S.E.,Construction Circle(E/M), UPJN(U), Ghaziabad
office of The S.E., Construction Circle (E/M), UPJN (Urban), Ghaziabad.
Comprehensive Operation and Maintenance of 100 MLD Water Treatment Plant Located at Bhola ki Jhal, Meerut and clear water feeder main including supply of Consumables and other appurtenant works.
2026_UPJNM_1205419_1
1094/NIVIDA/156
Open Tender
Miscellaneous Works
Percentage
Meerut
Please refer Tender documents.
3 documents required · 3 mandatory
₹11,800
Executive Engineer, C.D (E/M), UPJN(Urban)
₹6.3 L
Ghaziabad
4 Nov 2026
4 Nov 2026
5 Dec 2026
4 Nov 2026
4 Dec 2026
4 Nov 2026
13 Nov 2026
120 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Civil Works | - | - | - | - |
| 2 | Cleaning and removal of settled silt/sludge from settling tanks twice a year of the Water Treatment Plant (WTP), including loosening, scooping, lifting and loading of the silt using suitable mechanical/manual means and transportation of the silt/sludge to a location outside the WTP campus as designated by the Engineer-in-Charge. The work includes cleaning the entire floor and slope areas of the settling tanks, ensuring complete removal of sludge, proper disposal of waste material at an approved site, and ensuring no damage to civil structures during operation. The cost includes supply of labour, T&P, loading/unloading, vehicle hire, and all incidental charges for complete execution as per direction of Engineer-in-Charge. Raw Water Pump House and Receiving Channel: if requires construction of separation wall 2.5mX2 m in passage required for ensuring continous water supply during cleaning desilting and cleaning of raw water pump house floors, pump bays, suction chambers, and open receiving channels. Includes removal of trash and sludge from screens, suction sumps and channel linings. | 6,524 | Nos | 184 | ₹12,00,416 |
| 3 | Providing and applying food-grade epoxy painting on internal surfaces of all clariflocculator (CLF) units, including thorough surface preparation such as cleaning, surface grinding, removal of laitance, oil, or contaminants; followed by application of compatible epoxy primer and two coats of food-grade epoxy paint conforming to IS 9833 and approved for potable water use. The epoxy coating shall be non-toxic, chemical-resistant, and suitable for continuous water immersion, achieving a minimum DFT (dry film thickness) of 300 microns.In addition, all metal fixtures, MS components, gates, and embedded mechanical parts in the CLF unit shall be cleaned using wire brushing and anti-corrosion treatment, and then painted with two coats of high-quality anti-corrosive enamel or epoxy-based metal primer and finish paint. All work shall be executed to the highest standards using appropriate tools, labour, scaffolding, and safety measures, as per directions of the Engineer-in-charge. | 3,535 | Nos | 345 | ₹12,19,575 |
| 4 | Comprehensive Cleaning of Water Treatment Units Annual cleaning of the potable water reservoir during the Ganga Nahar canal maintenance shutdown period (October–November).
This item covers the systematic and scheduled cleaning, desilting, and disinfection of key raw and potable water handling structures within the Water Treatment Plant. All cleaning activities shall include removal of deposited sludge, algae, silt, and biofilm from bottom and wall surfaces, followed by antibacterial treatment using UV-based or approved food-grade disinfectants. All operations must be documented with photographs and logs, and carried out in accordance with best hygiene and safety practices.
1 Clariflocculators Including Flash Mixers (03 Nos):
Biannual cleaning of all clariflocculator units including internal walls, flocculation chambers, and flash mixer zones. Each cycle to include mechanical removal of sludge and residues, thorough scrubbing, and disinfection of all surfaces. Cleaning shall be carried out twice a year | 8 | Nos | 18,800 | ₹1,50,400 |
| 5 | 2. Clear Water Reservoir (CWR – 1250 KL):
complete dewatering, mechanical and manual cleaning of floor and walls, disinfection using UV-based sanitisation, and restoration for potable water storage. | 1 | Nos | 1,75,000 | ₹1,75,000 |
| 6 | 3. Constant Pressure Tank (425 KL):
complete dewatering, cleaning of internal RCC surfaces and hatches, and antibacterial treatment to maintain safe storage of filtered water under pressurised conditions. | 1 | Nos | 50,000 | ₹50,000 |
| 7 | 4. Filter Bed House:
Comprehensive cleaning of all filter beds, backwash troughs, underdrain channels and operating platforms . Includes removal of accumulated sludge, cleaning of gravel and sand media without disturbing their grading, flushing of backwash pipelines, and complete sanitation of the filter house structure | 8 | Nos | 25,000 | ₹2,00,000 |
| 8 | Annual Comprehensive Horticulture Maintenance Work Within WTP Campus over 1.5 acre landscaped area, including routine watering through installed irrigation system, trimming and mowing of lawn grass, weeding, hoeing, pest control, termite treatment, pruning of shrubs and creepers, daily cleaning of garden area, maintenance of potted plants and climbers,Twice yearly plantation and maintenance of seasonal flowering plants (summer and winter cycles). stacking and application of manure, fertilisers, and garden soil, operation and repair of PVC irrigation network, and general upkeep including watch and ward. Contractor shall ensure healthy and presentable greenery throughout year.Minimum 01 experienced and dedicated gardeners (Mali) must be deployed on all working days.Monthly performance shall be reviewed based on visual inspection, completeness of coverage, and plant health.
• A deduction of 2% of monthly payment per instance shall be applicable in case of:
a) Patchy, dried, or unmaintained lawn areas.
b) Dead or missing flower plants beyond 10% of planted quantity.
c) Irregular irrigation or visible signs of water stress.
d) Absence of required gardening staff on site for more than 2 consecutive working days without approval. | 12 | Nos | 1,10,000 | ₹13,20,000 |
| 9 | Comprehensive Quarterly Maintenance of Feeder Mains (Leakage Repair, Valve Maintenance & Road Reinstatement):
entire feeder main pipeline system laid within and outside the WTP premises, including routine patrolling, identification of leakages, immediate repair works, and complete restoration of the pipeline. The feeder main consists of pipelines of various diameters viz. 1500 mm, 1200 mm, 1000 mm, 800 mm, and 700 mm, and passes through various road sections and crossings. The contractor shall be responsible for locating any leakage or damage, excavation of the area, and cutting, removal, and replacement of the damaged section of pipe along with adjoining lengths on both sides, as required to ensure complete and durable rectification.
All associated works including dewatering, removal of debris, supply and fixing of required joints/gaskets, reconnection of the system, testing of leak-proof performance, and reinstatement of the dismantled road surface (as per original condition CC/BT/interlocking as applicable,) shall be in the contractor’s scope and cost. under the supervision of the Engineer-in-Charge and a joint logbook shall be maintained for all such interventions.In case of any leakage or failure reported in the feeder main pipeline, the contractor shall be bound to take immediate action and rectify the same within 48 hours of reporting. Failure to attend the leakage within this stipulated time shall attract a monetary penalty,perleakage per day recoverable from the contractor’s running or final bills. The penalty shall be imposed based on the pipe diameter involved: ₹10,000 for 1500 mm dia, ₹8,000 for 1200 mm dia, ₹6,000 for 1000 mm dia, and ₹5,000 each for 800 mm and 700 mm dia pipelines. The item also includes maintenance, greasing, tightening, and repair (as required) of all inline valves such as scour valves, sluice valves, reflux valves, and air valves along the feeder main alignment. Defective or damaged valves must be repaired or replaced immediately using suitable mechanical equipment and materials | 12 | Nos | 1,50,000 | ₹18,00,000 |
| 10 | Comprehensive painting work for the entire Water Treatment Plant (WTP) campus, including all existing structures and units such as treatment buildings, chemical house,bakwash control room, pump house, guard room, store, chlorination unit, reservoirs, staircases, compound walls, internal fencing, gates, and any other building or structure situated within the WTP premises include meticulous surface preparation, scrapping of old paint, cleaning, application of primer as required, and provision of three-coat painting (1 coat primer + 2 coats synthetic enamel/acrylic weather-proof paint) of approved shade and make, ensuring aesthetic uniformity throughout the campus. Before the painting, major repaeir works of roofs & ceilings if required minor civil repairs such as patch plastering, crack sealing, surface levelling, filling of chipped areas, and replacement of damaged portions (without changing major structural elements) shall be executed wherever necessary to provide a smooth and sound surface for painting. The contractor shall undertake a thorough pre-painting inspection of all units jointly with the Engineer-in-Charge and carry out all necessary preparatory works. All tools, plants, scaffolding, manpower, safety measures, transportation, and consumables shall be arranged by the contractor at his own cost. The final appearance of painted structures shall be clean, uniform, and professionally finished, giving the WTP a visually pleasing and well-maintained look. | 12 | Nos | 1,10,000 | ₹13,20,000 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.40 MB
BidDocument.pdf
Tender Documents • 27.12 MB
BOQ_2284041.xls
BOQ • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .