Tender Value
₹14.8 L
EMD Value
₹15,000
Closing Date
29 Jun 2026, 6:00 pmClosed
Executive Engineer, K. B. C. Division No.1/1,Radhanpur -385340
Maintenance and Repairing Work of Chachasna Distributary, Chalwada Distributary Sinad Distributary, Arjasar mr-3 of Sinad Distributary of Radhanpur Branch Canal (slice-1)
312481
06-2026-27
Open
Civil Works - Canal
Works
Patan
4 documents required · 4 mandatory
₹1,062
Executive Engineer K.B.C. Division No. 1-1, Radhanpur
₹15,000
8 Jun 2026
8 Jun 2026
8 Jun 2026
29 Jun 2026
8 Jun 2026
BILL OF QUANTITIES
BILL OF QUANTITIES
1. The bill of Quantities shall be read in conjunction with the Instructions to Bidder,
Conditions of Contract, Technical Specifications and Drawings.
2. The quantities given in the Bill of Quantities are estimated and provisional, and
are given to provide a common basis for bidding. The basis of payment will be the
actual quantities of work ordered and carried out, as measured by the Contractor
and verified by the Engineer and valued at the rates and prices tendered in the
priced Bill of Quantities, where applicable, and otherwise at such rates and prices
as the Engineer may fix within the terms of the Contract.
3. The rates and prices tendered in the priced Bill of Quantities shall, except in so
far as it is otherwise provided under the Contract, include all constructional
plant, layout, supervision, materials, erection, maintenance, insurance, profit,
taxes and duties, together with all general risks, liabilities and obligations set out
or implied in the Contract.
4. The rates and prices shall be quoted entirely in Indian Currency.
5. A rate or prices shall be entered against each item in the Bill Quantities, whether
quantities are stated or not. The cost of Items against which Contractor has failed
to enter a rate or price shall be deemed to be covered by other rates and prices
entered in the Bill of Quantities (in case of Item rate contract).
6. The whole cost of complying with the provisions of the Contract shall be included
in the items provided in the priced Bill of Quantities, and where no Items are
provided the cost shall be deemed to be distributed among the rates and prices
entered for the related items of Work.
7. General direction and descriptions of work and materials are not necessarily
repeated or summarized in the Bill of Quantities. References to the relevant
sections of the contract documentation shall be made before entering rates or
prices against each item in the Bill of Quantities.
8. The method of completed work of payment shall be in accordance with the
specification for Road and Bridge works. For building works specifications for
building are to be followed.
9. Errors will be corrected by the Employer for any arithmetic errors pursuant to
Clause 29 of the Instructions to Bidder.
10. Rock is defined as all materials which, in the opinion of the Engineer, required
blasting, or the use of metal wedges and sledgehammers, or the use of
compressed air drilling for its removal, and which cannot be extracted by ripping
with a tractor of at least 150 kw with a single rear mounted heavy duty ripper.
BILL OF QUANTITIES
(A) Percentage Rate Tender (Up to INR 50 Cr. )
Name of Work :- Estimate for Maintenance and Repairing Work of Chachasna
Distributary, Chalwada Distributary Sinad Distributary, Arjasar mr-3 of Sinad
Distributary of Radhanpur Branch Canal (slice-1)
Description Unit Rate Amount (Rs.)
Providing and Laying HDPE
Liner of 750 micron in bed and
1 slopes of canal at required level 1654.25 Sqmt 199.00
below lining as per drawing and
as directed etc. complete
proving & fixing MS welded
mesh jali of 2.8 mm dia 65mm x
RA- 65mm including cutting in
2 required sizes, fixing in canal
prism etc. complited by Engineer
Providing and laying 5 cms thick
cast in situ cement concrete 1:2:4
grade with the use of crushed
aggregates for canal lining works
including use of all equipments,
scaffolding, centering form work
3 2E etc, with finishing as required to 2482.66 Sqm 275.50
the exposed surface, making
asphalt joints as directed and
watering and curing (without
sleepers) with all lead and lifts
Excavation inall sortsof soil
(includingwet and slushy
condition of soil) with yellow,
sandy, slushy condition of soil)
with yellow, sandy,gravelly soil
including soft murrum & H.M.
including sorting & stacking and
depositing the excavated stuff
inuniform layers as and
wheredirected upto lead of 30 m
and lift as shown belowincluding
clearing the site
etc.compute(including
.(A) For all canal capacity (a)
Providing & Laying in position
"DESIGN MIX" cement
concrete using cement sand and
crushed aggregate for C.C./
R.C.C work by "FLORI"
including necessary formwork,
centering, scaffolding,
compaction by vibrator, curing
as directed with all lead & lift etc
complete without dewatering
and excluding the cost of steel
(B) For Pier and Abutments /
Wing wall / Head wall /
Return wall / Dowel Wall etc. (g)
Concrete grade M-15 and MSA-
/We am/are willing to carry out the work at .......................% above/below percent(Should
be written in figures and words) of the estimated rate mentioned above. Amount of my /our tender
works out as under.
Estimated amount put to tender Estimated amount put to tender
Deduct………% below Add………% Above
In words In words
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
RBC SBD For Chachasana.pdf
RBC M and R BOQ.pdf
Item Wise Detail Secification.pdf
02 Typ cross section Distry.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .