Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹37.4 LAccepted-AOC THONIPALLAM HOUSE THEKKEDESAM POST NALLEPILLY PALAKKAD 678 553 | PALAKKAD | KERALA | 678553 | 1 | Accepted-AOC Single bid approved from higher office |
Tender Value
₹37.4 L
EMD Value
₹50,000
Closing Date
15 Jun 2020, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
Office of Executive Engineer Irrigation Division Chittur Chittur College P O 678104
Urgent rectification works
2020_Irrig_363094_1
01/EQ/EE/CTR/2020-21
Open Tender
Civil Works - Canal
Item Rate
180 days
Vilayanchathannur
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹50,000
Yes
8 Oct 2020
8 Jun 2020
18 Jun 2020
8 Jun 2020
15 Jun 2020
8 Jun 2020
8 Jun 2020 - 11 Jun 2020
60 days
Amount
Vilayanchathannur Branch canal Bet ween Ch: 1/900 km to 2/250 km.
2.32 : Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared.
2.8.1 : Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
4.3.2 : Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
60.7.4 : DR PACKING FOR APRONS - Rough stone dry packing for apron with good quality blasted rubble including packing to compactness to lines levels, cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
4.1.5 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
4.1.3 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
50.13.1 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
13.16.1 : 6 mm cement plaster of mix:1:3 ( 1 cement : 3 fine sand)
od27673/2019_2020/P1 : Filling with departmental earth including ramming and all lead and lift etc, complete
Bidder Name
A.SURESH
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_512454.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .