Loading…
Loading…
Tender Value
₹8.0 L
EMD Value
₹8,040
Closing Date
23 Jun 2026, 4:30 pmClosed
Executive Engineer, RWS&S Division, Tenali
BAPATLA
Providing internal CC Drains in SC Colony in Yalavarru village of Amarthaluru Mandal of Bapatla District, Est.Cost.Rs 10.00 Lakhs
947704
NIT No.14/03/15th Finance Tide Grant/2026-27/EE,RWS&S, Bapatla, Date: 05.06.2026
OPEN - NCB
Water Supply
BAPATLA
7 documents required · 7 mandatory
₹285
₹8,040
8 Jul 2026
16 Jun 2026
16 Jun 2026
Cutting open C.C. road surface with concrete saw cutter and removal with Breaker
Earthwork in excavation for foundation as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of side for Drain For Culvert
Stone dust filling in foundation including watering and ramming including cost and conveyance of all materials and labour charges etc.. Complete for drain(0.45 m),for Culvert
Plain Cement concrete (1:3:6) Nominal using 40 to 20 mm m/c chips including cost and conveyance of all materials and labour charges etc.complete for bed of Culvert for drain(0.45 m),for Culvert
Vibrated Cement Concrete (1:2:4) using 20 to 10 mm Graded metal including cost of all materials and labour charges etc,, complete -1 cum with Machine mixing for side walls of drains including conveyance, seigonarage of materials etc complete. For side walls for Drain For Culvert
RCC M-20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement for culvert Slab 47.97m³ culvert Slab of 200 mm thick
Plastering with CM(1:5) 12mm thick including cost and conveyance of all materials and labour charges etc..complete for drain ,for culvert
Plain Cement concrete (1:2:4) Nominal using 20mm m/c chips Mix upto Plinth level for Approaches including cost and conveyance of all materials and labour charges etc.complete For Approaches for culvert
Provision for Steel including cost and conveyance of all materials and labour charges etc.complete
stage.html
html • 0.01 MB
aoc.html
html • 0.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.01 MB
BOQItemswb.xlsx
TENDER_DOCUMENT • 0.02 MB
Vol I Part A.doc
TENDER_DOCUMENT • 0.16 MB
Vol I Part B.doc
TENDER_DOCUMENT • 0.12 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .