Loading…
Loading…
54 live32 closing this weekmost from U P Jal Nigam (HQ), Lucknow
54 results • Latest
Supply of all materials, labour, T and P required for Shifting of the 0.443 km existing Trunk Sewer Line of 300 or 350 mm dia RCC NP-3 Pipe at Vikramaditya Marg, Lucknow including, survey, investigation, dismantling and excavation of roads
Development of Horticultural Works at 120 MLD WTP Campus under Combined 50 Cusec Water Supply Scheme Siddharth Vihar Ghaziabad
Supply of all materials labour Tand P required to provide water Supply and sewerage facility in District Judge Compound Lucknow
Operation and Maintenance of Lift Station at Trauma Center BHU Varanasi.
Operation, watch and ward of SCADA automation work of water supply Trans Varuna, Varanasi associated intake well, WTP and 32 Nos. OHT and CWR.
Breakdown and major repair, replacement work of Mansarover Ghat SPS and Trilochan Ghat SPS at Varanasi.
Operator for Operation, Watch and ward, Report Generation at SCADA MCS room of all sewage pumping stations, main pumping stations, including OCEMS of all STPs Varanasi
Complete Repairing, Overhauling, Supply and Replacement of SS Ring, Studs, etc as required for volute press at 80 MLD STP, Dinapur, Varanasi.
Breakdown and major repair, major replacement work and Desilting, cleaning of pump well, sump well and special sump well etc. work at Dr. R.P.Ghat SPS, Varanasi.
Running, Operation and cleaning of chockage material from manual screen at Harishchandra Ghat SPS, Varanasi.
Supply, Installation, commissioning and Testing of Non-Clog Sewage Submersible Pumpsets at Main Pumping station (M.P.S) Rukmani Vihar and (M.P.S.) Rajpur Khadar under Vrindavan Sewerage scheme, Distt. Mathura
Regular cleaning an maintenance of 48 Nos Nala Tapping Screens installed on various drains tapped in Sewerage Network including cleaning of silt / malba upto 3.0 M length of existing Nala in Nagar Nigam Prayagraj area of District - Prayagraj
Supply Installation Testing and Commissioning of 01 No 400 KVA CPCB IV plus Silent DG Set with AMF Panel at 15 MLD STP Jharkhandi Mahadev Gorakhpur
Routine Operation and Preventive maintenance work of 120 MLD STP, TEPS, MPS Goithaha and Narokhar IPS at Varanasi As is where is basis
Painting of Filter House Filter Annexe Chlorine Building Sludge Thickener Centrifuge Building Dirty Back Wash SumpInlet Chamber Outer Side of Clariflocculator and Boundary Wall at 245 MLD WTP Siddharth Vihar Ghaziabad
Survey design, supply, laying, testing, commissioning and shifting of 1100 mm dia M.S. Rising main (12mm thick) at Bichpuri, Nagar Nigam, Agra area, District, Agra including all associated and appurtenant works on turnkey basis.
Supply of stable Grade I bleaching powder including its loading and unloading at Prayagraj under Magh Mela 2026-27
As Per Attatched Tender Document
Integrated Manufacturing Logistic Cluster IMLC Water Supply Scheme District Unnao UP
Construction of 02 Nos. R.C.C. Manholes by well sinking Method and other related work near Arya Samaj Mandir and Beauty Touch Salon on Ram Chandra Mission Road, Mundera in Sewerage District- E of Nagar Nigam Prayagraj
Operation, watch and ward of 1No 3.75 MLD STP, 1 No Sewage pumping station and 5 Nos Tube wells pumping plant along with all connected electrical and mechanical equipment.
Laying of rising main 150 mm dia for Disposal of Sewage at Jajmau Kanpur
Investigation Survey (On G.I.S. Basis) Construction of Interception Diversion works with treatment facilities alongwith treated effluent line etc. in following zone of, in Faridnagar Nagar Panchayat, Distt- Ghaziabad U.P., India
Investigation Survey (On G.I.S. Basis) Construction of Interception Diversion works with treatment facilitiesalongwith treated effluent line etc. in following zone of, in Patla Nagar Panchayat, Distt- Ghaziabad U.P., India
INTERCEPTION AND DIVERSION I AND D OF DRAINS AND CONSTRUCTION OF A 12 MLD SEWAGE TREATMENT PLANT STP WITH CO TREATMENT AND ASSOCIATED WORKS IN NAGAR PALIKA PARISHAD MUBARAKPUR DISTRICT AZAMGARH UNDER THE SBM U 2.0 PROGRAMME
Investigation, Survey (On G.I.S. Basis) Construction of Waste Stabilization Pond 600 KLD,100KLD with 3KLD co-treatment plant I and D of drain and Structure treated effluent line with SCADA etc
MS fencing work and other painting work at Primary treatment work Intek Dasna under 50 Cusec water supply scheme Ghaziabad
MS fencing work and other painting work at Primary treatment work Intek Dasna under 100 Cusec water supply scheme Ghaziabad
Construction of Boundary wall for 120 MLD WTP Campus and Staff Quarters at Siddharth Vihar Ghaziabad under Combined 50 Cusec Gangajal Water Supply Scheme
Carting, installation of firehydarant on bypass chamber, construction /renovation of bypass chamber of tubewell and other required work in tubewell campus like bricksolling etc for Magh Mela 2026-27
Arrangement of Electrician, , D.G. Mechanic, Sweeper, Chlorine checking staff and Camp attandent at different Tubewell Locations Under Magh Mela 2026-27
Shifting, Loading, Carting and Unloading Installation, Testing, Commissioning and Dismentalling after Mela of the Pumping Plant (28 Nos), Dozer (56 Nos) , D.G. set (28 Nos) and Stabilizer etc all complete from Mela Store to different Tubewell site in
Watch AND Ward and operation of Submersible Pumping Plant (28 Nos), Dozer (56 Nos) and D.G. set (28 Nos) etc all complete, dully installed at Various Tubewells Under Magh Mela 2026-27
Intercepting sewer line Gravity main Treated Effluent Main 10.00 MLD Sewage Treatment Plant at Nagar Palika Parishad Mahoba District Mahoba
Treatment of grey water(without septage) in Magh mela Area on Eastern and Western side of river Ganga by Bio remediation or any other non conventional innovative and proven technologies for Magh Mela 2027
CONSTRUCTION OF BRICK SOLING and APPURTENANT WORKS UNDER MAGH MELA 2027
COSTRUCTION OF KACCHA DRAIN and APPURTENANT WORKS UNDAR MAGH MELA 2027
Installation, Testing, Commissioning, Operation and Maintenance of 10 Nos Water ATM in Magh Mela 2026-27
Construction of RCC OHT and 01 Nos. Tubewell
Construction of Interception Drain, Construction of STP, Construction of Grit Chamber, Construction of Chlorine Tank, Construction of Co-treatment Plant, Construction of Leach Pit with silt chamber etc.
Construction of Interception Drain, Construction of STP, Construction of Grit Chamber, Construction of Chlorine Tank, Construction of Co-treatment Plant, Construction of Leach Pit with silt chamber etc.
Construction of Interception Drain, Construction of STP, Construction of Grit Chamber, Construction of Chlorine Tank, Construction of Co-treatment Plant, Construction of Leach Pit with silt chamber etc.
Construction of Interception Drain, Construction of STP, Construction of Grit Chamber, Construction of Chlorine Tank, Construction of Co-treatment Plant, Construction of Leach Pit with silt chamber etc.
Construction of Interception Drain, Construction of STP, Construction of Grit Chamber, Construction of Leach Pit with silt chamber etc.
Construction of interceptor drain,1000kld STP,300kld Stp 2 nos
Construction of 400kld Stp,38nos leach pit each having 10kld ,Interception of drain
Construction of interception drain,700,400kld Stp 16 nos leach pit each capacity 10kld
Construction of interceptor drain,500kld Stp 4 kld co treatment 10nos leach pit each pit capacity having 10kld
construction of interception drain ,300,400 kld Stp 700 kld co treatment and 13 nos leach pit
Construction of interception drain 700,500,400kld stp leach pit 10 nos each have 10kld