| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.1 CrAdmitted-Finance | -27.51% | ₹1.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.4 Cr+₹29.3 L (26.9%)Admitted-Finance | -7.99% | ₹1.4 Cr+₹29.3 L (26.9%) | L2 | Admitted-Finance |
| 3 | L3₹1.5 Cr+₹38.5 L (35.4%)Admitted-Finance | -1.86% | ₹1.5 Cr+₹38.5 L (35.4%) | L3 | Admitted-Finance |
Tender Value
₹1.5 Cr
EMD Value
₹3 L
Closing Date
29 Jun 2026, 6:00 pmClosed
Secretary KDA Kota
KDA Kota
Patch Repair Works in Various Place in Zone III B Area Kota (ARC)
2026_UITKo_568718_1
05/2026-27 (30)
Open Tender
Civil Works
Percentage
365 days
Kota
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,500
OnlineSSO Portal
₹3 L
Yes
16 Jul 2026
16 Jun 2026
30 Jun 2026
16 Jun 2026
29 Jun 2026
16 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per MoRTH Specification Clause 305.4.3 | 1,500 | Sqm | - | - |
| 2 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per MoRTH Specification Clause 401.For Grading III Material | 300 | Cum | 450 | ₹1,35,000 |
| 3 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400-12 & 400-13 and MoRTH Specification Clause 406.By Mechanical Means with all lead | 228 | Cum | - | - |
| 4 | Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base(WBM/WMM) including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per MoRTH Specification Clause 502 | 1,500 | Sqm | - | - |
| 5 | Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.30 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per MoRTH Specification Clause 503. | 11,250 | Sqm | 0.9 | ₹10,125 |
| 6 | Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tones per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 to 4.5 percent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH Specifications Clause 505 complete in all respects. Bitumen (VG-30) Grading - I (37.50mm (Nominal Size)) | 562.5 | Cum | - | - |
| 7 | Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH Specifications Clause 507 complete in all respects for Grading-I ( 19 mm nominal size ) Bitumen (VG-30) | 450 | Sqm | - | - |
| 8 | Providing & laying penetration macadam patching upto 5 cm. depth ( semi grout) with 0.60 Cum. Of coarse aggregate (Crusher broken) & 0.15 Cum of key aggregate (as per MoRTH specification) & spreading of binder, cleaning area of patch, pot holes, cut of regular shape with vertical side, removing all loose & disintegrated material, spreading & compacting of aggregate with 8-10 tonne power road roller including cost of aggregate, fuel, lubrication, hire charges machinery, T & P, including cost of bitumen with application of tack coat. | 2,000 | P sqm | - | - |
| 9 | Repair to pot holes and removal of loose material, trimming of sides, cleaning of surface by providing tack coat, 20 mm thick pre-mix carpet and seal coat type B as per MoRTH specification Clause 3004.2 | 15,000 | Sqm | - | - |
| 10 | Repair to pot holes and removal of loose material, trimming of sides, cleaning of surface by providing tack coat, 13mm thick pre-mix carpet and seal coat type B as per MoRTH specification Clause 3004.2 | 19,100 | Sqm | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.57 MB
CONDITION_30.pdf
Tender Documents • 0.40 MB
BOQ_1011730.xls
BOQ • 0.33 MB
Date_Extend_05.pdf
PDF • 0.16 MB
Date_Extend.pdf
PDF • 0.15 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .