Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1st Lowest₹9.4 LAccepted-AOC VILLAGE JOTHBHIM P O HATGACHA P S KLC KOLKATA 700 156 | 24 PARAGANAS NORTH | WEST BENGAL | 700156 | ₹9.4 L | 1st Lowest | Accepted-AOC 1st Lowest |
| 2 | 2nd Lowest₹9.5 L+₹9,223.23 (0.98%)Rejected-Finance | ₹9.5 L+₹9,223.23 (0.98%) | 2nd Lowest | Rejected-Finance 2nd Lowest |
| 3 | 3rd Lowest₹9.7 L+₹24,436.82 (2.60%)Rejected-Finance BHIAGRAM ENGLISH BAZAR MALDA | MALDA | ₹9.7 L+₹24,436.82 (2.60%) | 3rd Lowest | Rejected-Finance 3rd Lowest |
Tender Value
₹9.5 L
EMD Value
₹19,017
Closing Date
3 Jun 2026, 12:30 pmClosed
Executive_Engineer
ADMINISTRATIVE BUILDING, WATER TREATMENT PLANT SITE, NEAR TANK NO I, NEW TOWN, RAJARHAT, KOLKATA 700 163
Day to day Survey work using Total Station Auto level instruments and other moderate instruments, machinery alongwith Surveyor and Surveyor Assistant, Tools and Plants machinery all complete for providing PHE Services at Action Area-I,II , III
2026_PHED_1024393_2
NIeT- 04 OF 2026-2027
Open Tender
CIVIL WORKS
Percentage
184 days
Action Area-I, II, III
Please refer Tender documents.
8 documents required · 8 mandatory
₹19,017
10 Sept 2026
15 May 2026
5 Jun 2026
15 May 2026
3 Jun 2026
16 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | i) Charges of Survey work with supply of One no. Total station & Surveyor personnal and Surveyor Assistant ,hire charges of the instrument, necessary tools & tackles and all other incidental charges for layout and setting out points for different water supply distribution system and any other works as per requirement including supplying fixing wooden peg for each point under New Town Kolkata Water Supply Project. One computer operator with the knowledge of Auto CAD to be provided for making drawings of survey and other works. After each work one completion drawing should be submitted, both in hard and soft copy to the E.I.C. or his authorised representative. The work should be taken up as per direction of Engineer – In – Charge.
ii) Charges of Survey work with One no. Auto level instrument, along with necessary Surveyor personnal and Surveyor Assistant , hire charges of the instrument, necessary tools & tackles and all other incidental charges for assessing and checking required levels as per direction of Engineer – In – Charge before and after execution of work under New Town Kolkata Water Supply Project. After each work one completion drawing should be submitted, both in hard and soft copy to the E.I.C. or his authorised representative. The work should be taken up as per direction of Engineer – In – Charge.
iii) One vehicle in good condition to be provided to conduct the survey work exclusively for carrying man and survey instrument for each day of survey including fuel charges, and salary of driver and any maintanance work of Vechicle to be born by the agency at his own cost. | 6 | per month | 1,29,311 | ₹7,75,866 |
| 2 | Provisional amount necessary to be paid if any enhancement of rate, order by the Govt. during the maintenance period. | 1 | L.S. | 21,960 | ₹21,960 |
| 3 | Add GST @18% | 1 | L.S. | 1,43,608.68 | ₹1,43,608.68 |
| 4 | Add Cess @1% | 1 | L.S. | 9,414.35 | ₹9,414.35 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.60 MB
Form2911.pdf
Tender Documents • 2.36 MB
BOQ_2517567.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .