Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹1.9 L+₹2,000 (1.06%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹1.9 L+₹6,000 (3.17%)Rejected-AOC | L3 | Rejected-AOC L3 | |
| 4 | L4₹2.9 L+₹1.0 L (53.4%)Rejected-AOC | L4 | Rejected-AOC L4 | |
| 5 | L5₹4 L+₹2.1 L (111.6%)Rejected-AOC | L5 | Rejected-AOC L5 |
Tender Value
Refer Docs
Closing Date
4 Jan 2022, 2:00 pmClosed
Varghese P O
SM P AND P FACT LTD
Repair of K1 boiler top cone and Gland packing of K1 tube bundle inlet and outlet during ATA 2022 at SAP, FACT-CD.
2021_FACT_664018_1
04097/2021-2022/E24522
Limited
Miscellaneous Works
Item Rate
30 days
AMBALAMEDU
This tender is issued on limited tender basis from the registered bidders of FACT (CD) (list CDM105B)
4 documents required · 4 mandatory
₹0
Exempted
20 Jan 2022
20 Dec 2021
5 Jan 2022
20 Dec 2021
4 Jan 2022
20 Dec 2021
Repair of K1 boiler top cone and Gland packing of K1 tube bundle inlet and outlet during ATA 2022 at SAP, FACT-CD.
Repair of K1 boiler top cone: Collect necessary channels, angles, plates etc. from stores. Necessary scaffoldings shall be provided to carryout the work safely and work shall be done with valid safety permits only. Cut and remove the horizontal segment of the top ring made of ISA 90 from the edge of the top shell of K1 Boiler. Also remove the overhanging horizontal plates welded to cone of the boiler on one side and to the top ring welded to the shell. Bend ISA / Channels to suit the curvature of the boiler shell. After proper grinding of the edges, full weld the segments of angle / Channel over the existing ring. Cut plates to suit the profile of the boiler cone edges and weld the same to the edge of the cone and to the top web of ISA / Channel welded on the shell. Full weld the same. The newly fabricated structures shall be painted with two (02) coats of zinc chromate yellow primer of approved make/quality and two coats of aluminum paint of approved make /quaity. After erection, all joints shall be leak-proof and leaks if any shall be repaired by contractor at his own cost & risk.
Gland packing of K1 tube bundle inlets and outlets: Pack the glands of every K1 tube bundle inlets and outlets with refractory rope and tightening to ensure a leak free operation.
THANKACHAN M K
HASSAN MM
INFINI ENGINEERING WORKS
BASHEER V P
PAREETH V V
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_698910.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .