| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.4 CrAccepted-AOC | ₹5.4 Cr | 1 | Accepted-AOC lowest bidder |
| 2 | 2₹5.4 Cr+₹4.9 L (0.91%)Rejected-AOC NP 11 908 HOSPITAL ROAD NILAMBUR MALAPPURAM DISTRICT KERALA 679129 | NILAMBUR | MALAPPURAM DISTRICT | KERALA | 679129 | ₹5.4 Cr+₹4.9 L (0.91%) | 2 | Rejected-AOC Rejected |
| 3 | Rejected-Technical | - | - | Rejected-Technical completed PAC of similar work is less than qualifying amount |
| 4 | Rejected-Technical | - | - | Rejected-Technical Not similar nature of work |
Tender Value
₹6.2 Cr
EMD Value
₹2 L
Closing Date
20 Oct 2023, 4:00 pmClosed
The Superintending Engineer
Office of the Superintending Engineer Siruvani Project Circle Palakkad
reconstruct road bridge with RCC slab over RCC abutments,, side wall with cement concrete ,rectify the damages random rubble masonry walls over existing foundation proposed, repairing with RR masonry and encasing with CC with with nominal reinforcem
2023_Irrig_571882_2
IRR/PI/172/2023-2024
Open Tender
Civil Works - Canal
Item Rate
548 days
Pudusseri and Elapully Panchayath in Palakkad
Refer bid document
11 documents required · 11 mandatory
₹13,010
Yes
₹2 L
Yes
10 Jun 2024
6 Oct 2023
27 Oct 2023
6 Oct 2023
20 Oct 2023
6 Oct 2023
6 Oct 2023 - 12 Oct 2023
Amount
APPENDIX - 1 - RENOVATION AND RECTIFICATION OF WALAYAR MAIN CANAL FROM Ch.0/000 km to 05/600 km
15.2.1:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge.
15.9.2:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar
15.56:Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead.
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
OD29885/2022-2023:Random rubble masonry with hard stone in foundation up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) (Excluding levelleng with cement concrete.)
60.7.9:RR with Departmental. Stone - Random rubble masonry using departmental rubble in foundation and plinth including through and bond stone and levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with Cement mortar 1:6 (1 cement : 6 coarse sand).
60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
4.1.6:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size)
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
60.5.1:DOWEL BARS - Supplying and providing MS dowel bars of size 20 mm dia , 1.5m long (1m in rock and 0.5 m in concrete ) including drilling holes of 25mm dia and filling the gap with cement grout ( 0.25kg/each) etc complete
50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
16.24.1:Providing and fixing precast reinforced cement concrete 1:1.5:3 ( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) Kilo metre stone as per standard design including finishing smooth in 1:3 cement mortar ( 1 cement : 3 fine sand) but excluding the cost of earth work, concrete in foundation, painting and lettering etc. which shall be paid for separately.35x111x25 cm size
16.24.3:Providing and fixing precast reinforced cement concrete 1:1.5:3 ( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) Kilo metre stone as per standard design including finishing smooth in 1:3 cement mortar ( 1 cement : 3 fine sand) but excluding the cost of earth work, concrete in foundation, painting and lettering etc. which shall be paid for separately.35x93.5x18cm size
13.43.1:Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface:Water thinnable cement primer
13.44.1:Finishing walls with water proofing cement paint of required shade:New work (Two or more coats applied @ 3.84 kg/10 sqm)
13.71:Lettering with black Japan pint of approved brand and manufacture
OD30212/2022-2023:Supplying and stacking and providing protection to temporary road crossing diversion across canal due to reconstruction of Bridge at ch. 0/400 km using earth filled bags including all cost , conveyance and all labour charges , etc. complete.
OD30213/2022-2023:Engaging man mazdoor (Coolie) For Temporary road access construction-temporary road crossing diversion across canal due to reconstruction of Bridge at ch. 0/400 km- for placing of Cement concrete pipes and removing the pipes after completion of bridge construction .
OD30214/2022-2023:Supplying and fixing RCC Pipes NP2 Class 600 mm Dia. -for Temporary road access - for temporary road crossing diversion across canal due to reconstruction of Bridge at ch. 0/400 km
2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
ABM4Builders
Bidder Name
ABM4Builders
ccg constructions
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .