Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.3 LAccepted-AOC 1ST FLOOR SIDHARTH TOWER BALTI KHARKHANA BYELNE S J ROAD ATHGAON GUWAHATI KAMRUP ASSAM 781001 | KAMRUP METRO | ASSAM | 781001 | L1 | Accepted-AOC Lowest 1st | |
| 2 | L2₹26.9 L+₹3.8 L (16.7%)Rejected-AOC | L2 | Rejected-AOC Lowest 2nd | |
| 3 | Not Admitted-PreQual/Technical | - | Not Admitted-PreQual/Technical Others-EMD and Tender cost not deposited |
Tender Value
₹24 L
EMD Value
₹24,000
Closing Date
15 May 2023, 4:00 pmClosed
SE EDC Pilibhit
Near Roadways Pilibhit
For construction of 11 KV and LT line for Jhalas from the region of Kurraiya to Sheetalpur via Marori from Gahaunia feeder at Bilsanda SS Pilibhit under EDD-Bisalpur
2023_MVVNL_780985_3
T-43/EDCP/2022-23
Open Tender
Miscellaneous Works
Item Rate
365 days
Bisalpur
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,540
EE EDD
₹24,000
19 Jul 2023
6 May 2023
16 May 2023
6 May 2023
15 May 2023
6 May 2023
Amount
Carriage of following line material for 11KV line from Store Centre to the site of work including measuring, weighing, loading, unloading at both ends and proper stacking at safe site
PCC Pole 8.5Mtr. Long
11 KV Cross Arm Channel V type
11 KV Pin insulator
11 KV Pin with nut
11 KV Disc insulator
11 KV Disc fitting
ACSR weasel conductor
Cable LT ABC (3X50+1X35+1x16) sqmm
G.I. wire 8 SWG
Stay set complete
Stay Set Complete LT
Earthing complete
11/0.4 KV 25 KVA Transformer
11 KV TPMO
Distribution Box three Phase with clamp
Gaurding Angle 1.6mtr. Long
M.S angle lron 65x65x6mm, 4300mm long @ 5.8 Kg/Mt (bracing)
M.S.Channel 100X50X2240mm @ 9.6Kg/Mt. (Top channel & dropper)
MS Channel 100x50x2028mm (Dropper for Fuse set)
MS angle 75x75x6x2028 mm) with clamp & bolt and nut (T/F base)
MS Channel 125x65x2240 (Top)
MS Channel 125x65x1300mm Tee off
E- bracket with bolt & nut
F- bracket with bolt & nut
Cross Arm holding clamp
Alluminium Binding wire-6 SWG
11 KV Fuse set
Erection of the following supports including cutting, making holes, fixing of all types of accessories digging of pits complete in all respect, as per RESSPO drawing. All types of clamps, stone pad, nut, bolt washers would be provided by the contractor.
Single support of PCC pole 8.5 mtr long.
Double pole structure on PCC. Pole 8.5mtr long complete with bracing for sectional double pole
Double pole structure on PCC. Pole 8.5mtr long complete with bracing for25 KVA T/F
Concreting of supports at the time of erection of pole in 1:4:8 concrete ratio from bottom of pole to ground level and plinthing of supports upto 300mm above ground level by using cement, sand & coarse aggregate in ratio 1:4:8 as per RESSPO drawing with watering/curing properly upto proper setting of plinthing. All matrial would be provided by the contractor.
Erection of stay set with stay wire, stay clamp & stay insulator including with grouting of stay set by concrete of ratio 1:4:8 as per RESSPO norms before back fitting of the pits including binding, climbing, clamping, tightening and nozzeling of stay wire in all respect as per RESSPO norms. All clamps, nuts, bolts, stay insulator, cement. brick, ballast, sand etc would be provided by the contractor.
Laying and sagging of 3 phase ACSR Weasel conductor from double pole at 33/11 KV substation to double pole at tapping point of 11 KV feeder line including jumpering, hoisting, fixing of all type of insulators, binding, jointing and its clamping etc in all respect.
Laying of LT ABC (3X50+1X35+1X16) sq.mm for 11 KV L.T Line.
Earthing of each PCC Poles of the line is to be done by inserting the MS earth rod (1800x20mm) into soil by hammering and properly fastning with GI wire to each support by nut & bolt. Earthing rod must be 0.15Mtr.above from the plinth of the support. All type nut & bolt would be given by the contractor.
Guarding of HT/LT/Telephone Line/ Road/River Crossing etc. by providing G.S Earth wire 7/16 SWG/GI wire No. 8/10 and making net with difference of 1.00 Mtr. Completely including fixing of channel/angle etc. with proper locking at each support as per RESSPO norms. All type nut &bolts, would be given by the contractor.
Fixing of 3 Phase distribution box on pole including proper clamping. All material would be provided by firm.
Fixing of danger board and G.I barbed wire on each pole including proper clamping. All material would be provided by firm.
mounting of transformers on double pole and laying of cable jumpering and making all HT/LT connections complete work in all respect .
Fixing of TPMO complete work in all respect.
Clearing of the line route by cutting of tree branches during erection of line and also upto the time of energisation completely as per direction of site incharge.
DURGESH CHANDEL
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .