Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹4.9 L
EMD Value
₹9,776
Closing Date
17 Dec 2022, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Soil Conservation Officer, Division Baramulla.
Soil Conservation Officer, Division Baramulla.
Construction of Toilet at Sopore Nursery as per BOQ Construction of Green House for Poly Pots at Sopore Nursery as per BOQ Raising Restocking of Naked Root Pricking into Nursery
2022_SWCD_199289_1
E- NIT NO 31 of 2022-23 DATED 12 -12 -2022
Open Tender
Civil Works
Item Rate
30 days
Construction of Toilet at Sopore Nursery as per BO
Please refer Tender documents.
2 documents required · 2 mandatory
₹700
Soil Conservation Officer, Division Baramulla.
₹9,776
17 Dec 2022
12 Dec 2022
17 Dec 2022
12 Dec 2022
17 Dec 2022
12 Dec 2022
Name of Nursery: Sopore Nursery Location of Nursery: Ningli Sopore Zone : SWC Sopore Division: Soil & Water Conservation Division Baramulla
Raising/ Restocking of Naked Root Pricking into Nursery Beds at Sopore Nursery Under CAMPA APO 2022-23 includes all operations i.e. Bed formation and preparation of Soil involving twice earth work in hard soil not exceeding 30 cms in depth with clad breaking , pulverising of top soil , dressing of beds , smoothening of surface , Repairs of berms,, paths, cross paths for Raising of Broad leaved pricking and supply of Farm Yard Mannure (FYM) ,its cost/ carriage ( Mechanical / Head load upto site of work and its Application in the Beds as per the standard Nursery practices, than Planting of pricking in lines at a spacing of 1 ft, x1 ft. i.e 80 nos in a Bed complete job as per BOQ but excluding the Cost/ Carriage of Pricking to be supplied by the contractor already qualified for the Supply of pricking materials for raising of nursery stock No. of Beds of size 20’x4’= 744 Beds No. of pricking to be planted at a spacing of 1 ft. x1 ft. i.e 80 Nos per Bed = 15550 Nos Note: Prickings shall be supplied departmentally.
Green House for Sopore Nursery
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 mtr in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, depth up to 1.5mtr. including disposal of excavated earth up to 1 mtr from cutting edge, disposed earth is to be leveled and neatly dressed 2x2(63’-0”+ 11’-0”) x 1’-0” x 1’-0” = 296 cft or 8.38 cum
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering- All work up to plinth level. 1:3:6 (1 cement: 3 coarse sand: 6 graded stone aggregate 20mm nominal size) crushed 2x2x (63’-0”+11’-0”) x 1’-0”x2’-0”= 592cft or 16.76 cum
Centering and shuttering including propping, strutting etc. & removal of form for; walls (any thickness) including attached pilasters, buttresses, plinth & string courses 2x2(63’-0”+11’-0”) = 296rft x 1’-0”= 296sft x2= 592sft or 55.01sqm
Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete 36 x 8’-0” = 288rft or 87.8m @ 3.8kg/m = 333.64 kg
Carriage of different materials from source to site of work (a) sand/bajri average lead of 15 km by MT Qtty vide (3) = 22.62 cum
(b) Cement/steel average lead of 5 km by MT Qtty vide (3,5) =4.02 MT
Construction of Toilet at Sopore Nursery
Brick work with common burnt clay F.P.S.(non-modular) bricks of class designation 75 in foundation and plinth in Cement mortar 1 :6 ( 1 cement : 6 coarse sand) in superstructure above plinth level up to floor V level. (By manual means) 2x(5’+4’-6”) x 9”x8’ = 114cft D/d openings D= 1x2’-6”x9”x7’= 13.12cft V = 1x3’x9”x2’-6”= 5.62cft Lintel = 2x (5’+4’-6”)x9”x1’=14.25cft -------------------------- 81.01cft soakage 3.14/4x(6’^2- 4’-6”^2)x1’ = 12.36cft 3.14/4x{(6’^2-4’-6”^2) + (4’^2- 2’6”^2)}/2 x7’ = 70.06cft @ 50%= 35.03cft -------------------- 47.39cft T = 128.4 cft or 3.59cum
Hand packed stone filling in horizontal including cost of stones ramming , watering complete job. Toilet bed 1x2’-6”x3’-6”x2’-6” = 21.87ft or 0.61cum Septic / soakage 1x6’x4’-6”x6”=13.5cft 3.14/4x (4’-6”^2 + 2’-6”^2)/2 x 7’=72.8cft ------------------- 86.3cft or 2.41cum T = 3.02cum
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level 1:4:8 (1 cement: 4 coarse sand: 8 graded stone aggregate 40mm nominal size) Crushed 1x2’-6”x3’-6”x4”= 2.88cft or 0.08cum septic 1x6’x4’-6”x4”= 8.91cft or 0.24cum T =0.32cum
Cement concrete flooring 1:2:4 ( 1 cement: 2 coarse sand .: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry, but excluding the cost of nosing of steps etc. complete. 50 mm thick with 20mm nominal size stone aggregate.( Crushe 1x 4’-6”x3’-6” = 15.75sft or 1.46sqm septic 1x5’x3’-6” = 17.5cft or 1.62cum T = 3.08sqm
Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia and length (hold fast lugs or with dash fasteners shall be paid for separately): 1st class kail wood 2x 7’x3”x5”= 1.435cft 1x3’x3”x5”= 0.30 cft V=( 2x3’+3x2’-6”)x 3”x5”= 1.38cft ---------------------- 3.11cft or 0.08cum
Providing and fixing paneled or paneled and glazed shutters for doors, windows and clerestory windows including lSI marked M.S. pressed Butt hinges bright finished of required size with necessary screws excluding paneling which will be paid for separately,al! complete as per direction of engineer- in charge 35mm thick W=1x 2’-6 X 3’=7.5sft ------------------- 7.5sft or 0.69sqm
Providing and fixing lSI marked flush door shutters conforming to IS: 2202 (Part I) non-decorative type, core of block board construction with frame of 1st class hard wood and well matched commercial ply veneering with vertical grains or cross bands and face veneers on both faces of shutters 30 mm thick including lSI marked M.S. pressed bright finished butt hinges with necessary screws of required size. Including handles and bolts complete job. D= 1x 2’-6”x7’=17.5sft or 1.62sqm
Providing and fixing plane glass panes 4mm thick including nails , beadings complete job. 2x 1’-6”x2’-6” = 7.5 sft
15mm Cement plaster on the rough side of single or half brick wall of mix: ( 1 cement : 4 fine sand) outer 2x(6’+5”)x10’-6” = 231sft Inner 2x (4’-6”+3’-6”) x8’ = 128sft 1x4’-6”x3’-6”= 15.75 sft -------------------- 374.75sft D/d openings 1x 2’-6”x 7’=17.5 sft 1x 3’x2’-6” = 7.5 sft --------------- 25sft T = 349.75 sft or 32.52 sqm
Providing hoisting and fixing trusses/purlins rafters/posts/ post-plates or like components including cost of screws etc. complete First class Budloo/ Fir wood 2x 10’x4”x6”= 3.30 cft Posts 2x3’x4”x4”=0.65cft 2x6’x4”x4”= 1.30cft Rafter 2x10’x4”x4”= 2.17cft Purlins 5x9’x3”x5”= 4.61cft -------------------- 12.03 cft or 0.33cum
Providing corrugated G. S. sheet roofing including vertical/ curved surface fixed with polymer coated J or L hooks, bolts and nuts 8mm diameter with bitumen and G. I limpet washers or with G. I. limpet washers filled with white lead and including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete (upto any pitch in horizontal/vertical or curved surface)excluding the cost of purlins, rafters and trusses and including cutting to size and shape whereever required. 0.63mm thick with zinc coating not less than 275gm/m 0.50mm thick 1x 9’x11’-2”’ = 100.62sft or 9.35sqm
Providing and fixing water closet squatting pan ( Indian type W.C. pan) with 100 mm sand cast Iron / PVC P or Strap, 10 liter low level P.V. C. flushing cistern including flush pipe (of approved make) "manually controlled device (handle lever) conforming to IS:7231, with all fittings and fixtures complete, including cutting and making good the walls and floors wherever required . Orissa pattern white vitreous china W.C. pan of size 580x440 mm with integral type foot rests. Including cp long bend and pvc connections complete job. 1 No
Providing and fitting PVC soil pipes and other accessories of FINOLEX/ PRINCE or equivalent made including excavation of trenches ,refilling same complete job. (a) 4” PVC pipe with collars = 5 no
(b) 4” D/bend = 1 no
© 4” P/bend = 2 no
Providing and fixing G.l. pipes complete with G.l. fittings and clamps, including cutting and making good the walls etc.: Concealed pipe including painting with anti-corrosive bitumastic paint, cutting chases and making good the wall 15 mm dia. nominal bore 1x 6 .1mtr
Providing and fixing G.l. pipes complete with G.l. fittings including trenching and refilling etc. (external work) 15 mm dia. nominal bore 1x 24.4 meter
Providing and fixing C.P. brass long nose bib cock of approved quality conforming to IS standards and weighing not less than 810 gms.15 mm nominal bore1 no
Providing and fixing C.P. stop cock (concealed) of standard design and of approved make conforming to IS : 8931 15 mm nominal bore1 no
Providing and fixing C.P. brass angle valve for basin mixer and gyser points _of approved make conforming to IS : 8931 15 mm nominal bore 1no
Providing and fixing PVC three layer water storage tanks with all necessary fittings complete job including carriage up to site of work 500 liter
Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto floor five level excluding the cost of centring, shuttering, finishing and reinforcement with 1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20mm nominal size) slab 6’x5’x5” = 12.3 cft Linteis 2x(6’+3’-6”)x 9”x1’ = 14.25 cft -------------------------- 26.55 cft Septic/soakage 1x4’-6”x6’x5”=11.07cft 3.14/4x6^2x5”=11.58cft 49.2cft or 1.37cum
(a) Centring and shuttermg including strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconies and access platform. 4’-6”x3’-6” = 15.75 sft 1x5’x3’-6”=17.5sft 1x3.14/4x4’-6”^2 = 15.89sft ------------ T 49.14sft or 4.57sqm
b) Foundations: footings, bases of columns etc. for mass concrete. Steps 2x2’-6”x1’=5sft 2x2’x1’=4sft 2x1’-6”x1’=3sft 2x1’x1’= 2sft 2x6”x1’= 2sft 4x3’x1’= 12sft -------------------28sft or 2.6sqm
c) Walls (any thickness) including attatched pilasters, buttresses, plinth and string courses etc. Septic walls 2(6’+3’-6”)x5’=95sft 2(6’+5’)x5’=110sft ----------------- 205sft or 19.06sqm
Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete. Thermo-Mechanically Treated bars. 12mm dia bars 1x 12x 6’= 72 rft 1x 14x5 = 70 rft ------------------- 142 rft or 43.29 m @ 0.89kg/m = 38.52 kg Lintel 2x(6’+3’-6”) x 4 76rft 23.17m @ 0.89kg/m =20.62kg 59.14 kg Septic/soakage 15x4’-6” + 11x6’ = 133.5rft or 40.70m 2x7x(6’+1’-6”)/2 =52.2rft or 16mx2=32m ---------------------- 72.7m @ 0.89kg/m= 64.7kg T = 123.84kg
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level 1:2:4 (1 cement: 2 coarse sand : 4 graded stone aggregate 20mm nominal size) (Steps)1x 2’-6” x 1’x3’= 7.5cft 1x 2’x1’x3’= 6cft 1x 1’-6’x1’x3’= 4.5 cft 1x1’x1’x3’= 3cft 1x6”x1’x3’= 1.5cft --------------- 22.5cft or 0.63cum
(a) Providing and fixing electrical points including cost of channels , wirings and other necessary fixtures complete job Lighting point
(b) Service line 7/18
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (Not exceeding 1.5 mtr in width) and for shafts, wells, cesspits and the like not exceeding 1 Osqm on plan, depth upto 1.5mtr. including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth is to be levelled and neatly dressed in: All kinds of soil septic 1x 6’x4’-6”.x6’-3”’= 168.75cft sokage 1x3.14/4 x(6^2 + 4^2)/2 x8’=163.28cft ----------------- 332.03cft or 9.29 cum
Applying priming coat with ready mixed pink or grey primer of approved brand and manufacture on wood work (hard and soft wood) 1.5x3’x2’-6”=11.25sft 2.25x2’-6”x7’=39.37sft --------------50.62sft or 4.7sqm
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade. Two or more coats on new work Qtty vide (26) = 4.7sqm
(a) Carriage of different materials from source to site of work Stone aggregate 40mm average 20km by MT Qtty vide(3) = 0.32cum @ 90% = 0.29cum
(b) Stone aggregate 20mm average 20 km by MT Qtty vide (4,21,24)=2.154cum @ 90% = 1.93 cum
(c) Sand average 10km by MT Qtty vide = (1, 3,4,9,21.24) 2.474cum @45%= 1.11cum 32.52 cum @ 0.015=0.48cum 3.69cum @ 25% = 0.89cum ---------------- 2.48cum
(d) soling stones average 10km by MT qtty vide (2) = 3.02cum Bricks average 10Km by MT Qtty vide (1)= 3.59cum @ 475/cum=1705 no Cement/ steel average 5 km by MT Qtty vide (1,3,4,9,21,24)= 230.65kg +54.4kg+212.68kg+49.28kg+438.4kg+201.6+123.84kg = 1310.85kg or 1.31MT
SHABIR AHMAD BHAT
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .