Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 62 PINK ROSE COLONY KAIMARI ROAD 125001 | HISAR | HARYANA | 125001 | Admitted-Finance |
| 2 | Admitted-Finance KHASRA NO 183 10 SHYAM VIHAR HISAR HISAR HARYANA 125001 | HISAR | HARYANA | 125001 | Admitted-Finance |
| 3 | Admitted-Finance 00 LALPUR KICHHA ROAD RUDRAPUR KICHHA RUDRAPUR UDHAM SINGH NAGAR UTTARAKHAND 263148 | UDAM SINGH NAGAR | UTTARAKHAND | 263148 | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
Tender Value
₹43.4 L
EMD Value
₹86,860
Closing Date
25 Mar 2024, 5:00 pmClosed
ED - Ambala
ED Ambala
Pdg. Special Repair Improvement of roads under MC Limit Thanesar in Distt. Kurukshetra (Pdg. Line Shifting from Old Mela Bye Pass to village Narkatari upto Sweerage Treatment Plant in Kurukshetra) (Recall)
2024_HRY_356953_2
2024C48CA571 4A16 47C0 9326 106374F1E240663BAR
Open Tender
Electrical Works
Works
360 days
Ambala Cantt
Pdg. Special Repair Improvement of roads under MC Limit Thanesar in Distt. Kurukshetra (Pdg. Line Shifting from Old Mela Bye Pass to village Narkatari upto Sweerage Treatment Plant in Kurukshetra) (Recall)
2 documents required · 2 mandatory
₹5,000
₹86,860
Yes
15 Apr 2024
11 Mar 2024
26 Mar 2024
11 Mar 2024
25 Mar 2024
11 Mar 2024
Amount
SITC of PCC Pole 11 Mtr. Long required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the works...
SITC of ACSR Condoctor 3 SWG with Jumper required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the works.
SITC of ACSR Conductor 80mm2 required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the works.
SITC of LT AB Cable 120 plus 70mm2 required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the works.
SITC of Stay set complete with X-Plate required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the works.
SITC of Stay wire 7/8 SWG required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the works.
SITC of MS Channel Iron 75 x 40mm required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the works.
SITC of MS Channel Iron 100x50mm required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the works.
SITC of MS Channel 100x50x6mm required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the works.
SITC of MS Angle 50x50x6mm required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the works..
SITC of MS Flat 50x6mm required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the works..
SITC of MS Nut and Bolt Off Size required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the works.
SITC of LT Insulator required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the works.
SITC of D-Starp required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the works.
SITC of Disc insulator required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the works.
SITC of Disc Fitting required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the works.
SITC of 11KV pin insulator with pin required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the works. ...
SITC of 11KV GO Switch required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the works.
SITC of T/F Plate Farm with J-Bolt required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the works..
SITC of GI Strip required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the works.
SITC of Earthing rod required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the works....
SITC of 11KV Lighting Arrester set of Three required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the works....
SITC of GSL 8 SWG required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the works.
SITC of LT Fuse Unit Board required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the works...
SITC of MS V-Shape X arm 100x50 required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the works.
SITC of Top Hammer required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the works.
SITC of 11KV XLPE Cable 185mm2 equired to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the works.
SITC of 11KV XLPE Cable box 185mm2 required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the works.
SITC of Danger Plate required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the works..
SITC of Barbed Wire required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the works..
SITC of Number Plate required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the works.
SITC of Aluminium Thimble as per base required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the works.
SITC of Wooden Cleat Suspension Clamp equired to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the works..
Dismantal of PCC Pole complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work. `
Erection of HT T - Off complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work.
Erection of HT Gaurding complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work.
Fabrication charges site of work complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work....
Erection of H-Pole with stay complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work.
Dismantle of H-Pole with stay complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work.
Erection of 25/63KVA Transformer Platform PM S/station complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work.
Dismantle of 25/63KVA Transformer Plateform PM S/station complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work.
Erection of 100/200 KVA Transformer Plateform PM S/station complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work.
Dismantle of 100/200 KVA Transformer Platform PM S/station complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work.
Erection of Three Phase Energy Meter complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work.
Dismantle of Three Phase Energy Meter complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work.
Erection of Single Phase Energy Meter complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work.
Dismantle of Single Phase Energy Meter complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work.
Erection of Service Cable upto 20mtr. complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work.
Dismanatle of Service Cable upto 20mtr. complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work.
Erection of RD Fuse with fitting complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work.
Dismantle of RD Fuse with fitting complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work.
Dismantle of HT Jumper complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work.
Dismantle of PCC Pole 11 Mtr. Long complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work.
Dismantle of ACSR Conductor 80mm2 complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work.
Dismantle of LT AB Cable 120 plus 70mm2 complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work.
Erection of ACSR 50mm2 complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work.
SHREE SAI INTERNATIONAL
J.B.S.Electrical Co.
M/s JSB Enterprises
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .