Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹93.2 LAdmitted-Finance | ₹93.2 L | L1 | Admitted-Finance |
| 2 | L2₹98.8 L+₹5.6 L (6.03%)Admitted-Finance | ₹98.8 L+₹5.6 L (6.03%) | L2 | Admitted-Finance |
| 3 | L3₹1.0 Cr+₹8.6 L (9.20%)Admitted-Finance | ₹1.0 Cr+₹8.6 L (9.20%) | L3 | Admitted-Finance |
| 4 | L4₹1.0 Cr+₹9.3 L (10.0%)Admitted-Finance | ₹1.0 Cr+₹9.3 L (10.0%) | L4 | Admitted-Finance |
| 5 | L5₹1.0 Cr+₹9.9 L (10.6%)Admitted-Finance | ₹1.0 Cr+₹9.9 L (10.6%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | KDN INFRASTRUCTURE PVT. LTD. L5 | SOHAN LAL L2 | Manish Kapoor L1 | ASHOK CHAUHAN AND COMPANY L3 | NIKHIL THAKUR L4 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, including getting out the excavated soil and disposal of surplus excavated soil as directed, within all lead and lift all kinds of soil. All complete as per the direction of Engineer-in-Charge. | 542 | Cum | 300 ₹1,62,600 | 300 ₹1,62,600 | 150 ₹81,300 | 132 ₹71,544 Lowest | 240 ₹1,30,080 |
| 2.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:5:10 (1 cement : 5 coarse sand (zone-III) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources). All complete as per the direction of Engineer-in-Charge. | 50 | Cum | 4,850 ₹2,42,500 | 5,300 ₹2,65,000 | 4,000 ₹2,00,000 | 4,900 ₹2,45,000 | 3,999 ₹1,99,950 Lowest |
| 3.00 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns. All complete as per the direction of Engineer-in-Charge. | 220 | sqm | 275 ₹60,500 | 400 ₹88,000 | 150 ₹33,000 Lowest | 200 ₹44,000 | 210 ₹46,200 |
| 4.00 | Centering and shuttering including strutting, propping etc. and removal of form for Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. All complete as per the direction of Engineer-in-Charge. | 1,900 | sqm | 400 ₹7,60,000 | 350 ₹6,65,000 | 300 ₹5,70,000 | 300 ₹5,70,000 | 280 ₹5,32,000 Lowest |
| 5.00 | Providing and laying in position plum concrete with hard stone boulders in retaining walls etc up to all height and all level, in required size and shape etc; with cement concrete of mix 1:4:8 (1 cement: 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) using 15% hard stone plums/boulders of size 150 mm to 300 mm, excluding cost of centring and shuttering, all complete as per the direction of Engineer-in-Charge. | 1,580 | Cum | 4,900 ₹77,42,000 | 4,800 ₹75,84,000 | 4,700 ₹74,26,000 Lowest | 5,400 ₹85,32,000 | 4,950 ₹78,21,000 |
| 6.00 | Supplying & back filling with well graded stone boulders of size 150 mm to 300 mm behind retaining wall complete as per the directions of the Engineer-in-charge. (Note:- 30% deductions in measurements shall be made for voids). | 575 | cum | 1,450 ₹8,33,750 | 1,000 ₹5,75,000 | 1,400 ₹8,05,000 | 868 ₹4,99,100 Lowest | 1,800 ₹10,35,000 |
| 7.00 | Providing and fixing 110mm dia Unplasticized rigid PVC pipe of required size for weep holes in plum concrete walls including cutting, placing and fixing in required slope all complete as per entire satisfaction and direction of Engineer -in-charge including carriage of material within all lead and lift. | 1,350 | meter | 375 ₹5,06,250 | 400 ₹5,40,000 | 150 ₹2,02,500 Lowest | 158 ₹2,13,300 | 360 ₹4,86,000 |
Tender Value
₹1.2 Cr
EMD Value
₹2.5 L
Closing Date
5 Dec 2023, 6:00 pmClosed
Superintending Engineer IIT Mandi Kamand
o/o Superintending Engineer South campus IIT Mandi
Construction of Retaining wall cum protection wall along the road near under construction Undergraduate Hostel at South Campus of IIT Mandi
2023_IITMD_782588_1
IIT Mandi (CW)/SE-1509/2023-24/386-88 dt24-11-23
Open Tender
Civil Works
Item Rate
60 days
South campus of IIT Mandi
Please refer to NIT
2 documents required · 2 mandatory
₹1,180
The Registrar IIT Mandi
₹2.5 L
28 Dec 2023
24 Nov 2023
7 Dec 2023
24 Nov 2023
5 Dec 2023
24 Nov 2023
24 Nov 2023 - 4 Dec 2023
Amount
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, including getting out the excavated soil and disposal of surplus excavated soil as directed, within all lead and lift all kinds of soil. All complete as per the direction of Engineer-in-Charge.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:5:10 (1 cement : 5 coarse sand (zone-III) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources). All complete as per the direction of Engineer-in-Charge.
Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns. All complete as per the direction of Engineer-in-Charge.
Centering and shuttering including strutting, propping etc. and removal of form for Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. All complete as per the direction of Engineer-in-Charge.
Providing and laying in position plum concrete with hard stone boulders in retaining walls etc up to all height and all level, in required size and shape etc; with cement concrete of mix 1:4:8 (1 cement: 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) using 15% hard stone plums/boulders of size 150 mm to 300 mm, excluding cost of centring and shuttering, all complete as per the direction of Engineer-in-Charge.
Supplying & back filling with well graded stone boulders of size 150 mm to 300 mm behind retaining wall complete as per the directions of the Engineer-in-charge. (Note:- 30% deductions in measurements shall be made for voids).
Providing and fixing 110mm dia Unplasticized rigid PVC pipe of required size for weep holes in plum concrete walls including cutting, placing and fixing in required slope all complete as per entire satisfaction and direction of Engineer -in-charge including carriage of material within all lead and lift.
SOHAN LAL
ASHOK CHAUHAN AND COMPANY
NIKHIL THAKUR
KDN INFRASTRUCTURE PVT. LTD.
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.65 MB
BOQ_822625.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .