| 1 | L-1₹58.7 LAccepted-AOC | ₹58.7 L | L-1 | Accepted-AOC L-1 |
| 2 | L-2₹64.3 LRejected-Finance 343 ASHOK NAGAR ETAWAH | ₹64.3 L | L-2 | Rejected-Finance ADMITTED |
| 3 | L-3₹65.5 LRejected-Finance ALAMPUR FATEHPUR JANPAD ALIGARH | ALIGARH | UTTAR PRADESH | ₹65.5 L | L-3 | Rejected-Finance ADMITTED |
| 4 | L-4₹72.5 LRejected-Finance GRAM POST LAGUCHA DISTRICT LAKHIMPUR KHERI UTTAR PRADESH | KHERI | UTTAR PRADESH | 261501 | ₹72.5 L | L-4 | Rejected-Finance ADMITTED |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | BHAMAR SINGH L3 | RADHA CONSTRUCTION L2 | Jagat Construction L4 | KEDAR NATH DUBEY L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in canal embankment / Marginal embankment / flood embankment / flood works / trenches with its proper disposal and their dresssing within 30M lead and 1.50m lift Including refiling the trenches etc and as per direction of Engineer in charge. | 2,001 | cum. | 80 ₹1.6 L | 51.17 ₹1.0 L | 63.75 ₹1.3 L | 60 ₹1.2 L |
| 2.00 | Earth work in in embankment by power transpored earth with a lead beyond 200 m and upto 1Km Including Excavation loading unloading manual compaction, dressing and all lift coplete as per direction of Engineer in charge. excluding Royalty | 3,747 | cum. | 100 ₹3.7 L | 95.12 ₹3.6 L | 118.5 ₹4.4 L | 100 ₹3.7 L |
| 3.00 | Supplying, laying and placing of 200 GSM Geo textile Sheet on slope including all cost of material labour T&P etc for proper completion of work as per direction of Engineer in charge | 2,137.5 | sqm | 50 ₹1.1 L | 66.22 ₹1.4 L | 82.5 ₹1.8 L | 90 ₹1.9 L |
| 4.00 | Supplying and filling of Geo Bag filled with local sand/earth. Sewing & placing in position in polypropelene rope gabion with lid only of size(1.8x1.8x0.5 m) at site , with all cost of material, labour T&P and taxes etc as per direction of Engineer in charge. | 1,417 | Nos | 2,800 ₹39.7 L | 2,746.04 ₹38.9 L | 3,259.13 ₹46.2 L | 2,650 ₹37.6 L |
| 5.00 | Supplying, laying and placing of R.C.C (M-20 grades) porcupine and filling jhankar or jhau in water with binding of murga jali including all cost of materials, labours, T & P with all taxes etc. Required for proper complition of work as per direction of Engineer in charge But excluding cost of G.S.T. | 324 | Nos | 6,000 ₹19.4 L | 5,976.05 ₹19.4 L | 5,806.13 ₹18.8 L | 4,400 ₹14.3 L |
Tender Value
₹96.6 L
EMD Value
₹1.9 L
Closing Date
16 Mar 2026, 3:00 pmClosed
SUPERINTENDING ENGINEER
SE VTH CIRCLE IW BAREILLY
Janpad Pilibhit main katna nadi ke dayein kinare par sthith dheemarpura gram samuh ki katab nirodhak karye.
2026_UPIDC_1122635_1
06/SE/2025-26
Open Tender
Civil Works
90 days
PILIBHIT
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,715
Yes
₹1.9 L
Yes
10 Apr 2026
9 Mar 2026
16 Mar 2026
9 Mar 2026
16 Mar 2026
9 Mar 2026
Earth work in canal embankment / Marginal embankment / flood embankment / flood works / trenches with its proper disposal and their dresssing within 30M lead and 1.50m lift Including refiling the trenches etc and as per direction of Engineer in charge.
Earth work in in embankment by power transpored earth with a lead beyond 200 m and upto 1Km Including Excavation loading unloading manual compaction, dressing and all lift coplete as per direction of Engineer in charge. excluding Royalty
Supplying, laying and placing of 200 GSM Geo textile Sheet on slope including all cost of material labour T&P etc for proper completion of work as per direction of Engineer in charge
Supplying and filling of Geo Bag filled with local sand/earth. Sewing & placing in position in polypropelene rope gabion with lid only of size(1.8x1.8x0.5 m) at site , with all cost of material, labour T&P and taxes etc as per direction of Engineer in charge.
Supplying, laying and placing of R.C.C (M-20 grades) porcupine and filling jhankar or jhau in water with binding of murga jali including all cost of materials, labours, T & P with all taxes etc. Required for proper complition of work as per direction of Engineer in charge But excluding cost of G.S.T.
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
techsummary_2090663.pdf
BOQ Comparative Chart
xlsx
finsummary_2090663.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.60 MB
BOQ_2090663.xls
BOQ • 0.28 MB
LOT05.pdf
Tender Documents • 1.68 MB
Download all tender documents and submit your bid