Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹35.7 LAccepted-AOC 12 53 CHOPASNI HOUSING BOARD JODHPUR 342008 | JODHPUR | RAJASTHAN | 342008 | ₹35.7 L Quoted ₹39.3 L | L1 | Accepted-AOC AOC |
| 2 | L2₹42.0 L+₹2.7 L (6.97%)Rejected-Finance PLOT NO 32 FF SHIVAJI ENCLAVE NEW DELHI 110027 | NEW DELHI | NEW DELHI | DELHI | 110027 | ₹42.0 L+₹2.7 L (6.97%) | L2 | Rejected-Finance Being not Lowest. |
| Sl No | Description | Qty | Unit | Singh Associates L2 | PANKAJ ENTERPRISES L1 |
|---|---|---|---|---|---|
| 1.00 | M& L for Descaling the condenser by descaling compound / hydrochloric acid by soaking method,disconnecting condensor from the system by taking out nuts, bolts, studs, valves and MS/GI pipe line from both side cover, cleaning each tube with nylon brush,flushing with alkaline solution,connecting back both side cover including replacingleather gasket 4 mm thick for following capacities of condensers suitable for AC Plant installed as indicated below complete all as specified and directed and all as per manufacturers instruction and to the entire satisfaction of Engineer-in-charge. (a) chiller unit cap 52 TR | 3 | Each | 18,500 ₹55,500 | 18,000 ₹54,000 Lowest |
| 1.01 | b)Ditto all as per Ser item No 1.00 above but chiller unit cap 25 TR | 6 | Each | 17,500 ₹1,05,000 | 16,000 ₹96,000 Lowest |
| 1.02 | c)Ditto all as per Ser item No 1.00 above but chiller unit cap 11 & 10 TR | 10 | Each | 16,500 ₹1,65,000 | 10,000 ₹1,00,000 Lowest |
| 2.00 | Supply only refrigerant R-407c Gas complete all as specified and directed | 170 | Kg | 1,700 ₹2,89,000 | 1,400 ₹2,38,000 Lowest |
| 3.00 | Supply only refrigerant R-134A Gas complete all as specified and directed | 80 | Kg | 1,700 ₹1,36,000 | 1,500 ₹1,20,000 Lowest |
| 4.00 | M&L for replacement of thermostatic expansion valve suitable for water cooled scroll chiller unit cap 52 TR all as per sample, including brazing at both ends all as required and directed. | 1 | Each | 45,000 ₹45,000 Lowest | 62,000 ₹62,000 |
| 5.00 | M&L for replacement of thermostatic expansion valve suitable for water cooled scroll chiller unit cap 25 TR all as per sample, including brazing at both ends all as required and directed. | 2 | Each | 28,500 ₹57,000 Lowest | 55,000 ₹1,10,000 |
| 6.00 | M&L for replacement of thermostatic expansion valve suitable for water cooled scroll chiller unit cap 11/10 TR all as per sample, including brazing at both ends all as required and directed. | 3 | Each | 17,500 ₹52,500 | 10,000 ₹30,000 Lowest |
| 7.00 | M & L for replacement of HP/LP cut out switch suitable for scroll compressor cap up to 25 TR all as per specified and directed. | 6 | Each | 3,500 ₹21,000 | 2,000 ₹12,000 Lowest |
| 8.00 | M&L for replacement of chilled water sensor complete all as specified and directed | 4 | Each | 2,000 ₹8,000 Lowest | 3,500 ₹14,000 |
Tender Value
₹40 L
EMD Value
₹80,000
Closing Date
16 Jul 2026, 6:00 pmClosed
CWE (AF) Jodhpur
HQ CWE AF JODHPUR Opp Mosam Vibhag Airforce Chauraha , Ratanada Jodhpur (Raj)-342011
REPAIR/ REPLACEMENT AND SERVICING PART OF AC PLANTS, VRV AND NORTH SIDE OF RUNWAY INCLUDING SALAWAS AND KAYLANA AND ALLIED WORKS AT AF STN JODHPUR
2026_MES_773680_1
89169/E8
Open Tender
Electrical and Maintenance Works
Item Rate
180 days
GE (AF) No 2 Jodhpur
AS PER NIT
8 documents required · 8 mandatory
₹500
GE (AF) No 2 Jodhpur
₹80,000
Yes
7 Sept 2026
20 Jun 2026
18 Jul 2026
20 Jun 2026
16 Jul 2026
4 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | M& L for Descaling the condenser by descaling compound / hydrochloric acid by soaking method,disconnecting condensor from the system by taking out nuts, bolts, studs, valves and MS/GI pipe line from both side cover, cleaning each tube with nylon brush,flushing with alkaline solution,connecting back both side cover including replacingleather gasket 4 mm thick for following capacities of condensers suitable for AC Plant installed as indicated below complete all as specified and directed and all as per manufacturers instruction and to the entire satisfaction of Engineer-in-charge. (a) chiller unit cap 52 TR | 3 | Each | - | - |
| 1.01 | b)Ditto all as per Ser item No 1.00 above but chiller unit cap 25 TR | 6 | Each | - | - |
| 1.02 | c)Ditto all as per Ser item No 1.00 above but chiller unit cap 11 & 10 TR | 10 | Each | - | - |
| 2 | Supply only refrigerant R-407c Gas complete all as specified and directed | 170 | Kg | - | - |
| 3 | Supply only refrigerant R-134A Gas complete all as specified and directed | 80 | Kg | - | - |
| 4 | M&L for replacement of thermostatic expansion valve suitable for water cooled scroll chiller unit cap 52 TR all as per sample, including brazing at both ends all as required and directed. | 1 | Each | - | - |
| 5 | M&L for replacement of thermostatic expansion valve suitable for water cooled scroll chiller unit cap 25 TR all as per sample, including brazing at both ends all as required and directed. | 2 | Each | - | - |
| 6 | M&L for replacement of thermostatic expansion valve suitable for water cooled scroll chiller unit cap 11/10 TR all as per sample, including brazing at both ends all as required and directed. | 3 | Each | - | - |
| 7 | M & L for replacement of HP/LP cut out switch suitable for scroll compressor cap up to 25 TR all as per specified and directed. | 6 | Each | - | - |
| 8 | M&L for replacement of chilled water sensor complete all as specified and directed | 4 | Each | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.34 MB
tender.pdf
Tender Documents • 4.68 MB
BOQ_866301.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .