Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Responsive |
| 2 | Accepted-Technical VILLAGE CHAMYANA P O KAMLA NAGER BHATTA KUFER DISTT SHIMLA | SHIMLA | HIMACHAL PRADESH | 171001 | Accepted-Technical Responsive |
Tender Value
₹28.0 L
EMD Value
₹56,000
Closing Date
16 Nov 2026, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE Shahpur
Division Shahpur
Providing and Laying Cement Concrete at RD 0/000 to 0/700
2026_PWD_147617_2
NIT No. 6971-90 dt 05-11-2026
Open Tender
Civil Works - Roads
Percentage
60 days
Shahpur
Please refer tender document
11 documents required · 11 mandatory
₹2,000
₹56,000
23 Nov 2026
9 Nov 2026
16 Nov 2026
9 Nov 2026
16 Nov 2026
9 Nov 2026
75 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation, trenches etc. in earth work in all classifications of soil such as pick work, jumper work, pick jumper work, blasting work, jumper blasting work, soft and hard blasting work, and saturated soil, de-watering, including wedging out rocks where blasting work is prohibited, chiseling or any other mixed variety of soil, de-watering and/or removal of slush and incidentals, lift upto any heights, stacking the excavated soil not more than 3 metres (Three meters) clear from the edge of excavation and then returning the stacked soil in 15 cm (Fifteen centimeter) layers, when required into plinths, sides of foundation etc.; consolidating each deposited layer by ramming, watering and then disposing of all excavated earth complete. and direction of Engineer–In-Charge including carriage of materials within all leads, lifts and other incidental.The rate is including octroi, royality, Malkana, toll tax or any other taxes imposed by the Government excluding GST. | 186.5 | Per cubic metre | 294 | ₹54,831 |
| 2 | Providing and laying Stone soling properly handpacked filling interstices with Kharanja stone and consolidating with power road roller to the requested gradient and camber including spreading watering and rolling of binding materials moorum or earth etc. complete as per HP.PWD specification. 100 mm spread thickness (finished work including materials and labour complete as per MORD specification 400. Including carriage of materials in all leads and lifts as per entire satisfaction and direction of Engineer-in-Charge. The rate is including octroi, royality, Malkana, toll tax or any other taxes imposed by the Government but excluding GST. | 112.5 | Per cubic metre | 950 | ₹1,06,875 |
| 3 | Providing and Laying mechanically mixed and vibrated plain cement concrete as per drawings and MORD technical specifications section 800, 900, 1200 and 1600 nominal mix 1:4:8 (One cement isto Four sand isto Eight graded/crushed stone aggregate) 40mm (Forty milimetres) nominal size) for all type of structure like retaining wall / Breast wall etcetra including cost of form work and curing complete as per the direction of Engineer-in-charge including carriage of material, within all leads, lifts of materials and other incidentals.The rate is including octroi, royality, Malkana, toll tax or any other taxes imposed by the Government.But excluding GST. | 197.5 | Per cubic metre | 4,479.65 | ₹8,84,730.87 |
| 4 | Construction of plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement and any other equivalent type as per Clause 1501 using M30 (Grade) (design mix) concrete having coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm (twenty five millimetres), mixed in a concrete mixer of not less than 0.20 cum (zero point two cubic meter) complete as per MORD specification 400. Including carriage of materials in all leads and lifts as per entire satisfaction and direction of Engineer-in-Charge. The rate is including octroi, royality, Malkana, toll tax or any other taxes imposed by the Government but excluding GST. | 181.31 | Per cubic metre | 7,800 | ₹14,14,218 |
| 5 | Providing and laying mechanically mixed and vibrated plain cement concrete in open foundation for all type of structure complete using plain cement concrete grade M-10 ( M-ten) nominal mix 1:3:6 (one cement isto three sand isto six crushed stone aggregate 40 mm (forty millimetre) nominal size on ground in or under water including curing complete including pumping or bailing out water , dewatering removal of slush as required at site which may arrise at the time of laying concrete complete for all heights/ depths including the cost of form work in toe wall etctera as per drawings and M.O.R.D. technical specification section/ clause 800,900 & 1200 and as per the direction and entire satisfaction of Engineer-in-Charge complete, including carriage of materials with in all leads, lifts and other incidentals.The rate is including octroi, royality, Malkana, toll tax or any other taxes imposed by the Government.But excluding GST. | 65 | Per cubic metre | 5,220.9 | ₹3,39,358.5 |
stage.html
html • 0.02 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.79 MB
SBD5.pdf
Tender Documents • 5.64 MB
BOQ_220504.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .