Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 LAccepted-AOC | L1 | Accepted-AOC Competent committee approved the tender in favour of Ist Lowest Bidder | |
| 2 | L2₹2.0 L+₹2,025 (1.02%)Rejected-AOC | L2 | Rejected-AOC Competent committee rejected the file due to higher rates | |
| 3 | L3₹2.1 L+₹6,225 (3.12%)Rejected-AOC | L3 | Rejected-AOC Competent committee rejected the file due to higher rates |
Tender Value
₹2 L
EMD Value
₹2,000
Closing Date
6 Jul 2023, 5:00 pmClosed
SUPERINTENDING ENGINEER
ELECTRICITY DISTRIBUTION CIRCLE, KATJU MARG, BAREILLY
For Maintenance and system strengthening work at various 33/11/LT lines for saftey of Kanwar Yatra, Rainy Season, Religious and other Places under EDD-I, Bareilly (O and M)
2023_MVVNL_801890_2
05/EDCB/2023-24
Open Tender
Electrical Works
Item Rate
90 days
Work
AS PER TENDER FORM
3 documents required · 3 mandatory
₹1,180
SE, EDC, Bareilly
₹2,000
7 Nov 2023
25 Jun 2023
7 Jul 2023
25 Jun 2023
6 Jul 2023
25 Jun 2023
Amount
Work of wrapping of Plastic sheet around the ST Pole up to 2.5 meter hight form ground level at various places in 33/11/LT Line for saftey of Kanwar Yatra, Rainy season, Religious and other Places under EDD-I, Bareilly (All the material, Manpower and T&P will be arranged by the contractor at his own cost)
Safe Carriage of material from C.B. Ganj Central Store to work site including its loading and unloading.
ST Pole 11 Meter Long.
11 KV Line materials such as, M.S. Channel/ Angel V-Type, X-Arm, 11KV/33 KV Pin Insulator , G.I Wire , Erath Rod , AB Cable Etc.
Dismantling of damaged pole and then erection of new ST Pole with fixing of clamps and then sifting of existing line from damaged pole to new erected pole including back carriage of damaged pole from work site to Central store C.B Ganj.
Grouting of new erected ST Poles in cement, sand Brick Blast in ratio 1:4:6 including cost of material.
New Guarding of 33/ 11 KV line complete work with providing X-Wire at every 1.5 mtr. Distance.
Work of repairing of old Guarding of 33/11 KV line complete work.
Tightening of Loose stay 33/11 KV Line for proper tension of complete work.
Replacement of damaged 11 KV Pin Insulator.
Replacement of damaged 11 KV Disc Insulator.
Replacement of old damaged cross arms (provided by the department) by providing M.S. Clamps, Nuts & Bolts by the contractor at his own cost
Replacement of old damaged jumpers on sectional poles of 33/11 KV line.
Erathing of HT / LT Line poles with M.S. Earth Rod & 06 SWG G.I. Wire.
M/S ZAHOOR TRADERS
M.A.ELECTRICALS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .