| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.8 LAccepted-Finance | ₹5.8 L | L1 | Accepted-Finance ACCEPTED |
| 2 | L2₹6.1 LRejected-Finance | ₹6.1 L | L2 | Rejected-Finance REJECTED |
| 3 | L3₹6.1 LRejected-Finance | ₹6.1 L | L3 | Rejected-Finance REJECTED |
Tender Value
₹8.3 L
EMD Value
₹8,309
Closing Date
22 Dec 2025, 5:00 pmClosed
EXECUTIVE ENGINEER
TOWN HALL CHHATRAPATI SAMBHAJINAGAR
M And R to Water Supply distribution system at Sanjaynagar, Ramnagar, Vitthalnagar, Mukundwadi in Zone No. 06
2025_AMCA_1260012_1
CSMC/D.E/W.W/Zone No. 6,7,8,10/2025/337
Open Tender
Miscellaneous Services
180 days
TOWN HALL CHHATRAPATI SAMBHAJINAGAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
₹8,309
27 Apr 2026
15 Dec 2025
24 Dec 2025
15 Dec 2025
22 Dec 2025
15 Dec 2025
Excavation for foundation / pipe trenches in earth, soils of all types, sand, gravel and soft murum, including removing the excavated material upto a distance of 50 metres and lifts as below, stacking and spreading as directed, normal dewatering, preparing the bed for foundation and excluding backfilling, etc comp. Lift 0 to 1.50 M MJP/SSR/2023-24/Page no.37 I.No.1
Excavation for foundation / pipe trenches in hard murum and boulders, W.B.M. road including removing the excavated material upto a distance of 50 metres and lifts as below, stacking and spreading as directed, normal dewatering, preparing the bed for foundation and excluding backfilling, etc comp. Lift 0 to 1.50 M MJP/SSR/2023-24/Page no.37 I.No.3
Excavation for foundation / pipe trenches in soft rock and old cement and lime masonry foundation asphalt road by all means including removing the excavated material upto a distance of 50 metres and lifts as below, stacking and spreading as directed, normal dewatering, preparing the bed for foundation and excluding backfilling, etc comp. Lift 0 to 1.50 M MJP/SSR/2023-2024/ Page No.37 I.No.5
Excavation for foundation / pipe trenches in hard rock and concrete road by chiselling, wedging, line drilling by mechanical means or by all means other than blasting including trimming and levelling the bed, removing the excavated material upto a distance of 50 metres and lifts as below, stacking and spreading as directed, normal dewatering, preparing the bed for foundation and excluding backfilling, etc comp. Lift 0 to 1.50 M MJP/SSR/2023-2024/ Page No.38 I.No.7
Providing D.I. pipes (push on joints pressure pipes of D. I. of following class and diameters confirming to the I. S. specification inclusive cost of jointing materials (Rubber gasket of EPDM Quality ) excluding GST levied by GOI & GOM in all respect including Third party inspection charges of TPI Agency approved by MJP including Transit insurance, Railway Freight, Unloading from railway wagon, Loading into Truck, Transportation to departmental store, unloading, stacking etc. completed as directed by Engineer in charges (IS 1536/2001 for pipes and IS 158/1969 and IS 12820/1989 or latest edition/ revision with amendments for Rubber Gaskets. DI K-7 grade MJP/SSR/2023-2024/Page no.69 I.No.3
Lowering, laying and jointing with SBR rubber gaskets C.I.& D.I. pipes of various classes with CI / MS specials of following diameters in proper position, grade and alignment as directed by Engineer-in-charge including conveyance of material from stores to site of work, excluding cost of jointing materials and rubber rings, including labour, etc complete. Note: Only SBR rubber gaskets to be used as per IS- 5382 / 12820 MJP/SSR/2023-2024/Page no.68 I.No.2 (a)
Cutting and champhering of pipes of following diameters including cost of all materials and labour involved, etc. complete as directed by Engineer-in-charge (for all class of pipes). MJP/SSR/2023-2024/Page no.156 I.No.20
Providing and supplying C.I. detachable joints suitable for A. C. pressure pipes manufactured as per IS-1538-1993 standards of following class and diameter including cost of insurance, railway freight, inspection charges, unloding from railway wagon, loding into truck, transporting to departmental store, unloading, stacking and cost of rubber rings, nut bolts. excluding GST levied by GOI & GOM in all respect etc. complete (IS-1538-1993) MJP/SSR/2023-2024/Page no. 73 I.no.13
Supply of C. I. Mechanical Compression Collar Coupling suitable for C. I. Spun Pipes ( as per - IS - 1536 /2001) and complete with sealing rubber gasket of SBR,.C.I. follower Glands and M.S. nut Bolts.The whole assembly should be mechanically and hydraulically tested to the provisions as laid down in IS:1538 /1993. MJP/SSR/2023-2024/Page no.161 I.No.2
Checking & Repairing Private Water connection and reconnecting the same etc complete
Disconnection of unauthorised private water connection etc.complete.
Making cross connection to existing distribution main of any type including excavation, breaking and removing existing pipes, lowering, laying of specials and pipes in their position, refilling, closing the water supply in that area, dewatering and restarting the water supply, etc. complete as directed by Engineer-incharge for following diameters of existing pipeline, irrespective of diameter of branch line. (The number of joints involved will be paid separately depending upon the nature of joints and required pipes, valves and specials will be supplied free of cost at stores.) MJP/SSR/2023-2024/Page no.58 I.No.10
Providing double flange sluice valve confirming for IS- 14846 including worn gear arrangements as per test pressure, stainless steel spindle, caps, including inspection charges, transportation upto departmental store, unloading, stacking excluding GST levied by GOI & GOM in all respect etc. complete. Sluice valve PN-1 (Without by pass arregement) MJP/SSR/2023-2024/Page no.145 I.No.2 (A)
Lowering, laying and jointing in position following C.I.D/F Reflex valves, Butterfly valves and Sluice valves including cost of all labour jointing material, including nut bolts and giving satisfactory hydraulic testing etc. complete. (Rate for all class of valves.) MJP/SSR/2023-2024/Page no.148 I.No.4
Removing existing cross connection and remaking the same etc complete (70% Rate of making cross connection.) MJP/SSR/2023-2024/Page no.58 I.No.10
Removing and refixing the half body of Sluice Valves including excavation, refilling, cost of rubber packing, nut bolts, with gate, gland rope, repair by welding etc complete (70 % Rate of laying Sluice Valves ) MJP/SSR/2023-2024/Page no.148 I.No.4
Providing and supplying S.S. spindle rod as per standard specifications and suitable for Sluice Valves etc complete. (As Per Market rate )
Providing and supplying Gun metal check nut of following diameter of Sluice Valves as per standard specifications, etc. complete
Repair the gate by welding to make it in orignal position etc comp
Providing and fixing M.S. extension rod as per site requirment to fix above existing sluice valve as directed by engineer in charge etc. complete. (As per Market Rate)
Providing and Supplying M.S. clamp for pipes of following diameters etc comp. (As Per Market rate )
Providing and supplying ISI standard CI flanged / S& S specials including all statutory duties & taxes such as GST levied by GOI & GOM in all respect, railway freight, insurance, unloading from railway wagon, loading into truck transport to departmental store /site, unloading stacking etc. complete. C) Plain ended/plain ended branch flanged specials - MJP/SSR/2023-2024/ Page no.70, I.No.6 (C)
Dewatering the excavated trenches and pools of water in the building trenches / pipeline trenches, well works by using pumps and other devices including disposing off water to safe distance as directed by Engineer-in-charge (including cost of machinery, labour, fuel), etc. complete. MJP/SSR/2023-2024/Page no.40 I.no.14
Providing and laying in situ Cement Concrete M-15 of trap/ granite / quartzite / gneiss metal for foundation and bedding including bailing out water, form work, compaction, curing, etc. complete. MJP/SSR/2023-2024/Page no.49 I.no.01
Providing and making lead caulked joint with molten lead to Cast Iron pipes and / or specials of all classes and fitting of following dia including cost of lead and all jointing material, labour, hydraulic testing etc. complete. MJP/SSR/2023-2024/Page no. 69 I.no.4
Refilling the trenches with available excavated stuff with soft material first over pipeline and then hard material in 15 cm layers with all leads and lifts including consolidation, surcharging, etc. complete. MJP/SSR/2021-2022/Page no.45 I.No.15
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.14 MB
BOQ_2171504.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid