Tender Value
₹28.5 L
EMD Value
₹29,000
Closing Date
10 Sept 2026, 6:00 pm
Executive Engineer, Und Irrigation Division, Jamnagar
FULZAR(K.B.) WATER RESOURCES PROJECT Several Repairing & Replacement work in canal syphon ch.1015, canal Syphon ch.5910 and stair case work at HR/CR gate in RBMC of Fulzar K.B. WRP.
339024
08 of 2026-27
Open
Civil Works
Works
Jamnagar
7 documents required · 7 mandatory
₹1,500
EXECUTIVE ENGINEER UND IRRIGATION DIVISION JAMNAGAR
₹29,000
26 Aug 2026
26 Aug 2026
26 Aug 2026
10 Sept 2026
26 Aug 2026
BILL OF QUANTITIES
(A) Percentage Rate Tender (Up to INR 10 Cr. )
Name of work : FULZAR(K.B.) WATER RESOURCES PROJECT
Several Repairing & Replacement work in canal syphon ch.1015, canal Syphon
ch.5910 and stair case work at HR/CR gate in RBMC of Fulzar K.B. WRP.
Item Description of Item (with brief Quantity Unit Rate In Amount
No. specification and reference to book of figures
specifications)
1(A) Excavation in all sorts of strata and formations 287.00 Cum. 83.00
incl. depositing the unuseful excavated stuff as
and where directed incl. sorting and stacking
useful materials as directed upto 30mt lead and
all lifts etc. complete, including dewatering.
(Depth 0 to 3.0 Mt.) (For all type canal &
foundation trenches of C.D. Work)
(A) IN OVERBURDEN INCL. HARD MURRUM
1(C) (C) IN HARD ROCK 118.00 Cum. 598.00
2 Dismantling C.C. foundation or flooring sorting & 33.00 Cum. 828.00
stacking useful and unuseful material in lead
upto 200mt as directed etc. complete.
3 Dismantling the existing RCC pipes including 217.00 Rmt. 214.00
sorting out and stacking of the usefull material
(Pipe) measurable conditions upto lead 200 mt.
as directed under the specification.
(iii) 650mm to 900mm diameter.
4 Providing, supplying, Lowering and laying ISI 217.00 Rmt. 3969.00
Standard R.C.C. NP-3 Class pipes in standard
lengths of following Diameter suitable for either
collar joints or rubber ring joints including all
taxes, insurance, transportation, freight charges,
octroi, inspection charges, loading, unloading,
conveyance to Size, and jointing in proper
position, grade and alignment at all level as level
as directed by Engineer-in-charge including all
labour, giving hydraulic testing as per ISI
code.(G) 900mm Dia NOTE :- One collar should
be supplied with each full length plain ended
RCC pipe, cost included in rates below. One
rubber ring should be supplied with each full
length socketed pipe, cost included in rates
5 Prov. and Laying in position Controlled cement 395.00 Cum. 4303.00
concrete using cement, sand and crushed
aggregate by mass and machine mix for
R.C.C./CC work including necessary formworks
centering scaffolding compaction by vibrator,
curing as directed with all lead & lift etc.
complete. Excluding the cost of reinforcement.
FOR PLINTH COURSE & COPING.
(A) Concrete Grade M-15 & MSA-20mm.
6 Dewatering of foundation area, pits & trenches 4000.00 Hp./ 27.00
of head works and allied works with diesel or Hrs.
electrical pumping arrangement incl. cost of pipe
lines, others materials, labours etc. complete as
directed with all lifts.
7 Back filling with appropriate excavated material 158.00 Cum. 84.00
behind the structures or refilling the trenches
with excavated useful material including
watering ramming, consolidation etc. complete
with all lead and lift.
I am/we are willing to carry out the work at ____________________ % below/above percent
(Should be written in figures and words) of the estimated rates mentioned above. Amount of
My/Our tender works out as under :-
Estimated Amount Rs. 28,50,377=00 Estimated Amount Rs. 28,50,377=00
Put to Tender Rs. Put to Tender Rs.
Deduct _______% Below Rs. __________ Add _______% Above Rs. __________
Net Rs. Net Rs.
(Rupees in words) ________________________ (Rupees in words) ________________________
1. The Contractor shall exhibit a board with detailed specification and details of work as
directed by the Engineer-In-Charge for which no extra payment shall be made.
2. The labour cess will be deducted as per prevailing rules i.e.1% of the work done.
3. GST and Income tax TDS will be deducted at a source while making payments of bills.
4. In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per
Govt.G.R.:PRC-10/2017CementConsumption/16/CDate:11/05/2017as stated in S.O.R.
therefore in R.C.C. items where there is a change as per actual mix design the cost of
difference of cement consumption have been deducted from the rate of original item at the
rate of input rate mentioned in all the tender. DELETED
5. The rates to be quoted by the contractor must be inclusive of all duties, taxes, and other
levies except GST payable by the contractor under the contract.
Signature of Contractor Executive Engineer
Und Irrigation Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
2. SBD FKB Several Rep.pdf
BOQ.pdf
Tender Notice No.8.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].