Loading…
Loading…
Found 45 active tenders
45 results • Latest
EXTENSION OF PIPELINE OF KANPUR WATER SUPPLY SCHEME EAST AND SOUTH SERVICE DISTRICT UNDER AMRUT 2 0 PROGRAMME
Civil Works: Provide vetted design & drawings from IIT on bearing capacity of soil , Supply of all materials, labour, T&P etc. and construct an RCC over head tank of following capacity with respective staging at diffirent location casted in M-30 concrete with cement, coarse sand and approved stone grit as per I.S. 11682 and I.S. 456:2000 with RCC staircase and 1m wide balcony with 20mm dia G.I. Pipe raling and RCC posts around the balcony and at the dome periphery, M.S. ladder from the balcony to the top of tank and inside the tank, supply and fixing M.H. cover with locking device, ventilator, lightening conductor, digital water level indicator, fixing of puddle collars and bell mouths, supply and fixing M.S. clamps with RCC coloumn, 25 mm thick PCC 1:2:4 floor over 80 mm PCC 1:4:8 in appron, 150 mm semicircular drain around the tank, escape channel of 20m length, box type enclosure at the entrance of the staircase having locking arrangements, two coats of approved Apex ultima paint and testing of tank for water tightness, testing of bearing capacity of soil for proposed water works etc. and also including the cost of supply and fixing of all necessary CI D/F pipes for Inlet,outlet,overflow,washout pipes, valves and their respective chambers etc. all complete including site clearance and other unforeseen items for all zone. making arrangment for disposal of overflow water to Distribution main Pipe and washout chamber to suitable point outside the water works compound including excavation of trenches, laying of pipe line and construction department office building of 400sqm at location decidedby department etc. complete. Naubasta(Sakrapur)950 Kl with 22 m staging
Augmentation of Existing Water Supply System in Ward No. 47 Purvahiran School Campus
Augmentation of Existing Water Supply System in Ward No. 47 Purvahiran School Campus.
Construction of OHT PH SQ BW and TW laying of distribution and rising main repairing of OHT etc other related works in Bareilly Reorg Water Supply Scheme Phase 1 Distt Bareilly
PUMP HOUSE
Survey, soil invest. ,design drawing for const., erection, completion, testing and comm. of water supply work such as CWR, Feeder main, Pumping main related E.M work for Connection of Multan Nagar OHT from existing GangaJal feeder main in Meerut
CWR (Clear Water Reservoir)
Augmentation of Existing Water Supply System in Ward No. 15 Multannagar
Augmentation of Existing Water Supply System in Ward No. 15 Multannagar.
Shifting and laying of Water pipe line under CM Grid Programme
Supply of following size pipes including frieght, insurance and all taxes (Excluding GST), unloading and local carting etc. complete. HDPE PN-10 I.S.- 14333/1996 110mm dia