| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹340.0 CrAccepted-AOC 102 KRISHNA 224 A J C BOSE ROAD KOLKATTA 700 017 | KOLKATA | KOLKATA | WEST BENGAL | 700017 | ₹340.0 Cr | 1 | Accepted-AOC TECHNICALY QUALIFIED L1 BIDDER |
| 2 | 2₹379.8 CrRejected-Finance | ₹379.8 Cr | 2 | Rejected-Finance As per RFP Conditions,cost of FMS for 5 years shall not be less than 20 percentage of total project cost.Hence disqualified. |
| 3 | 3₹392.5 CrRejected-Finance NO 6 1 12TH MAIN OPP MOUNT CARMEL COLLEGE VASANTH NAGAR BENGALURU 560052 | 560052 | ₹392.5 Cr | 3 | Rejected-Finance As per RFP Conditions,cost of FMS for 5 years shall not be less than 20 percentage of total project cost.Hence disqualified. |
| 4 | 4₹418.5 CrRejected-AOC 434 ALAGAPURAM POST PERUMAL MALAI ADIVARAM SALEM 636004 | SALEM | SALEM | TAMIL NADU | 636004 | ₹418.5 Cr | 4 | Rejected-AOC WORK AWARDED TO LOWEST BIDDER |
| 5 | 5₹425.8 CrRejected-AOC | ₹425.8 Cr | 5 | Rejected-AOC WORK AWARDED TO LOWEST BIDDER |
| Sl No | Description | Qty | Unit | Megawin Switchgear Private Limited L6 | RPP INFRA PROJECTS LIMITED L1 | Anvil Energy Private Limited L7 | HKRP INNOVATIONS LIMITED L4 | Deepak Chourasiya L5 | RAILTEL CORPORATION OF INDIA LIMITED L2 | L & T Technology Services Limited L3 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Form 1:Project Management Cost | ||||||||||
| 1.01 | Installation, Testing and Commissioning Cost to Integrate Entire SCADA & IT (relevant to SCADA) Infrastructure | 1 | Rs. | 4,64,56,465 ₹5.5 Cr | 5,19,00,465 ₹6.1 Cr | 5,00,00,000 ₹5.9 Cr | 1,15,00,000 ₹1.4 Cr | 15,78,947.37 ₹18.6 L | 1,06,00,000 ₹1.3 Cr | 14,71,43,356.46 ₹17.4 Cr |
| 1.02 | Integration with legacy applications & Data Migration | 1 | Rs. | - | 1,46,28,750 ₹1.7 Cr | 48,000 ₹56,640 | 10,00,000 ₹11.8 L | 12,63,157.89 ₹14.9 L | 53,00,000 ₹62.5 L | 8,75,133.4 ₹10.3 L |
| 1.03 | Training for the Employees | 1 | Rs. | - | 20,98,093 ₹21.0 L | 18,76,200 ₹18.8 L | 9,38,100 ₹9.4 L | 10,54,143.7 ₹10.5 L | 6,62,924 ₹6.6 L | 32,33,426.84 ₹32.3 L |
| 2.00Form 2: SCADA/DMS Control Centre cost | ||||||||||
| 2.01Server/ workstation Hardware | ||||||||||
| 2.02 | SCADA Server | 2 | Nos | 8,37,416 ₹9.9 L | 37,15,590 ₹45.8 L | 21,40,000 ₹25.3 L | 16,40,000 ₹19.4 L | 10,52,631.58 ₹12.5 L | 13,29,721.22 ₹15.7 L | 14,85,180.74 ₹17.5 L |
| 2.03 | DMS Server | 2 | Nos | 8,37,416 ₹9.9 L | 2 ₹6.72 | 8,37,000 ₹9.9 L | 16,40,000 ₹19.4 L | 10,52,631.58 ₹12.5 L | 13,29,721.22 ₹15.7 L | 10,58,281.9 ₹12.5 L |
| 2.04 | OMS Server | 2 | Nos | 8,37,416 ₹9.9 L | 2 ₹6.72 | 8,37,000 ₹9.9 L | 16,40,000 ₹19.4 L | 10,52,631.58 ₹12.5 L | 13,29,721.22 ₹15.7 L | 10,58,281.9 ₹12.5 L |
| 2.05 | FEP server with interface switches | 2 | Nos | 8,37,416 ₹9.9 L | 22,34,670 ₹27.5 L | 8,37,000 ₹9.9 L | 16,40,000 ₹19.4 L | 10,52,631.58 ₹12.5 L | 13,29,721.22 ₹15.7 L | 10,58,281.9 ₹12.5 L |
Tender Value
Refer Docs
EMD Value
₹5 Cr
Closing Date
26 Jun 2025, 5:00 pmClosed
Chief Engineer(IT,CR and CAPs)
Chief Engineer(IT,CR and CAPs), 8th Floor, Vydyuthi Bhavanam, Pattom, Thiruvananthapuram
SCADA/DMS Implementation in Kollam, Thrissur and Kannur (Group A Towns) for Kerala State Electricity Board Ltd (KSEBL) and Thrissur Corporation Electricity Department (TCED) in Kerala, under RDSS
2025_KSEB_763728_1
CEIT/RITU/RDSS/SCADA DMS/SIA/2025-26/02/ 08-05-25
Open Tender
Miscellaneous Works
900 days
Kerala
Please refer Tender documents.
4 documents required · 4 mandatory
₹17,700
₹5 Cr
Yes
Online and offline at KSEBL HQ
16 Dec 2025
8 May 2025
30 Jun 2025
9 May 2025
26 Jun 2025
10 Jun 2025
9 May 2025 - 27 May 2025
28 May 2025
Form 1:Project Management Cost
Installation, Testing and Commissioning Cost to Integrate Entire SCADA & IT (relevant to SCADA) Infrastructure
Integration with legacy applications & Data Migration
Training for the Employees
Form 2: SCADA/DMS Control Centre cost
Server/ workstation Hardware
SCADA Server
DMS Server
OMS Server
FEP server with interface switches
ISR server
NMS server
DTS server
Developmental server
Commnuication Server
Web/Directory server
SMS gateway
Workstation with dual TFT Monitors (S/S monitoring)
Workstation with dual TFT Monitors (Network monitoring)
Remote VDUs with one TFT Monitors
Developmental console with one TFT
DTS/Workstation Console with dual TFTs
Video Projection system with 2x3 Module configuration with each module at least 60" diagonal with projector
Storage & Backup Devices
External RAID Mass storage device (for 24 months online backup)
External DAT drive
Switches
Layer II switch (SCADA/DMS LAN)
Layer II switch ( Planning & Development system LAN)
Routers
Router for interfacing IT system & SCADA/DMS DR centre
Router at remote VDU
Security system (DMZ)
Web server with load balancing
Mail server
Router
Firewall & network IDS/IPS
Layer II switch
Other Active Devices
GPS Time synchronisation system
Time, day & date digital displays
Printers
Color inkjet printer
B/W Laser printer
Any other items required to meet functional /Performance requirement as per MTS
Sub-Total form -2 (Hardware)
Software for Control Centre
SCADA software
ISR Software
DMS software
OMS Software
DTS software
Developmental software
Network Management Software
WEB /Network security software (INCL IN WEBSERVER)
RDBMS package (incl in ISR)
GIS Adaptor/Engine for importing data from GIS system under IT system
Any other software to meet functional /performance requirement as per MTS
Sub-Total form-2(Software)
Mandatory spares Max 5% of form-2 Hardware
Mandatory spares
Form 3: SCADA/ Disaster Replica Recovery Control Cost
Server/ workstation Hardware
SCADA Server
DMS Server
OMS Server
FEP server with interface switches
ISR server
NMS server
DTS server
Other Active Devices
Developmental server
Commnuication Server
Web/Directory server
SMS gateway
Workstation with dual TFT Monitors (S/S monitoring)
Workstation with dual TFT Monitors (Network monitoring)
Developmental console with one TFT
DTS/Workstation Console with dual TFTs
Video Projection system with 2x3 Module configuration with each module at least 60" diagonal with projector
Storage & Backup Devices
External RAID Mass storage device (for 24 months online backup)
External DAT drive
Switches
Layer II switch (SCADA/DMS LAN)
Layer II switch ( Planning & Development system LAN)
Routers
Router for interfacing IT system & SCADA/DMS DR centre
Security system (DMZ)
Web server with load balancing
Mail server
Router
Firewall & network IPS/IDS
Layer II switch
Other Active Devices
GPS Time synchronisation system
Time, day & date digital displays
Printers
Color inkjet printer
B/W Laser printer
Any other items required to meet functional /Performance requirement as per MTS
Sub -Total Form-3 (hardware)
Software
SCADA software
ISR Software
DMS software
DTS software
OMS Software
Developmental software
Network Management Software
RDBMS package
WEB /Network security software
GIS Adaptor/Engine for importing data from GIS system under IT system
Any other items required to meet functional /Performance requirement as per MTS
Sub-Total(Form-3 Software)
Mandatory spares Max 5% of form-3 Hardware
Mandatory spares
Form 4: RTU
RTUs(E1)
RTU base equipment comprising panels, racks, sub-racks, Power Supply modules, CPU, interfacing equipment, required converters & all other required items/accessories including complete wiring for all modules for locations mentioned
Multifunction transducers
Contact Multiplying Relays (CMRs)
Heavy duty relays for Control
Dummy Breaker Latching Relays
Transformer Transducers
Single TFT PC for LDMS with 2KVA UPS & VRLA Batteries to give 4hrs backup.
Any other hardware to meet functional /performance requirement of MTS
Sub - Total (Hardware) -Form 4(E1)
Software for LDMS(E2)
LDMS software
Any other software to meet functional /performance requirement of MTS
Sub - Total (Software) -Form 4(E2)
TEST EQUIPMENTS for RTU
RTU Database Configuration & Maintenance Software tool
Master Station cum RTU Simulator & Protocol analyser software tool
Laptop PC for above software tools along with interfacing hardware including Hub
Sub - Total (test equipment) -Form 4
MANDATORY SPARES FOR RTU
5% of hardware(E1)
Form 5: FRTU
Built in FRTUs(F1)
Mini pole mounted FRTU base equipment along with enclosure suitable to work in open environment (Adequate protection from water & dust) , racks, sub-racks, Power Supply modules with power backup , I/o modules, CPU, interfacing equipment, required converters & all other required items/accessories including complete wiring for all modules for locations mentioned
Contact Multiplying Relays (CMRs)(may be supplied if required in future)
Heavy duty relays for Control(may be supplied if required in future)
Multifunction transducer(may be supplied if required in future)
Any other hardware to meet functional /performance requirement of MTS
Sub-Total (Hardware) -Form -5
Test Equipments for FRTU
FRTU Database Configuration & Maintenance Software tool
Master Station cum FRTU Simulator & Protocol analyser software tool
Laptop PC for above software tools along with interfacing hardware including Hub
Sub-Total (Test equipment) Form-5
MANDATORY SPARES FOR FRTU
5% of Hardware(F1)
Form 6: MPLS/4G(G1)
Annual Network Connectivity Charges for min10Mbps Links with RTUs
Annual Network Connectivity Charges for min 16 Mbps Aggregate Links at CC
Annual Network Connectivity Charges for min 50 Mbps Aggregate Links at DRR
Annual Network Connectivity Charges for min 2 Mbps Internet Links at CC
Annual Network Connectivity Charges for min 2 Mbps Internet Links at DRR
MPLS Router
Any other hardware to meet functional /performance requirement of MTS
Sub - Total (G1)
GPRS(G2)(4G)
Annual Network Connectivity Charges for min 64kbps 4G/5Gdata for FRTUs /FPI
Modems
Any other hardware to meet functional /performance requirement of MTS
Sub - Total (G2)
Mandatory spares 5% of G1,G2
Form 7: UPS/DCPS(AUX POWER SUPPLY)
Main Equipments - Control centre(H1)
UPS with suitable rating running in parallel redundant mode
VRLA type Battery banks for above UPS for minimum 30 min. backup duration
Sub- Total (H1)
Main Equipments - DRR Centre
Main Equipments(H2)
UPS with suitable rating running in parallel redundant mode
VRLA type Battery banks for above UPS for minimum 30 min. backup duration
Sub-Total H2
For RTU / Data Concentrator / Communication Eqpts.(H3)
DC Power Supply (DCPS) system based on SMPS
Battery bank for above DCPS (VRLA Type) for minimum 4 hrs backup
Sub-Total H3
For FRTU(H4)
24/48 V DC Power Supply (DCPS) system based on SMPS
Common For Both RMU and FRTU (H5)
Battery bank for above DCPS (VRLA Type) for minimum 4 hrs backup (at least 26AH)
Remote VDU , LDMS location(H6)
UPS (2 kVA ) with VRLA Batteries to give 4 hrs back up
Mandatory Spares for UPS
5% of above H1TO H6
Form 8: RMU & Enablers
RMU (FRTU integrated)(way requirement)(J1)
RMU with Built in FRTU with racks, sub-racks, Power Supply modules with power backup , I/o modules, CPU, HDR,CMR ,MFTinterfacing equipment, required converters & all other required items/accessories including complete wiring for all modules for locations
CTC(2CT)
Sub- Total J1
Communicable
Sub-Total J2
Mandatory Spares
5% of above J1 TO J2
Form 9:Training
Operator’s Training
Operator for SCADA/DMS Control Centre
Instructor for DTS
Maintenance Training
Computer Hardware & System Software
Application Software (SCADA/DMS)
RTU & FRTU
Database & display development
Auxiliary Power Supply
Communication System including NMS
Description of Work / Item(s)
Form 1:Project Management Cost
Installation, Testing and Commissioning Cost to Integrate Entire SCADA & IT (relevant to SCADA) Infrastructure
Integration with legacy applications & Data Migration
Training for the Employees
Form 2: SCADA/DMS Control Centre cost
Server/ workstation Hardware
SCADA Server
DMS Server
OMS Server
FEP server with interface switches
ISR server
NMS server
DTS server
Developmental server
Commnuication Server
Web/Directory server
SMS gateway
Workstation with dual TFT Monitors (S/S monitoring)
Workstation with dual TFT Monitors (Network monitoring)
Remote VDUs with one TFT Monitors
Developmental console with one TFT
DTS/Workstation Console with dual TFTs
Video Projection system with 2x3 Module configuration with each module at least 60" diagonal with projector
Storage & Backup Devices
External RAID Mass storage device (for 24 months online backup)
External DAT drive
Switches
Layer II switch (SCADA/DMS LAN)
Layer II switch ( Planning & Development system LAN)
Routers
Router for interfacing IT system & SCADA/DMS DR centre
Router at remote VDU
Security system (DMZ)
Web server with load balancing
Mail server
Router
Firewall & network IDS/IPS
Layer II switch
Other Active Devices
GPS Time synchronisation system
Time, day & date digital displays
Printers
Color inkjet printer
B/W Laser printer
Any other items required to meet functional /Performance requirement as per MTS
Sub-Total form -2 (Hardware)
Software for Control Centre
SCADA software
ISR Software
DMS software
OMS Software
DTS software
Developmental software
Network Management Software
WEB /Network security software (INCL IN WEBSERVER)
RDBMS package (incl in ISR)
GIS Adaptor/Engine for importing data from GIS system under IT system
Any other software to meet functional /performance requirement of MTS
Sub-Total form-2(Software)
Mandatory spares Max 5% of form-2 Hardware
Mandatory spares
Form 3: RTU
RTUs(E1)
RTU base equipment comprising panels, racks, sub-racks, Power Supply modules, CPU, interfacing equipment, required converters & all other required items/accessories including complete wiring for all modules for locations mentioned
Multifunction transducers
Contact Multiplying Relays (CMRs)
Heavy duty relays for Control
Dummy Breaker Latching Relays
Transformer Transducers
Single TFT PC for LDMS with 2KVA UPS & VRLA Batteries to give 4hrs backup.
Any other hardware to meet functional /performance requirement of MTS
Sub - Total (Hardware) -Form 3
Software for LDMS
LDMS software
Any other software to meet functional /performance requirement of MTS
Sub - Total (Software) -Form 3
TEST EQUIPMENTS for RTU
RTU Database Configuration & Maintenance Software tool
Master Station cum RTU Simulator & Protocol analyser software tool
Laptop PC for above software tools along with interfacing hardware including Hub
Sub - Total (test equipment) -Form 3
MANDATORY SPARES FOR RTU
5% of hardware(E1)
Form 4: FRTU
FRTUs(F1)
Mini pole mounted FRTU base equipment along with enclosure suitable to work in open environment (Adequate protection from water & dust) , racks, sub-racks, Power Supply modules with power backup , I/o modules, CPU, interfacing equipment, required converters & all other required items/accessories including complete wiring for all modules for locations mentioned
Contact Multiplying Relays (CMRs)(may be supplied if required in future)
Heavy duty relays for Control(may be supplied if required in future)
Multifunction transducer(may be supplied if required in future)
Any other hardware to meet functional /performance requirement of MTS
Sub-Total (Hardware) -Form -4
Test Equipments for FRTU
FRTU Database Configuration & Maintenance Software tool
Master Station cum FRTU Simulator & Protocol analyser software tool
Laptop PC for above software tools along with interfacing hardware including Hub
Sub-Total (Test equipment) Form-4
MANDATORY SPARES FOR FRTU
5% of Hardware(F1)
Form 5: MPLS/4G(G1)
Annual Network Connectivity Charges for min10 Mbps Links with RTUs
Annual Network Connectivity Charges for min 16 Mbps Aggregate Links at CC
Annual Network Connectivity Charges for min 2 Mbps Internet Links at CC
MPLS Router
Any other hardware to meet functional /performance requirement of MTS
Sub - Total (G1)
GPRS(G2)(4G)
Annual Network Connectivity Charges for min 64kbps 4G/5Gdata for FRTUs /FPI
Modems
Any other hardware to meet functional /performance requirement of MTS
Sub - Total (G2)
Mandatory spares 5% of G1,G2
Form 6: UPS/DCPS(AUX POWER SUPPLY)
Main Equipments - Control centre(H1)
UPS with suitable rating running in parallel redundant mode
VRLA type Battery banks for above UPS for minimum 30 min. backup duration
Sub- Total (H1)
For RTU / Data Concentrator / Communication Eqpts.(H2)
DC Power Supply (DCPS) system based on SMPS
Battery bank for above DCPS (VRLA Type) for minimum 4 hrs backup
Sub-Total H2
For FRTU(H3)
24/48 V DC Power Supply (DCPS) system based on SMPS
Battery bank for above DCPS (VRLA Type) for minimum 4 hrs backup
Sub-Total H3
Common For Both RMU and FRTU(H4)
Battery bank for above DCPS (VRLA Type) for minimum 4 hrs backup (at least 26 AH)
Remote VDU , LDMS location(H5)
UPS (2 kVA ) with VRLA Batteries to give 4 hrs back up
Mandatory Spares for UPS
5% of above H1TO H5
Form 7: RMU & Enablers
RMU (FRTU integrated)(way requirement)(J1)
RMU with Built in FRTU with racks, sub-racks, Power Supply modules with power backup , I/o modules, CPU,HDR,CMR,MFT, interfacing equipment, required converters & all other required items/accessories including complete wiring for all modules for locations
CTC(2CT)
ADD ON C
ADD ON T
Sub- Total J1
Communicable
Sub-Total J2
Mandatory Spares
5% of above J1 TO J2
Form 8:Training
Operator’s Training
Operator for SCADA/DMS Control Centre
Instructor for DTS
Maintenance Training
Computer Hardware & System Software
Application Software (SCADA/DMS)
RTU & FRTU
Database & display development
Auxiliary Power Supply
Communication System including NMS
Description of Work / Item(s)
Form 1:Project Management Cost
Installation, Testing and Commissioning Cost to Integrate Entire SCADA & IT (relevant to SCADA) Infrastructure
Integration with legacy applications & Data Migration
Training for the Employees
Form 2: SCADA/DMS Control Centre cost
Server/ workstation Hardware
SCADA Server
DMS Server
OMS Server
FEP server with interface switches
ISR server
NMS server
DTS server
Developmental server
Commnuication Server
Web/Directory server
SMS gateway
Workstation with dual TFT Monitors (S/S monitoring)
Workstation with dual TFT Monitors (Network monitoring)
Remote VDUs with one TFT Monitors
Developmental console with one TFT
DTS/Workstation Console with dual TFTs
Video Projection system with 2x3 Module configuration with each module at least 60" diagonal with projector
Storage & Backup Devices
External RAID Mass storage device (for 24 months online backup)
External DAT drive
Switches
Layer II switch (SCADA/DMS LAN)
Layer II switch ( Planning & Development system LAN)
Routers
Router for interfacing IT system & SCADA/DMS DR centre
Router at remote VDU
Security system (DMZ)
Web server with load balancing
Mail server
Router
Firewall & network IDS/IPS
Layer II switch
Other Active Devices
GPS Time synchronisation system
Time, day & date digital displays
Printers
Color inkjet printer
B/W Laser printer
Any other items required to meet functional /Performance requirement as per MTS
Sub-Total form -2 (Hardware)
Software for Control Centre
SCADA software
ISR Software
DMS software
OMS Software
DTS software
Developmental software
Network Management Software
WEB /Network security software (INCL IN WEBSERVER)
RDBMS package (incl in ISR)
GIS Adaptor/Engine for importing data from GIS system under IT system
Any other software to meet functional /performance requirement of MTS
Sub-Total form-2(Software)
Mandatory spares Max 5% of form-2 Hardware
Mandatory spares
Form 3: RTU
RTUs(E1)
RTU base equipment comprising panels, racks, sub-racks, Power Supply modules, CPU, interfacing equipment, required converters & all other required items/accessories including complete wiring for all modules for locations mentioned
Multifunction transducers
Contact Multiplying Relays (CMRs)
Heavy duty relays for Control
Dummy Breaker Latching Relays
Transformer Transducers
Single TFT PC for LDMS with 2KVA UPS & VRLA Batteries to give 4hrs backup.
Any other hardware to meet functional /performance requirement of MTS
Sub - Total (Hardware) -Form 3
Software for LDMS
LDMS software
Any other software to meet functional /performance requirement of MTS
Sub - Total (Software) -Form 3
TEST EQUIPMENTS for RTU
RTU Database Configuration & Maintenance Software tool
Master Station cum RTU Simulator & Protocol analyser software tool
Laptop PC for above software tools along with interfacing hardware including Hub
Sub - Total (test equipment) -Form 3
MANDATORY SPARES FOR RTU
5% of hardware(E1)
Form 4: FRTU
Built in FRTUs(F1)
Mini pole mounted FRTU base equipment along with enclosure suitable to work in open environment (Adequate protection from water & dust) , racks, sub-racks, Power Supply modules with power backup , I/o modules, CPU, interfacing equipment, required converters & all other required items/accessories including complete wiring for all modules for locations mentioned
Contact Multiplying Relays (CMRs)(may be supplied if required in future)
Heavy duty relays for Control(may be supplied if required in future)
Multifunction transducer(may be supplied if required in future)
Any other hardware to meet functional /performance requirement of MTS
Sub-Total (Hardware) -Form -4
Test Equipments for FRTU
FRTU Database Configuration & Maintenance Software tool
Master Station cum FRTU Simulator & Protocol analyser software tool
Laptop PC for above software tools along with interfacing hardware including Hub
Sub-Total (Test equipment) Form-4
MANDATORY SPARES FOR FRTU
5% of Hardware(F1)
Form 5: MPLS/4G(G1)
Annual Network Connectivity charges for min10Mbps Links with RTUs
Annual Network Connectivity charges for min 16 Mbps Aggregate Links at CC
Annual Network Connectivity charges for min 2 Mbps Internet Links at CC
MPLS Router
Any other hardware to meet functional /performance requirement of MTS
Sub - Total (G1)
GPRS(G2)(4G)
Annual Network Connectivity charges for min 64kbps 4G/5Gdata for FRTUs /FPI
Modems
Any other hardware to meet functional /performance requirement of MTS
Sub - Total (G2)
Mandatory spares 5% of G1,G2
Form 6: UPS/DCPS(AUX POWER SUPPLY)
Main Equipments - Control centre(H1)
UPS with suitable rating running in parallel redundant mode
VRLA type Battery banks for above UPS for minimum 30 min. backup duration
Sub- Total (H1)
For RTU / Data Concentrator / Communication Eqpts.(H2)
DC Power Supply (DCPS) system based on SMPS
Battery bank for above DCPS (VRLA Type) for minimum 4 hrs backup
Sub-Total H2
For FRTU(H3)
24/48 V DC Power Supply (DCPS) system based on SMPS
Common For Both RMU and FRTU(H4)
Battery bank for above DCPS (VRLA Type) for minimum 4 hrs backup (at least 26 AH)
Remote VDU , LDMS location(H5)
UPS (2 kVA ) with VRLA Batteries to give 4 hrs back up
Mandatory Spares for UPS
5% of above H1TO H5
Form 7: RMU & Enablers
RMU (FRTU integrated)(way requirement)(J1)
RMU with Built in FRTU with racks, sub-racks, Power Supply modules with power backup , I/o modules, CPU, HDR,CMR.MFT,interfacing equipment, required converters & all other required items/accessories including complete wiring for all modules for locations
CTC(2CT)
Sub- Total J1
Communicable
Sub-Total J2
Mandatory Spares
5% of above J1 TO J2
Form 8:Training
Operator’s Training
Operator for SCADA/DMS Control Centre
Instructor for DTS
Maintenance Training
Computer Hardware & System Software
Application Software (SCADA/DMS)
RTU & FRTU
Database & display development
Auxiliary Power Supply
Communication System including NMS
Description of Work / Item(s)
Form 10:FMS(SCADA/DMS-KOLLAM)
FMS charges for SCADA/DMS system (maintaining overall system availability as per TS)
FMS charges for SCADA/DMS system (maintaining availability individual hardware & software application as per TS)
Form 10:FMS(SCADA/DMS-THRISSUR+TCED)
FMS charges for SCADA/DMS system (maintaining overall system availability as per TS)
FMS charges for SCADA/DMS system (maintaining availability individual hardware & software application as per TS)
Form 10:FMS(SCADA/DMS-KANNUR)
FMS charges for SCADA/DMS system (maintaining overall system availability as per TS)
FMS charges for SCADA/DMS system (maintaining availability individual hardware & software application as per TS)
Form 10:FMS(SCADA/DMS-ERNAKULAM-DRR)
FMS charges for SCADA/DMS system (maintaining overall system availability as per TS)
FMS charges for SCADA/DMS system (maintaining availability individual hardware & software application as per TS)
Description of Work / Item(s)
Form 11:GRAND TOTAL(All towns)
Total Amount of BOQ 1(SCADA/DMS-KOLLAM)
Total Amount of BOQ 2(SCADA/DMS-THRISSUR)
Total Amount of BOQ 3(SCADA/DMS-KANNUR)
Total FMS charges of BOQ 4(FMS Charges of all towns)
Description of Work / Item(s)
Form 1:Project Management Cost
Installation, Testing and Commissioning Cost to Integrate Entire SCADA & IT (relevant to SCADA) Infrastructure
Integration with legacy applications & Data Migration
Training for the Employees
Form 2: SCADA/DMS Control Centre cost
Server/ workstation Hardware
SCADA Server
DMS Server
OMS Server
FEP server with interface switches
ISR server
NMS server
DTS server
Developmental server
Commnuication Server
Web/Directory server
SMS gateway
Workstation with dual TFT Monitors (S/S monitoring)
Workstation with dual TFT Monitors (Network monitoring)
Remote VDUs with one TFT Monitors
Developmental console with one TFT
DTS/Workstation Console with dual TFTs
Video Projection system with 2x3 Module configuration with each module at least 60" diagonal with projector
Storage & Backup Devices
External RAID Mass storage device (for 24 months online backup)
External DAT drive
Switches
Layer II switch (SCADA/DMS LAN)
Layer II switch ( Planning & Development system LAN)
Routers
Router for interfacing IT system & SCADA/DMS DR centre
Router at remote VDU
Security system (DMZ)
Web server with load balancing
Mail server
Router
Firewall & network IDS/IPS
Layer II switch
Other Active Devices
GPS Time synchronisation system
Time, day & date digital displays
Printers
Color inkjet printer
B/W Laser printer
Any other items required to meet functional /Performance requirement as per MTS
Sub-Total form -2 (Hardware)
Software for Control Centre
SCADA software
ISR Software
DMS software
OMS Software
DTS software
Developmental software
Network Management Software
WEB /Network security software (INCL IN WEBSERVER)
RDBMS package (incl in ISR)
GIS Adaptor/Engine for importing data from GIS system under IT system
Any other software to meet functional /performance requirement of MTS
Sub-Total form-2(Software)
Mandatory spares Max 5% of form-2 Hardware
Mandatory spares
Form 3: SCADA/ Disaster Replica Recovery Control Cost
Server/ workstation Hardware
SCADA/DRR Server
DMS Server
OMS Server
FEP server with interface switches
ISR server
NMS server
DTS server
Other Active Devices
Developmental server
Commnuication Server
Web/Directory server
SMS gateway
Workstation with dual TFT Monitors (S/S monitoring)
Workstation with dual TFT Monitors (Network monitoring)
Developmental console with one TFT
DTS/Workstation Console with dual TFTs
Video Projection system with 2x3 Module configuration with each module at least 60" diagonal with projector
Storage & Backup Devices
External RAID Mass storage device (for 24 months online backup)
External DAT drive
Switches
Layer II switch (SCADA/DMS LAN & DR LAN)
Layer II switch ( Planning & Development system LAN)
Routers
Router for interfacing IT system & SCADA/DMS DR centre
Security system (DMZ)
Web server with load balancing
Mail server
Router
Firewall & network IPS/IDS
Layer II switch
Other Active Devices
GPS Time synchronisation system
Time, day & date digital displays
Printers
Color inkjet printer
B/W Laser printer
Any other items required to meet functional /Performance requirement as per MTS
Sub -Total Form-3 (hardware)
Software(DRR Centre)
SCADA software
ISR Software
DMS software
DTS software
OMS Software
Developmental software
Network Management Software
RDBMS package
WEB /Network security software
GIS Adaptor/Engine for importing data from GIS system under IT system
Any other items required to meet functional /Performance requirement as per MTS
Sub-Total(Form-3 Software)
Mandatory spares Max 5% of form-3 Hardware
Mandatory spares
Form 4: RTU
RTUs(E1)
RTU base equipment comprising panels, racks, sub-racks, Power Supply modules, CPU, interfacing equipment, required converters & all other required items/accessories including complete wiring for all modules for locations mentioned
Multifunction transducers
Contact Multiplying Relays (CMRs)
Heavy duty relays for Control
Dummy Breaker Latching Relays
Transformer Transducers
Single TFT PC for LDMS with 2KVA UPS & VRLA Batteries to give 4hrs backup.
Any other hardware to meet functional /performance requirement of MTS
Sub - Total (Hardware) -Form 4
Software for LDMS
LDMS software
Any other software to meet functional /performance requirement of MTS
Sub - Total (Software) -Form 4
TEST EQUIPMENTS for RTU
RTU Database Configuration & Maintenance Software tool
Master Station cum RTU Simulator & Protocol analyser software tool
Laptop PC for above software tools along with interfacing hardware including Hub
Sub - Total (test equipment) -Form 4
MANDATORY SPARES FOR RTU
5% of hardware(E1)
Form 5: FRTU
FRTUs(F1)
Mini pole mounted FRTU base equipment along with enclosure suitable to work in open environment (Adequate protection from water & dust) , racks, sub-racks, Power Supply modules with power backup , I/o modules, CPU, interfacing equipment, required converters & all other required items/accessories including complete wiring for all modules for locations mentioned
Contact Multiplying Relays (CMRs)
Heavy duty relays for Control
Multifunction transducer
Any other hardware to meet functional /performance requirement of MTS
Sub-Total (Hardware) -Form -5
Test Equipments for FRTU
FRTU Database Configuration & Maintenance Software tool
Master Station cum FRTU Simulator & Protocol analyser software tool
Laptop PC for above software tools along with interfacing hardware including Hub
Sub-Total (Test equipment) Form-5
MANDATORY SPARES FOR FRTU
5% of Hardware(F1)
Form 6: MPLS/4G(G1)
Annual Network Connectivity charges for min10Mbps Links with RTUs
Annual Network Connectivity charges for min 16 Mbps Aggregate Links at CC
Annual Network Connectivity charges for min 50 Mbps Aggregate Links at DRR
Annual Network Connectivity charges for min 2 Mbps Internet Links at CC
Annual Network Connectivity charges for min 2 Mbps Internet Links at DRR
MPLS Router
Any other hardware to meet functional /performance requirement of MTS
Sub - Total (G1)
GPRS(G2)(4G)
Annual Network Connectivity charges for min 64kbps 4G/5Gdata for FRTUs /FPI
Modems
Any other hardware to meet functional /performance requirement of MTS
Sub - Total (G2)
Mandatory spares 5% of G1,G2
Form 7: UPS/DCPS(AUX POWER SUPPLY)
Main Equipments - Control centre(H1)
UPS with suitable rating running in parallel redundant mode
VRLA type Battery banks for above UPS for minimum 30 min. backup duration
Sub- Total (H1)
Main Equipments - DR Centre
Main Equipments(H2)
UPS with suitable rating running in parallel redundant mode
VRLA type Battery banks for above UPS for minimum 30 min. backup duration
Sub-Total H2
For RTU / Data Concentrator / Communication Eqpts.(H3)
DC Power Supply (DCPS) system based on SMPS
Battery bank for above DCPS (VRLA Type) for minimum 4 hrs backup
Sub-Total H3
For FRTU(H4)
24/48 V DC Power Supply (DCPS) system based on SMPS
Battery bank for above DCPS (VRLA Type) for minimum 4 hrs backup
Sub-Total H4
Common For Both RMU and FRTU(H5)
Battery bank for above DCPS (VRLA Type) for minimum 4 hrs backup (at least 26AH)
Remote VDU , LDMS location(H6)
UPS (2 kVA ) with VRLA Batteries to give 4 hrs back up
Sub-Total H6
Mandatory Spares for UPS
5% of above H1TO H6
Form 8: RMU & Enablers
RMU (FRTU integrated)(way requirement)(J1)
RMU with Built in FRTU with racks, sub-racks, Power Supply modules with power backup , I/o modules, CPU, HDR,CMR,MFT, interfacing equipment, required converters & all other required items/accessories including complete wiring for all modules for locations
CTC(2CT)
ADD ON C
ADD ON T
Sub- Total J1
Communicable
Mandatory Spares
5% of above J1 TO J2
Form 9:Training
Operator’s Training
Operator for SCADA/DMS Control Centre
Instructor for DTS
Maintenance Training
Computer Hardware & System Software
Application Software (SCADA/DMS)
RTU & FRTU
Database & display development
Auxiliary Power Supply
Communication System including NMS
Form 10:FMS(PACKAGE COST)
FMS charges for SCADA system (maintaining overall system availability as per TS)
FMS charges for SCADA/DMS system (maintaining availability individual hardware & software application as per TS)
Description of Work / Item(s)
Form 11 : RTU BREAKUP(SPLIT UP OF RTU ITEMS)
Power supply module
CPU Module
Communication module (Specify no of Ethernet and serial ports
Digital Input (DI) Module (Specify no of channels
Digital Output (DO) Module (Specify no of channels
Analog input if any (AI) Module (Specify no of channels
Any other hardware to meet functional /performance requirement of MTS
Description of Work / Item(s)
Form12 : FRTU BREAKUP(SPLIT UP OF FRTU ITEMS)
FRTUs
Power supply module
CPU Module
Communication module (Specify no of Ethernet and serial ports
Digital Input (DI) Module (Specify no of channels
Digital Output (DO) Module (Specify no of channels
Analog input if any (AI) Module (Specify no of channels
Any other hardware to meet functional /performance requirement of MTS
HKRP INNOVATIONS LIMITED (BID ID -2231152)
Deepak Chourasiya (BID ID -2231808)
Megawin Switchgear Private Limited (BID ID -2225132)
RAILTEL CORPORATION OF INDIA LIMITED (BID ID -2230765)
L & T Technology Services Limited (BID ID -2229012)
RPP INFRA PROJECTS LIMITED (BID ID -2231773)
HKRP INNOVATIONS LIMITED (BID ID -2231152)
Megawin Switchgear Private Limited (BID ID -2225132)
Deepak Chourasiya (BID ID -2231808)
L & T Technology Services Limited (BID ID -2229012)
RAILTEL CORPORATION OF INDIA LIMITED (BID ID -2230765)
RPP INFRA PROJECTS LIMITED (BID ID -2231773)
HKRP INNOVATIONS LIMITED (BID ID -2231152)
Deepak Chourasiya (BID ID -2231808)
Megawin Switchgear Private Limited (BID ID -2225132)
RAILTEL CORPORATION OF INDIA LIMITED (BID ID -2230765)
L & T Technology Services Limited (BID ID -2229012)
RPP INFRA PROJECTS LIMITED (BID ID -2231773)
Anvil Energy Private Limited (BID ID -2230466)
RPP INFRA PROJECTS LIMITED (BID ID -2231773)
HKRP INNOVATIONS LIMITED (BID ID -2231152)
Megawin Switchgear Private Limited (BID ID -2225132)
Deepak Chourasiya (BID ID -2231808)
L & T Technology Services Limited (BID ID -2229012)
HKRP INNOVATIONS LIMITED (BID ID -2231152)
RAILTEL CORPORATION OF INDIA LIMITED (BID ID -2230765)
Megawin Switchgear Private Limited (BID ID -2225132)
Deepak Chourasiya (BID ID -2231808)
L & T Technology Services Limited (BID ID -2229012)
RPP INFRA PROJECTS LIMITED (BID ID -2231773)
HKRP INNOVATIONS LIMITED (BID ID -2231152)
RAILTEL CORPORATION OF INDIA LIMITED (BID ID -2230765)
Megawin Switchgear Private Limited (BID ID -2225132)
Deepak Chourasiya (BID ID -2231808)
L & T Technology Services Limited (BID ID -2229012)
RPP INFRA PROJECTS LIMITED (BID ID -2231773)
RAILTEL CORPORATION OF INDIA LIMITED (BID ID -2230765)
L & T Technology Services Limited (BID ID -2229012)
Deepak Chourasiya (BID ID -2231808)
Megawin Switchgear Private Limited (BID ID -2225132)
Anvil Energy Private Limited (BID ID -2230466)
HKRP INNOVATIONS LIMITED (BID ID -2231152)
RAILTEL CORPORATION OF INDIA LIMITED (BID ID -2230765)
L & T Technology Services Limited (BID ID -2229012)
HKRP INNOVATIONS LIMITED (BID ID -2231152)
Deepak Chourasiya (BID ID -2231808)
Megawin Switchgear Private Limited (BID ID -2225132)
Anvil Energy Private Limited (BID ID -2230466)
Bidder Name
Anvil Energy Private Limited
Deepak Chourasiya
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ.xls
BOQ • 0.92 MB
Tenderdocument.pdf
Tender Documents • 26.03 MB
Download all tender documents and submit your bid