Tender Value
₹9.1 L
EMD Value
₹18,213
Closing Date
25 Aug 2026, 1:00 pmClosed
Executive_Engineer_Kolkata_North_Division_PWD
O/O_Executive_Engineer_Kolkata_North_Division_PWD 166_10 BT Road Dunlop Kolkata_108
Restoration work of damages done by CESC near Bonhooghly crossing (both Kolkata bound and Barrackpore bound Lane) on BT Road (Ch. 10.85 kmp), during the year 2026-27, under Kolkata North Division, P.W.Dte
2026_WBPWD_5018487_1
WBPWD/EE/KND/NIeT-10/2026-2027
Open Tender
CIVIL WORKS
Percentage
30 days
BT Road
Please refer Tender documents.
5 documents required · 5 mandatory
₹18,213
Yes
13 Aug 2026
13 Aug 2026
27 Aug 2026
19 Aug 2026
25 Aug 2026
19 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately (Reference to MoRT&H's specification clause 202)
By Mechanical Means
Bituminous course | 28.8 | cum | 312.86 | ₹9,010.37 |
| 2 | Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately (Reference to MoRT&H's specification clause 202)
By Manual Means
Granular courses | 43.2 | cum | 582.01 | ₹25,142.83 |
| 3 | Excavation for roadway in soil using manual means including loading in truck for carrying of cut earth to embankment site with all lifts and lead upto 1000 metres (Reference to MoRT&H's specification clause 301). | 100.8 | cum | 212.52 | ₹21,422.02 |
| 4 | Sand Filling in Foundation Trenches with good local sand free from earth not exceeding 150 mm compacted thickness including inundating each layer by profuse water and porking and rammimg layer by layer. Quality of sand is to be approved by the Engineer-in- charge.(Reference to MORT&H's specification 304). | 82.8 | cum | 1,857.71 | ₹1,53,818.39 |
| 5 | Plant Mix Method
Construction of granular sub-base by providing graded material such as natural sand/crushed gravel/crushed stone/combination depending upon the required grading spreading in uniform layers with motor grader on prepared surface, mixing by appropriate mechanical mixure (with controlled addition of water), and compacting with vibratory roller to achieve at least 98% of the maximum dry density for the material determined as per IS:2720 (Part 8), complete as per clause 401
Rate per cum for grading-II Material | 18 | cum | 2,761.79 | ₹49,712.22 |
| 6 | Rate per cum for grading-III Material | 18 | cum | 2,868.96 | ₹51,641.28 |
| 7 | Wet Mix Macadam
Providing, laying, spreading and compacting graded stone aggregate conforming to the grading of table 400- 13 revised vide table 2 of IRC : 109 (2015) to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper tosite, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. The thickness of a single compacted layer shall not be less than 75 mm. (Reference to MoRT&H's specification 406. | 36 | cum | 2,958.71 | ₹1,06,513.56 |
| 8 | Prime Coat
Providing and applying primer coat with cationic bitumen emulsion SS1 grade conforming to IS:8887 on prepared porous granular surface including clearing of road surface and spraying primer using mechanical means (Reference to MORT&H's specification clause 502).
On WMM/WBM surface @ 0.70-1.0kg /sqm. | 72 | sqm | 129.27 | ₹9,307.44 |
| 9 | Tack Coat
Providing and applying tack coat with Cationic bitumen emulsion (RS1) complying with IS:8887 using emulsion pressure distributor on the prepared bituminous/granular /cement concrete pavement surface cleaned with mechanical broom and high pressure air jet (Reference to MORT&H's specification clause 503).
ii)On Granular surface treated with primer @ 0.25kg-0.30 /sqm. | 144 | sqm | 26.22 | ₹3,775.68 |
| 11 | Dense Graded Bituminous
Macadam
Providing and laying dense graded bituminous macadam using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0% (min.) for Grading 1 & 4.5% (min.) for Grading 2 by weight of total mix and filler(Cement /lime / Rock dust), transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORT&H specification clause No. 505.4 complete in all respects (Reference to MORT&H's specification clause 505).
With Continuous Type HMP(60-90 ΤΡΗ)
for Grading 1 (37.5 mm nominal size) | 14.4 | cum | 14,524.89 | ₹2,09,158.42 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.59 MB
AnnexureXnew.pdf
Additional Documents • 0.01 MB
2911iiason01122019.pdf
Tender Documents • 0.54 MB
BOQ_5089721.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].