA | HIMACHAL PRADESH | -10.00% | ₹3.8 L | L2 | Admitted-Finance |
| 3 | L3₹4.0 LAdmitted-Finance VILL KIYAR PO JEORI TEHSIL RAMPUR DISTT SHIMLA | SHIMLA | HIMACHAL PRADESH | 171001 | -5.00% | ₹4.0 L | L3 | Admitted-Finance |
Tender Value
₹5.0 L
EMD Value
₹4,975
Closing Date
15 Apr 2026, 9:00 amClosed
Resident Engineer
Resident Engineer, GPHD, Jeori
Gardening and watering of plants and Flower pots, complex of 2.5 MW Nogli Power House uprooting the grass from Power House Sub-Div work shop office complex and Sweeping and Cleaning in side of Power House Machine Hall, Mechanical Room, Fore Man Roo
2026_HPSEB_133802_1
HPSEBL/GPHD/DB-9/2026-27-028
Open Tender
Manpower Supply
328 days
Nogli
Please refer Tender documents.
5 documents required · 5 mandatory
₹590
₹4,975
18 Apr 2026
9 Apr 2026
18 Apr 2026
9 Apr 2026
15 Apr 2026
9 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1Work Details | ||||||
| 1.01 | Gardening and watering of plants and Flower pots, complex of 2.5 MW Nogli Power House uprooting the grass from Power House Sub-Div work shop & office complex .
Sweeping and Cleaning in side of Power House Machine Hall, Mechanical Room, Fore Man Room, Control Room Work Shop etc. Complete in all respect as per requirement and as per Dirction of EIC. , For the period w.e.f. 08.05.2026 to 31.03.2027 (328 days).
Providing 2 Nos Sweeper/Beldar for this work for the period 08.05.2026 to 31.03.2027 (328 days).
NOTE:- (1) The work will be suspended immediately if the services are not found satisfactory or HPSEBL provides its own man power for the propose.
(2) Number of labour can be increase / decrease as per urgency of work.
(3) The materials/T&P required will be provided by the Contractor.
(4) Contractor will be responsible for any fatal / non-fatal accident during the work.
(5) The G.S.T @18% will be paid /born by HPSEBL extra. The same shall be deposited by the contractor himself. | - | Job | - | - | item2 |
stage.html
html • 0.03 MB
techsummary_197802.pdf
BOQ Comparative Chart
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.29 MB
BOQ_197802.xls
BOQ • 0.33 MB
28tendert.pdf
Tender Documents • 0.77 MB
Download all tender documents and submit your bid