| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.4 LAccepted-AOC NEW JAIL ROAD SABROOM SOUTH TRIPURA | ₹18.4 L | L1 | Accepted-AOC As per Bid Opening Summary |
| 2 | Rejected-Technical VILL AMTALI WARD NO 09 SABROOM SOUTH TRIPURA PIN 799145 | SABROOM | SOUTH TRIPURA | TRIPURA | 799145 | - | - | Rejected-Technical As per Bud Opening Summary |
| 3 | Rejected-Technical 129 AD NAGAR WORD NO 23 AGARTALA WEST TRIPURA PIN 799003 | WEST TRIPURA | TRIPURA | 799003 | - | - | Rejected-Technical As per Bud Opening Summary |
| 4 | Rejected-Technical | - | - | Rejected-Technical As per Bud Opening Summary |
| 5 | Rejected-Technical DAKSHIN SRINAGAR MAGURCHHA SOUTH TRIPURA PIN 799143 | SOUTH TRIPURA | TRIPURA | 799143 | - | - | Rejected-Technical As per Bud Opening Summary |
Tender Value
₹24.3 L
EMD Value
₹48,533
Closing Date
18 May 2026, 12:00 pmClosed
EXECUTIVE ENGINEER
Executive Egnineer, PWD (R and B), Sabroom Divn
Construction of Additional Class Room at Sabroom English Medium HS School, Sabroom, South Tripura. (Under MPLAD Fund) - Phase - II.
2026_CEPWD_72725_1
01/PNIeT/26-27. 01/DNIeT/EE/SBM/DIVN/26-27
Open Tender
Civil Works - Building
180 days
Sabroom
Please refer Tender documents.
5 documents required · 5 mandatory
₹1,000
₹48,533
12 Jun 2026
11 May 2026
18 May 2026
11 May 2026
18 May 2026
11 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
All kinds of soil | 0.4 | Cum | 231.6 | ₹92.41 | BOQ_2024_10101 |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
All kinds of soil | 0.6 | Cum | 161.3 | ₹96.78 | BOQ_2024_10102 |
| 3 | Supplying and filling in plinth, under floor, foundations etc. with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete. | - | Cum | 1,177.3 | - | BOQ_2024_10103 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering -
All work upto plinth level:
1:4:8 ( 1 Cement: 4 fine sand : 8 graded stone aggregate 40 mm nominal size) | - | Cum | 9,960.7 | - | BOQ_2024_10104 |
| 5 | Centering shuttering including struttings, propping etc. and removal of form work for:
Foundations, footings, bases for columns. | - | Sqm | 303.1 | - | BOQ_2024_10105 |
| 6 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement- -All work upto plinth level:
1:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stone aggregate 20 mm nominal size) | - | Cum | 1 | - | BOQ_2024_10106 |
| 7 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and skirting courses, fillets, columns, pillars, piers, abutments, posts and struts etc. upto floor five level excluding cost of centring, shuttering, finishing and reinforcement-
1:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stone aggregate 20 mm nominal size) | - | Cum | 13,305.8 | - | BOQ_2024_10107 |
| 8 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto floor five level excluding the cost of centring, shuttering, finishing and reinforcement-
1:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stone aggregate 20 mm nominal size) | 1 | Cum | 12,104.7 | ₹12,092.6 | BOQ_2024_10108 |
| 9 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
Thermo-Mechanically Treated bars of grade Fe-500D or more | 0.6 | Kg. | 103.9 | ₹62.24 | BOQ_2024_10109 |
| 10 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level.
Thermo-Mechanically Treated bars of grade Fe-500D or more | 1 | Kg. | 103.9 | ₹103.8 | BOQ_2024_10110 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_74027.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.36 MB
DNIT_Final_Ltst.pdf
Tender Documents • 2.76 MB
BOQ_74027.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid