| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.6 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹12.6 L+₹2.44 (<0.01%)Admitted-Finance GAONKARWADA | NORTH GOA | GOA | 403001 | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | PRASHANT TALAWADEKAR L1 | DINESH KAMAT L2 |
|---|---|---|---|---|---|
| 1.00 | Earthwork in excavation by mechanical means (hydraulic excavator)/ manual means in foundation pipeline trenches drain (not exceeding 1.5m in width or 10 sqm on plan) including dressing of sides and ramming of bottomS, lift upto 1.5m including getting out the excavated soil and disposal of surplus excacated soil as directed within a lead of 50m.
a) All kinds of soil | 122 | cum | 303.51 ₹37,028.22 Lowest | 303.53 ₹37,030.66 |
| 2.00 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 7 | cum | 2,306.1 ₹16,142.7 Lowest | 2,306.1 ₹16,142.7 Lowest |
| 3.00 | Providing & Laying cement concrete 1:2:4 (1 cement: 2 Coarse Sand: 4 graded granitic or basaltic stone aggrt. 20mm nominal size) excluding cost of centering, shuttering and finishing in:
a) All works upto plinth level | 64 | cum | 7,102 ₹4,54,528 Lowest | 7,102 ₹4,54,528 Lowest |
| 4.00 | Providing & Laying cement concrete 1:2:4 (1 cement: 2 Coarse Sand: 4 graded granitic or basaltic stone aggrt. 20mm nominal size) excluding cost of centering, shuttering and finishing in:
b) Retaining walls, return walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttersses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets etc upto floor five level. | 36 | cum | 7,750 ₹2,79,000 Lowest | 7,750 ₹2,79,000 Lowest |
| 5.00 | Providing and Laying cement (1:11/2:3) Reinforced Cement Concrete excluding cost of centering & shuttering finishing and reinforcement (1 cement : 11/2 Coarse Sand : 3 graded stone aggregate 20 mm nominal size)
a) All works upto plinth level | 13 | cum | 7,486.65 ₹97,326.45 Lowest | 7,486.65 ₹97,326.45 Lowest |
| 6.00 | Providing and Laying cement (1:11/2:3) Reinforced Cement Concrete excluding cost of centering & shuttering finishing and reinforcement (1 cement : 11/2 Coarse Sand : 3 graded stone aggregate 20 mm nominal size)
b) In walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. upto floor five level. | 4 | cum | 8,380 ₹33,520 Lowest | 8,380 ₹33,520 Lowest |
| 7.00 | Centering & Shuttering including strutting, propping & removal of formS for :
a) Foundations, Footings, bases for columns. | 90 | sqm | 407 ₹36,630 Lowest | 407 ₹36,630 Lowest |
| 8.00 | Centering & Shuttering including strutting, propping & removal of formS for :
b) vertical surfaces such as retaining walls, return walls, walls ( any thickness) including attached pilasters, buttresses, plinth and string courses, fillets etc. | 92 | sqm | 500 ₹46,000 Lowest | 500 ₹46,000 Lowest |
| 9.00 | Centering & Shuttering including strutting, propping & removal of formS for :
iii) Coulumns, piers, pillars, abutments, posts and struts (Square, rectangle polygon in plan) | 9 | sqm | 622 ₹5,598 Lowest | 622 ₹5,598 Lowest |
| 10.00 | Providing TMT Steel Reinforcement Bars of (SAIL, TATA, VIZAG, JSW Steel Ltd.) (Confirming to I.S. 1786 of 1986) including bending, binding & placing in position in all the floors along with the factory made precast concrete cover blocks of specified sizes whose compressive strength is not less than that of surrounding concrete in the structural member. | 996 | Kg. | 109.5 ₹1,09,062 Lowest | 109.5 ₹1,09,062 Lowest |
Tender Value
₹14.2 L
EMD Value
₹28,433
Closing Date
25 Nov 2025, 5:30 pmClosed
EEVI, WRD, Bicholim
EEVI, WRD, Bicholim
Construction of Open Type Bandhara for Bharan nallah in Survey No. 129/0 at Sarvana in Bicholim Taluka.
2025_WRD_26332_1
WRD/WDVI/PB/F.30/TN e 35/2025-26/698 line 14 Dated 12/11
Open Tender
Civil Works - Water Works
Item Rate
60 days
Bicholim
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,000
₹28,433
23 Jan 2026
14 Nov 2025
26 Nov 2025
14 Nov 2025
25 Nov 2025
14 Nov 2025
Earthwork in excavation by mechanical means (hydraulic excavator)/ manual means in foundation pipeline trenches drain (not exceeding 1.5m in width or 10 sqm on plan) including dressing of sides and ramming of bottomS, lift upto 1.5m including getting out the excavated soil and disposal of surplus excacated soil as directed within a lead of 50m. a) All kinds of soil
Providing TMT Steel Reinforcement Bars of (SAIL, TATA, VIZAG, JSW Steel Ltd.) (Confirming to I.S. 1786 of 1986) including bending, binding & placing in position in all the floors along with the factory made precast concrete cover blocks of specified sizes whose compressive strength is not less than that of surrounding concrete in the structural member.
Providing and laying stone rip rap for Talus with basaltic/ granitic stones, 60% of which shall comprise stones not less than 0.0425 cum (1.5 cft.) in size each & remaining 40% and comprising well graded rubble not below the size of 0.0142 cum (1/2 cft.) including the cost of conveyance of all materials, spreading, hand packing, weding, etc. for all leads and lifts, etc. as directed by Engineer in-charge.
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.69 MB
Tendernotice_2.pdf
PDF • 0.93 MB
BOQ_26770.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .