| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.3 LAccepted-AOC | ₹12.3 L | L1 | Accepted-AOC Accepted Vide Resolution of THIRUVAMBADY GP |
| 2 | l2₹12.6 L+₹30,492.80 (2.48%)Rejected-AOC CHITTATTUVADAKKEL THIRUVAMBADY | THIRUVAMBADY | KERALA | ₹12.6 L+₹30,492.80 (2.48%) | l2 | Rejected-AOC Higher rate and hence not admitted |
| 3 | L3₹13.6 L+₹1.3 L (10.9%)Rejected-AOC KERALA KL | ₹13.6 L+₹1.3 L (10.9%) | L3 | Rejected-AOC Higher rate and hence not admitted |
| 4 | l4₹13.6 L+₹1.4 L (11.1%)Rejected-AOC | ₹13.6 L+₹1.4 L (11.1%) | l4 | Rejected-AOC Higher rate and hence not admitted |
| Sl No | Description | Qty | Unit | Nellikkaparamba Labour Contract Co-operative Society Ltd No D 3188 L4 | GOPALAKRISHNAN KM L3 | Puthukkoth Hamza L1 | SARATH SEBASTIAN L2 |
|---|---|---|---|---|---|---|---|
| 1.00Side protection works | |||||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 95.6 | cum | 308.4 ₹29,483.04 | 307 ₹29,349.2 | 300 ₹28,680 | 284 ₹27,150.4 Lowest |
| 1.00 | OD525416/2025-2026:Bailing out water using pump above 5HP up to 10 HP with engine and pumpset , including
conveyance to site and erection , cost of fuel , lubrication oil and other stores of staff etc
complete | 23 | hour | 444.3 ₹10,218.9 | 443 ₹10,189 | 350 ₹8,050 Lowest | 410 ₹9,430 |
| 1.00 | OD525951/2025-2026:DOWEL BARS - Supplying and providing MS dowel bars of size 16 mm dia of 1m long (0.5m
in rock and 1m in concrete ) including drilling holes of 20mm dia to a depth of 1m in rock and
filling the gap with cement grout( 0.10kg/each) etc complete.(modified 60.5.2) | 35 | each | 448 ₹15,680 Lowest | 702 ₹24,570 | 700 ₹24,500 | 649 ₹22,715 |
| 1.00 | OD525417/2025-2026:Filling with contractor own earth (excluding rock) in open areas in layer not
exceeding 20 cm in depth,consolidation each deposited layer by ramming and watering, lead upto 50m and
lift up to 1.5m as per direction of site Engineer-in-charge. | 50.16 | cum | 398.1 ₹19,968.7 | 381 ₹19,110.96 | 300 ₹15,048 Lowest | 355 ₹17,806.8 |
| 1.00 | OD525419/2025-2026:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good
quality blasted rubble including packing to compactness to lines and levels cost and conveyance
of all materials labour charges etc. complete as per direction of Departmental officers at site | 252.15 | cum | 3,493.2 ₹8,80,820.86 | 3,420 ₹8,62,363.26 | 3,100 ₹7,81,674.3 Lowest | 3,157 ₹7,96,047.02 |
| 1.01 | 4.1.4:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded
stone aggregate 40 mm nominal size derived from natural sources) | 13.62 | cum | 7,769.5 ₹1,05,820.59 | 7,757 ₹1,05,650.34 | 7,600 ₹1,03,512 | 7,159 ₹97,505.58 Lowest |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 497.7 | kilogram | 96.4 ₹47,978.28 | 95 ₹47,281.5 | 90 ₹44,793 | 89 ₹44,295.3 Lowest |
| 1.01 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 15 | sqm | 331.1 ₹4,966.5 | 329 ₹4,935 | 300 ₹4,500 Lowest | 305 ₹4,575 |
| 1.01 | OD525476/2025-2026:Conveyance and dumping of departmental granite stones-Conveyance of departmental granite
stone 20 to 45 dm3 in size from stack at site and dumping in position (60% 45m3,30%30 to
40dm3 and 10% 20 to 30dm3 stones) to lines and levels to from the core of the sea wall as per approved design including all leads and lifts etc. complete as per the direction of the
departmental officers at site | 98.75 | cum | 606.7 ₹59,911.63 | 650 ₹64,187.5 | 550 ₹54,312.5 Lowest | 601 ₹59,348.75 |
Tender Value
₹14.6 L
EMD Value
₹36,557
Closing Date
18 Mar 2026, 6:55 pmClosed
AE LID EW
LID EW THIRUVAMBADY
Annual Plan-THIRUVAMBADY GP 65/2025- 26_ PATHIRAMANN JALASHAYA SAMRAKSHANA BHITHI NIRMANAMWARD 13-General Civil Work
2026_LSGD_841389_6
12/2025-26/AE/LID EW/TDY
Open Tender
Civil Works - Others
Percentage
180 days
THIRUVAMBADY
Please refer Tender documents.
10 documents required · 10 mandatory
₹2,760
Yes
₹36,557
Yes
17 Aug 2026
11 Mar 2026
20 Mar 2026
11 Mar 2026
18 Mar 2026
11 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Side protection works | |||||
| 1.001 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 1 | cum | - | - |
| 1.002 | OD525416/2025-2026:Bailing out water using pump above 5HP up to 10 HP with engine and pumpset , including
conveyance to site and erection , cost of fuel , lubrication oil and other stores of staff etc
complete | - | hour | - | - |
| 1.003 | OD525951/2025-2026:DOWEL BARS - Supplying and providing MS dowel bars of size 16 mm dia of 1m long (0.5m
in rock and 1m in concrete ) including drilling holes of 20mm dia to a depth of 1m in rock and
filling the gap with cement grout( 0.10kg/each) etc complete.(modified 60.5.2) | - | each | - | - |
| 1.004 | OD525417/2025-2026:Filling with contractor own earth (excluding rock) in open areas in layer not
exceeding 20 cm in depth,consolidation each deposited layer by ramming and watering, lead upto 50m and
lift up to 1.5m as per direction of site Engineer-in-charge. | 1 | cum | - | - |
| 1.005 | OD525419/2025-2026:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good
quality blasted rubble including packing to compactness to lines and levels cost and conveyance
of all materials labour charges etc. complete as per direction of Departmental officers at site | 0.2 | cum | - | - |
| 1.006 | 4.1.4:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded
stone aggregate 40 mm nominal size derived from natural sources) | 1 | cum | - | - |
| 1.007 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 1 | kilogram | - | - |
| 1.008 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | - | sqm | - | - |
| 1.009 | OD525476/2025-2026:Conveyance and dumping of departmental granite stones-Conveyance of departmental granite
stone 20 to 45 dm3 in size from stack at site and dumping in position (60% 45m3,30%30 to
40dm3 and 10% 20 to 30dm3 stones) to lines and levels to from the core of the sea wall as per approved design including all leads and lifts etc. complete as per the direction of the
departmental officers at site | - | cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1429402.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.04 MB
viewnit.pdf
Tender Documents • 0.03 MB
viewsbd.pdf
Tender Documents • 2.54 MB
BOQ_1429402.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .