Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.8 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | Rejected-Technical SANTHALAYAM VENGA P O 00 SASTHAMCOTTA KOLLAM KERALA 690569 | 690569 | - | Rejected-Technical L2 |
| Sl No | Description | Qty | Unit | SANIL SAM L1 | SURESH KUMAR V L2 |
|---|---|---|---|---|---|
| 1.00Construction of Anganwadi Building - Ground Floor | |||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 51.48 | cum | 359.72 ₹18,517.67 Lowest | 359.72 ₹18,517.67 Lowest |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 5.51 | cum | 7,932.89 ₹43,694.36 Lowest | 7,932.89 ₹43,694.36 Lowest |
| 1.00 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 9.57 | cum | 9,963.93 ₹95,354.81 Lowest | 9,963.93 ₹95,354.81 Lowest |
| 1.00 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 5.88 | sqm | 386.16 ₹2,270.62 Lowest | 386.16 ₹2,270.62 Lowest |
| 1.00 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 5.21 | cum | 10,488.77 ₹54,625.51 Lowest | 10,488.77 ₹54,625.51 Lowest |
| 1.01 | 5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 3.78 | cum | 12,772.18 ₹48,278.84 Lowest | 12,772.18 ₹48,278.84 Lowest |
| 1.01 | OD86792/2025-2026:DRM with hard stone including packing to lines and levels, cost and conveyance of all materials,labour charges etc complete. | 5.76 | cum | 3,525.25 ₹20,298.39 Lowest | 3,529.25 ₹20,321.42 |
| 1.01 | 5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 16.13 | cum | 13,442.14 ₹2,16,781.39 Lowest | 13,442.14 ₹2,16,781.39 Lowest |
| 1.01 | 5.9.4:Centering and shuttering including strutting, etc. and removal of form for:Shelves (Cast in situ) | 4.68 | sqm | 961.24 ₹4,498.6 Lowest | 961.24 ₹4,498.6 Lowest |
Tender Value
₹16.8 L
EMD Value
₹42,090
Closing Date
10 Sept 2025, 6:00 pmClosed
ASSISTANT ENGINEER
LID EW Section , Punalur Municipality
PWD WORKS
2025_LSGD_792234_3
06/2025-26/AE/LID EW/PMC
Open Tender
Civil Works - Buildings
Item Rate
PUNALUR
Please refer Tender documents.
9 documents required · 9 mandatory
₹2,760
Yes
₹42,090
Yes
25 Oct 2025
29 Aug 2025
12 Sept 2025
29 Aug 2025
10 Sept 2025
29 Aug 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1307187.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .