Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.50Accepted-AOC | ₹27.50 Quoted ₹72.50 | L1 | Accepted-AOC WORK ORDER PERCENTAGE (-)27.50 PERCENTAGE BELOW THE DSR 2018 AND ADDITIONAL ITEMS OF ESTIMATED VALUE OF CONTRACT Rs. 1,70,00,000/- EXCLUDING GST |
| 2 | L2₹72.90+₹0.40 (0.55%)Rejected-Finance | ₹72.90+₹0.40 (0.55%) | L2 | Rejected-Finance Rejected |
| 3 | L3₹73.61+₹1.11 (1.53%)Rejected-Finance | ₹73.61+₹1.11 (1.53%) | L3 | Rejected-Finance Rejected |
| 4 | L4₹74.90+₹2.40 (3.31%)Rejected-Finance EWS 38 ROAD NO 03 KPHB COLONY HYDERABAD 500072 | MEDCHAL MALKAJGIRI | TELANGANA | 500072 | ₹74.90+₹2.40 (3.31%) | L4 | Rejected-Finance Rejected |
| 5 | L5₹76.78+₹4.28 (5.90%)Rejected-Finance | ₹76.78+₹4.28 (5.90%) | L5 | Rejected-Finance Rejected |
Tender Value
₹1.7 Cr
Closing Date
10 Jun 2021, 6:00 pmClosed
a v rama krishna
O/o GM (CIC) Airports Authority of India Begumpet airport Hyderabad -16
civil maintenance works
2021_AAI_78402_1
AAI/HYD/RM/W-1/2021-22
Open Tender
Civil Works
Percentage
365 days
Begumpet airport
as per NIT criteria
12 documents required · 12 mandatory
₹1,180
Exempted
14 Jul 2021
3 Jun 2021
14 Jun 2021
3 Jun 2021
10 Jun 2021
3 Jun 2021
3 Jun 2021 - 9 Jun 2021
Schedule-A ( Part-1) DSR- 2018/19 (vol-I & vol-II items) and DSR 2018/19 (Horticulture) Schedule-A (Part-2) Additional Miscellaneous Items
Guidelnes for quoting the % rte by the bidder. 1) The rate shall be quoted by the bidder in % (Percentage) only on the DSR - 2018/19. 2. Bidder should note that the rates calculated for all the items in Part II are made at par with the rates of DSR 2018/19 items. 3) Bidder is reuired to quote only one value for percentage which will be applicable to Schedule A(Part I and Part-II) 4) Bidder shall quote rate only in %(Percentage) on Schedule"A"(part I and Part II) wherein 100 is base. 5) Bidder may please note that the the payment of DSR Items quoted shall be regulated as follows to arrive rates excluding GST. Rate of DSR Items inluding additional items =X Rate to be considered for payment Y= X/1.18(in case of 18% GST) for payment = (Y)*(quoted percentage by the agency) Thereafter GST( as applicable ) shall be calculated on the gross value of work executed The percentage rate shall be quoted in digits only without applying any sign of (+) or (-) Following are some examples for quoting the % rate by the bidder:- a) If Bidder wants to quote 5% below the Schedule A(Part I and Part II) rates, then the bidder has to quote 95 inEnvelope-II/ Price Bid without any (+) or (-) sign.(Since 100 is base value of Schedule A(Part I & Part II) and as bidder wants to quote 5% below the SChedule"A" means value 5 is substracted from base value 100 and quote becomes 100-5 = 95) b) If Bidder wants to quote 4% above the Schedule A(Part I and Part II) rates, then the bidder has to quote 104 inEnvelope-II/ Price Bid without any (+) or (-) sign.(Since 100 is base value of Schedule A(Part I & Part II) and as bidder wants to quote 4% above the SChedule"A" means value 4 is added from base value 100 and quote becomes 100+4 = 104)
S.R.CONSTRUCTIONS
RSR INFRA WORKS (INDIA) PVT. LTD.,
MAHALAKSHMI CONSTRUCTIONS
Lakshmi Prasanna Contracting LLP
JAYRAM INDUSTRIES INDIA PRIVATE LIMITED
madhaviengineeringconstructions
POLINA RAVINDRANATH
KALKI ELECTRICALS
ARP ENTERPRISES
Rynaa Constructionz India
SWAS AND IT PRIVATE LIMITED
stage.html
html • 0.08 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .