| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.0 LAccepted-AOC THRISSUR CORPORATION THRISSUR | THRISSUR | KERALA | 679105 | L1 | Accepted-AOC LOWEST1 | |
| 2 | L2₹22.1 L+₹16,954.56 (0.77%)Rejected-AOC CHALIPATT H THRITHALOOR THRISSUR 680 619 | THRISSUR | KERALA | 680619 | L2 | Rejected-AOC LOWEST2 |
| Sl No | Description | Qty | Unit | t.l. rappai L2 | DONSON N.A L1 |
|---|---|---|---|---|---|
| 1.00Road work | |||||
| 1.00 | 2.4.2.A:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Cement Concrete Grade M-15 & M-20 - By Mechanical Means | 33.41 | cum | 850 ₹28,400.2 | 820 ₹27,397.84 Lowest |
| 1.00 | OD222357/2023-2024:As per CPWD Building Data book OD irrigation item No.60.1.2 Ring bund type II putting up ring bund with earth fill gunny bags of top width 1.0m bottom width 2.0m height 2.0m side and filling in between with earth to form ring bund and maintaining the same leak proof till the completion of the work and clearing the site by dismantling the bund after completion of the work.etc.complete | 20 | metre | 1,300 ₹26,000 | 1,220 ₹24,400 Lowest |
| 1.00 | OD222358/2023-2024:Bailing out water by using 5HP motor and pump set including all cost and erection charges, oil and labour charges etc. complete | 25 | Day | 3,700 ₹92,500 | 3,600 ₹90,000 Lowest |
| 1.00 | 3.6:Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m | 136.7 | cum | 60 ₹8,202 | 52 ₹7,108.4 Lowest |
| 1.00 | OD222359/2023-2024:As per CPWD building Data book OD irrigation 60 item no:60.64.1 Coconut pile Supply and stacking well matured stright coconut post for driving down throug various strata below bed level including cost conveyance labour charges etc complete. | 160 | metre | 200 ₹32,000 | 156 ₹24,960 Lowest |
| 1.01 | OD222360/2023-2024:60.64.4 coconut pile -Driving down coconut pile to line and levels through various strata including all hire charges and labour for fixing, staging platform and all other appliances necessary for pile driving down after pointing the bottom end | 160 | metre | 1,300 ₹2,08,000 Lowest | 1,300 ₹2,08,000 Lowest |
| 1.01 | OD222361/2023-2024:As per CPWD Building Data Book OD irrigation 60-Item No:60.64.6 Cutting and removing the excess length of wooden piles to lines and levels and removing the cut end of pile and stacking with in 150m | 40 | each | 250 ₹10,000 | 230 ₹9,200 Lowest |
| 1.01 | 12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. | 21.6 | cum | 7,700 ₹1,66,320 Lowest | 7,700 ₹1,66,320 Lowest |
| 1.01 | OD222363/2023-2024:DR masonry including all cost of materials and labour charges etc. complete | 58.36 | cum | 4,500 ₹2,62,620 Lowest | 4,500 ₹2,62,620 Lowest |
Tender Value
₹21.2 L
EMD Value
₹50,000
Closing Date
25 Feb 2026, 3:00 pmClosed
EXECUTIVE ENGINEER
PWD ROADS DIVISION THRISSUR
GENERAL SR Work 2025 26 Reconstruction of Culvert at Anakkallu Ammadam Peringottukara Road near Irattappalam km 10 720 Civil work General Civil Work 1
2025_PWD_816684_2
PWD/RB/11661/2025-2026
Open Tender
Civil Works - Roads
Item Rate
180 days
Thrissur
Please refer Tender documents.
9 documents required · 9 mandatory
₹2,760
Yes
₹50,000
Yes
3 Aug 2026
17 Feb 2026
27 Feb 2026
17 Feb 2026
25 Feb 2026
17 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Road work | |||||
| 1.001 | 2.4.2.A:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Cement Concrete Grade M-15 & M-20 - By Mechanical Means | 1 | cum | - | - |
| 1.002 | OD222357/2023-2024:As per CPWD Building Data book OD irrigation item No.60.1.2 Ring bund type II putting up ring bund with earth fill gunny bags of top width 1.0m bottom width 2.0m height 2.0m side and filling in between with earth to form ring bund and maintaining the same leak proof till the completion of the work and clearing the site by dismantling the bund after completion of the work.etc.complete | - | metre | - | - |
| 1.003 | OD222358/2023-2024:Bailing out water by using 5HP motor and pump set including all cost and erection charges, oil and labour charges etc. complete | - | Day | - | - |
| 1.004 | 3.6:Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m | 1 | cum | - | - |
| 1.005 | OD222359/2023-2024:As per CPWD building Data book OD irrigation 60 item no:60.64.1 Coconut pile Supply and stacking well matured stright coconut post for driving down throug various strata below bed level including cost conveyance labour charges etc complete. | - | metre | - | - |
| 1.006 | OD222360/2023-2024:60.64.4 coconut pile -Driving down coconut pile to line and levels through various strata including all hire charges and labour for fixing, staging platform and all other appliances necessary for pile driving down after pointing the bottom end | - | metre | - | - |
| 1.007 | OD222361/2023-2024:As per CPWD Building Data Book OD irrigation 60-Item No:60.64.6 Cutting and removing the excess length of wooden piles to lines and levels and removing the cut end of pile and stacking with in 150m | - | each | - | - |
| 1.008 | 12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. | - | cum | - | - |
| 1.009 | OD222363/2023-2024:DR masonry including all cost of materials and labour charges etc. complete | 1 | cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1409600.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.06 MB
NIT.pdf
Tender Documents • 0.03 MB
SBD.pdf
Tender Documents • 3.37 MB
BOQ_1409600.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .