Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.6 LAccepted-AOC | ₹16.6 L | L1 | Accepted-AOC L1 |
| 2 | L2₹17.8 LRejected-AOC THALAPPAN HOUSE MORAZHA | KANNUR | KERALA | 670001 | ₹17.8 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | E P ARUN KUMAR L1 | YADUKRISHNAN.T.P L2 |
|---|---|---|---|---|---|
| 1.00Construction Of Toilet Complex | |||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 52.33 | cum | 312.57 ₹16,355.85 | 335.74 ₹17,568.27 |
| 1.00 | OD159435/2025-2026:DRY Rubble masonry without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels including all cost and conveyance of all materials and labour charges | 27.07 | cum | 3,470.05 ₹93,941.19 | 3,727.2 ₹1.0 L |
| 1.00 | OD160874/2025-2026:Laterate masonry with neatly dressed laterate stone of size 35x20x20 cm or nearest size in cement mortar 1:6 for foundation and basement including all cost of materials, labour charges etc. | 14.64 | cum | 6,047.79 ₹88,539.65 | 6,496.02 ₹95,101.73 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 4.02 | cum | 6,893.15 ₹27,731.14 | 7,404 ₹29,786.29 |
| 1.00 | 2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 20.6 | cum | 276.73 ₹5,700.64 | 297 ₹6,118.20 |
| 1.01 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 18.72 | sqm | 335.54 ₹6,280.30 | 360 ₹6,738.12 |
| 1.01 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 2.91 | cum | 9,114.04 ₹26,503.63 | 9,789.52 ₹28,467.92 |
| 1.01 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 4.97 | sqm | 876.36 ₹4,353.76 | 941 ₹4,674.89 |
| 1.01 | 5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 1.24 | cum | 11,098.17 ₹13,783.93 | 11,920.7 ₹14,805.51 |
Updated dates
Tender Value
₹17.8 L
EMD Value
₹44,569
Closing Date
29 Oct 2025, 9:00 amClosed
MOHAMMED SALIH V
Assistant Engineer LIDEW Section Anthoor municipality
Anthoor Municipality -Project No154/25-26-Construction Of Parassinikadavu Toilet Complex
2025_LSGD_811438_7
05/2025/AE/LIDEW/AND/25-26
Open Tender
Civil Works - Buildings
ANTHOOR
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹44,569
Yes
21 Jan 2026
21 Oct 2025
29 Oct 2025
21 Oct 2025
29 Oct 2025
21 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.28 MB
Tendernotice_2.pdf
PDF • 0.25 MB
Tendernotice_3.pdf
PDF • 0.25 MB
BOQ_1355468.xls
BOQ • 0.27 MB
PA154.pdf
Tender Documents • 0.26 MB
SBD154.pdf
Tender Documents • 0.98 MB
FOT154.pdf
Tender Documents • 0.25 MB
AFFI154.pdf
Tender Documents • 0.24 MB
Download all tender documents and submit your bid