| 1 | L1₹14.1 LAccepted-AOC KUPPOL PERINGOME PO 670353 | PERINGOME | KANNUR | KERALA | 670353 | L1 | Accepted-AOC Agreement executed and work awarded | |
| 2 | L2₹17.0 L+₹2.8 L (20.1%)Rejected-Finance KANNUR | KERALA | 670001 | L2 | Rejected-Finance Lowest Bid Accepted | |
| 3 | L3₹16.7 L+₹2.6 L (18.2%)Rejected-Finance | L3 | Rejected-Finance Lowest Bid Accepted | |
| 4 | L4₹17.4 L+₹3.3 L (23.3%)Rejected-Finance | L4 | Rejected-Finance Lowest Bid Accepted |
Tender Value
₹22.3 L
EMD Value
₹50,000
Closing Date
9 Nov 2022, 3:00 pmClosed
Executive Engineer
Office of the Executive Engineer, Regional Investigation and Quality Control Laboratory, Kozhikode
Topographic Survey with DGPS control points Turning movement Survey BBD and Inventory
2022_PWD_524798_1
D1/Tender-20/INV/KKD/2022 - 23
Open Tender
Civil Works - Others
Item Rate
90 days
Arayidathupalam Karanthur Road in Kozhikode distri
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,950
Yes
₹50,000
Yes
23 Nov 2023
4 Nov 2022
11 Nov 2022
4 Nov 2022
9 Nov 2022
4 Nov 2022
Amount
Investigation works
Detailed topographic survey using Total station/mobile Lider and preperation of site plan of minimum of 15m on either side of the centre line and taking cross section details at 25m intervals on straight roads and 10m interval on curves ( survey includes details of all features as mention in the scope of the in plane terrain work within the limit of the survery). The survey shall be include establishing DGPS control points at starting and ending of the project in pairs and at 4 KM intervels (in pairs) in plane and rolling terrain and 2.5 Km intervels (in pairs) in hilly terrains.IT shall also include establishing inter visible traverse control points not more than 250m apart with accuracy of at least 1:10000 and desirable 1:20000 in distance measurement. Elevation of each other control points connected to MSL of GPS Bench Mark using precision levelling. Seperate bench marks need not be established. Including taking sufficient colour copy prints.(5 Nos)
Establishing DGPS control points onTOR steel bar of 10 mm dia fixed in RCC pillar of size 20X20X70cm embeddded in concrete M15 up to a depth of 40 cm and the balancce 30 cm above the ground shall be painted yellow
Establishing traverse control points with elevations on pillar of size 15cmX15cmX60cm M20 grade RCC pillar with a nail fixed on the top surface. The pillars shall be embedded in the concrete.Spacing 250 M apart as a bench mark - control pillar. The spacing shall be maximum 250 m apart . No seperate bench mark need to be established.
Turning movement survey at THREE ARM Junction Conducting turning movement survey at junction for one day for peak hours (7am to 11 am and 3.30 pm to 7.30 pm) by recording the classifed volume count in the prescribed format, including provision for engaging technicians and setting up of station etc and compiling the data and submitting the same in hard and soft copy etc. complete as per the instructions of PWD officials
Turning movement survey at FOUR ARM Junction Turning movement survey at Four arm Junction. Conducting turning movement survey at Junction for one day for 12 hours(7.00am to 7.00pm) by recording the classified volume count in the prescribed format,including provision for engaging technicians and setting up of station etc.and compiling the data and submitting the same in hard and soft copy etc.complete as per the instruction of PWD officials.
BBD Conducting one test consisting of taking deflection at 10points at 50m interval on one km stretch according to specification given in 81-1997, number of test conducted is as directed by the engineer in charge- conducting laboratory test to get moisture content and soil classification as per IS standards - For arranging equipment for testing 1km test taking one and half hour - Calculating Charecteristic deflection of one test from one test data obtained from part 1 ( one test data means comprising of taking deflecton at 10 points at 50m interval in 1km stretch according to the specification given in IRC81-1997) and submitting in hard and soft copy.
Study of pavement composition by cutting open pit at tar edge to get the details of layers (thickness and type ) of pavement composition - at one location as suggested by the engineer in charge carefully by excavating pit of area 1.00x 0.60m through overlaying bituminous and granular layer including BC, DBM/BM, WMM and GSB at tar edge and refilling and compacting the excavated pit to lines and levels with excavated materials as directed by the departmental officers at site and reporting the pavement composition with photographs and measurements specifying the type of layers
od26005/2017-2018: Data for inventory survey upto 12 meter wide road for survey work of collecting road inventories and recording in prescribed format attached based on chainage marking including marking chainage at 50m interval and taking details such as existing carriageway width,shoulder width, Type of shoulder ,width and location of approach road ,details of existing drains,culverts and bridges as given in the format attched,pavement conditions(details of potholes, raveling, fog seal,slurry seal edge damage etc)raod safety measures (details of road sign,crash barriers,guard stones,delineator post, hazard markers etc) and all other existing retaining structures in road,including documentation charges etc as per direction of the officers at site
Collection of sub-grade soil sample at 500m interval carefully by excavating pit of area 1.0*0.6m through overlying bituminous and granular layer or from subgrade of formation area as directed by the engineer in charge for laboratory test and filling back and compacting the excavated pit to lines and levels with excavated materials as directed by the departmental officer at site.
Conducting Soil Classification test, Modified Proctor Test,and CBR test as per the IS Code guidelines and making report of one soil sample
NIYAS K
THE URALUNGAL LABOUR CONTRACT CO-OPERATIVE SOCIETY
JAMSHAD NASEERI P.K
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_755830.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .