| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.2 LAccepted-AOC MELARCODE | MADURAI | TAMIL NADU | 625001 | L1 | Accepted-AOC LOWEST BIDDER | |
| 2 | L2₹5.2 L+₹3,101.90 (0.60%)Rejected-AOC | L2 | Rejected-AOC SECOND LOWEST BIDDER | |
| 3 | L3₹5.3 L+₹13,879.64 (2.69%)Rejected-AOC | L3 | Rejected-AOC THIRD LOWEST BIDDER | |
| 4 | L4₹5.8 L+₹63,104.49 (12.2%)Rejected-AOC | L4 | Rejected-AOC FORTH LOWEST BIDDER | |
| 5 | L5₹5.9 L+₹68,730.37 (13.3%)Rejected-AOC | L5 | Rejected-AOC FIFTH LOWEST BIDDER |
Tender Value
₹6.2 L
EMD Value
₹9,400
Closing Date
6 Jul 2021, 5:00 pmClosed
Assistant Executive Engineer
Assistant Executive Engineer, LBC Sub Division, Malampuzha Project, Tharekkad, Palakkad Head Post Office Pin 678001
MP LBC Modernisation of Field Channels and Drains Construction of field channel offtake Ch. 0/680 km of Pallavur No.1 branch canal to Marikolumbu Padasekhara Samithi in Pallassena Panchayath
2021_Irrig_427622_1
11/ET/AEE/LBC/PKD/2021 - 22
Open Tender
Civil Works - Canal
Item Rate
180 days
PALLASSENA
Please refer Tender documents.
6 documents required · 6 mandatory
₹1,400
₹9,400
Yes
24 Sept 2021
25 Jun 2021
14 Jul 2021
25 Jun 2021
6 Jul 2021
25 Jun 2021
25 Jun 2021 - 5 Jul 2021
Amount
Demolishing damaged channel
15.2.2 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix)
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
4.3.1 : Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
4.1.5 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
4.1.3 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
50.13.1 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
50.2.26.1 : Filling with contractor own earth (excluding rock) in open areas in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge.
S.Sadasivan Nair
BENNY KURIAKOSE
C. Arunkumar
C Jayanarayanan
RAJALEKSHMY B.
Bidder Name
S.Sadasivan Nair
C Jayanarayanan
BENNY KURIAKOSE
C.K.BABU
RAJALEKSHMY B.
C. Arunkumar
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_606837.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .