Loading…
Loading…
Tender Value
₹25.0 L
EMD Value
₹74,924
Closing Date
29 May 2026, 6:00 pmClosed
CHIEF ENGINEER (G)
Providing & fabricating the trench cover for trenches of unit 3, 4 & 5 at GTPS
300703
EW-279
Open
Miscellaneous Works
Works
Gandhinagar
2 documents required · 2 mandatory
₹1,770
Gujarat State Electricity Corporation Limited Payable at Gandhinagar
₹74,924
7 May 2026
7 May 2026
7 May 2026
29 May 2026
7 May 2026
1. SECTION-A:
ACKNOWLEDGEMENT OF TENDER FEE /EMD.
TENDER NOTICE.
2. SECTION-B:
DECLARATION FORM CUM UNDER TAKING TO
BE SIGNED BY BIDDER
RTGS DETAILS OF BIDDER
PROJECT SYNOPSIS
SCOPE OF WORK AND SITE CONDITION
SPECIAL NOTE FOR PRE-QUALIFICATION
GENERAL INSTRUCTION TO THE TENDERER
3. SECTION-C:
GENERAL CONDITIONS OF CONTRACT
4. SECTION-D:
TERMS AND CONTRACT FOR WORKS
GENERAL SAFETY RULES & LIST OF SAFETY
5. SECTION-E :
PERFORMA FOR BANK GUARANTEE
INTEGRITY PACT
CERTIFICATE – A
ANNEXURE – I (DETAILS OF BANK FOR
SOLVEANCY & BG)
6. SECTION-F:
SPECIAL CONDITIONS FOR USE OF CEMENT
APPROVED NAME OF MANUFACTURERS OF
STEEL / CEMENT
GENERAL GUIDELINES RELEVANT TO I.S.
7. SECTION-G:
GENERAL SPECIFICATIONS
TECHNICAL SPECIFICATION
DETAIL SPECIFICATION
8. SECTION-H:
SCHEDULE-B
Safe Maintenance Procedure
EW- 279 PUR-F-006 RFQ-76356
ACKNOWLEDGEMENT OF TENDER FEE
TENDER NOTICE
EW- 279 PUR-F-006 RFQ-76356
GUJARAT STATE ELECTRICITY CORPORATION LIMITED
Gandhinagar Thermal Power Station, Gandhinagar, India–382041.
Ph. 91-79-23215663Fax: 91-79-23217673, e-mail:
[email protected] Website: www.gsecl.in
CIN:U40100GJ1993SGCO19988
ACKNOWLEDGMENT
e- Tender for the
“Providing & fabricating the trench cover for trenches of unit 3, 4 & 5 at
TENDER FEE PAID VIDE DEMAND DRAFT NO. _________________________________
DATED___________________________ RS. __________________________________
EARNEST MONEY DEPOSIT PAID VIDE D.D. NO. _______________________________
DATED ____________________ RS. _____________________
1. The undersigned reserves the right to reject any or all tenders without
assigning any reasons thereof.
2. The Tender fee will be accepted in form of Demand Draft and Earnest Money
Deposit will be accepted in form of Demand Draft or Bank Guarantee of any
bank as prescribe in ANNEXURE- I drawn in favour of “GUJARAT STATE
ELECTRICITY CORPORATION LTD.” payable at Gandhinagar TPS
For & On behalf of GSECL
CHIEF ENGINEER (Gen)
SIGNATURE OF CONTRACTOR GSECL: GTPS
EW- 279 PUR-F-006 RFQ-76356
GUJARAT STATE ELECTRICITY CORPORATION LIMITED
Gandhinagar Thermal Power Station, Gandhinagar, India–382041.
Ph. 91-79-23215663Fax: 91-79-23217673, e-mail:
[email protected] Website: www.gsecl.in
CIN:U40100GJ1993SGCO19988
CE [Generation], Gandhinagar, TPS invites “On-line Tenders” (e-tendering) for the work of
“Providing & fabricating the trench cover for trenches of unit 3, 4 & 5 at GTPS”.
Tender Papers & Specifications may be down loaded from Web site
https://gsecl.nprocure.com(For view, down load and on line submission) and GUVNL /
GSECL web sites www.gsecl.in (For view only).All tender documents are to be upload (Notarized
/ self-attested copies of original – as specified in tender document) through online only
(mandatory) on (n) procure portal excluding Tender fee and EMD Tender fee and EMD are to be
submitted physically by Registered Post A.D. or Speed Post addressed to: CHIEF ENGINEER
(GENERATION), GUJARAT STATE ELECTRICITY CORPORATION LTD, THERMAL POWER
STATION, GANDHINAGAR-382041, GUJARAT. “NO COURIER SERVICE OR HAND DELIVERY”
will be accepted.
Tender Estimated E.M.D.
No. Cost Rs.
EW- “Providing & 06 (Six) Rs. 1500+ Rs.
279 fabricating Months from 270 = Rs.
the trench the date of 1770.00/- (Seventy Four
cover for Rs. written order
trenches of 24,97,452.20 to commence
Seven Nine Hundred
unit 3, 4 & 5 the work. hundred Twenty Four
at GTPS”. Seventy Only )
Refundable)
180 Days [From the opening of
1 Validity of Tender
Technical Bid].
Last Date for Online tender / offer submission through
2 As per Tender Notice
(n)Procure only up to 18:00 Hrs(This is Mandatory)
Last Date for physical receipt of cover for DD / Bank
Guarantee / Online payment reference for Tender Fee and
3 As per Tender Notice
EMD only up to 15:00 Hrs Through RPAD or Speed Post
Date of opening of online Technical Bid, all relevant
documents submitted through online process, Cover for
4 Tender fee and EMD at 15:30 Hrs (Online technical bid As per Tender Notice
will be opened for Bidders who have submitted Cover for
Tender Fee and EMD)
Tentative date of on-line opening of price bid (if possible) Party has to be in touch with
at 15.30 hrs. website www.nprocure.com and
also with e-mail sent by above
For & On behalf of GSECL
CHIEF ENGINEER (Gen)
SIGNATURE OF CONTRACTOR GSECL: GTPS
EW- 279 PUR-F-006 RFQ-76356
1) Only following listed documents must be upload in n-process online only. No physical documents
are to be submitted except tender fee and EMD cover. Price Bid shall not be submitted in Hard
1. Demand Draft for Tender Fee and EMD (Original) cover only to submit through RPAD/Speed post
2. The bidder shall have a separate Provident Fund Code of RPFC in the name of company. The
bidder, who does not possess such separate P.F. code, shall not be considered for acceptance of
tender. The contractor has to submit attested copy of such certificate showing P.F. code along with
the tender.
3. Attested copy of PAN No.
4. Attested copy of work experience certificate for the similar works executed.
5. List of work in progress.
6. Attested copy of firm registration [Applicable only to the firms registered under Company Law]
7. Attested copy of partnership deed. [Applicable only to the partnership firms.]
8. Attested copy of power of attorney, if any, for signing the bid document.
9. Attested copy of balance sheet of profit & Loss account duly audited by Chartered Accountant of at
least 3 financial years, if work estimate is more than Rs. 50 Lacks.
10. Details of equipment, tools and plants immediately available with the tenderer for use of this work.
11. Details of technical personnel.
12. Undertaking duly Notarized as per attached Declaration Form
13. Any other documents required to verify technical, financial capability of the bidders & other
Credentials
15. Attached The Copy Of GST Registration.
All such documents should be strictly uploaded in N-procure only expect Tender Fee and EMD
details cover. Otherwise the offer will not be considered and no any further communication in the
matter will be entertained.
2) In case any deviation is found in Data / Details / Documents uploaded on N-procure online offer
(e-tendering) documents then such tender will not be considered and no any further
communication in the matter will be entertained. Tenders must be un-conditional. Conditional
Tenders will be rejected.
3) Further bidders are requested to submit Technical Bid documents and price – bid i.e. Schedule-B
on line only and not to submit the Technical bid and price bid in physical form expect Tender Fee
and EMD details cover. This is mandatory. If Technical bid document and price bid is submitted in
physical form expect Tender Fee and EMD details cover, same will not be opened and only on-line
Uploaded/submitted Technical bid document and price will be considered for evaluation. The
bidder is requested not to upload/submit the by online (n)procure while bid submission on in
(n)procure tender document, condition of the contract, specification & other relevant
documents, except documents as stated here above. Instead of the same, the bidder shall
upload on (n) procure scan copy of the duly Notarized Undertaking as stated below declaration
form on the stamp paper of Rs. 300/-. However, bidder may download tender document &
preserve with them in Hard Copy for their future reference. Later on, L1 bidder shall be
asked to collect the tender documents from the tender inviting authorities for the purpose
of contract agreement execution and place their signature with seal of the company.
4) It is mandatory for all the bidders to submit their tender documents viz. on-line (e-tendering) and
uploading on (n) procure in scheduled time. Tender documents submitted in physical form will not
be accepted and considered expect Tender Fee and EMD details cover. Also, all bidders shall
submit required Physical documents as stated in Tender Notice
5) GSECL reserves the rights to reject any OR all tenders without assigning any reasons thereof.
6) Tender Notice Number & name of the work shall be clearly written on the covers of containing the
Tender Fee and EMD.
7) Technical / Price Bids will be opened on the day and time indicated in the tender notice by an
Officer nominated by the Purchaser in the presence of such of the bidders who wish to be present.
Any technical questions, information and clarifications that may be required pertaining to this
tender should be referred to the CHIEF ENGINEER (GEN.) Gandhinagar TPS. Also during pre-bid
meeting (if arranged) the same may please be discussed.
The exemption in payment of Tender Fee & EMD shall be given to the,
1. Micro & small-scale enterprises which participate directly in tendering process
for the product which they are manufacturing / service which they are
providing and have Udyam registration for items / service under procurement.
2. Start-ups which participate directly in tendering process for the product which
they are manufacturing/service which they are providing and re-cognized by
EW- 279 PUR-F-006 RFQ-76356
DPIIT under the Start-up India Program and has obtained Udyam registration.
3. Organization which has registration certificate for the manufacturing product of
the tender, from Gujarat Khadi Gramodyog Board or Khadi and Village
Industries Commission(K.V.I.C)or Commissioner of Cottage Industries.
4. Board/Corporations/PSUs of the Central/State Government for their own
manufactured items.
5. State Government recognized organizations like(i) organizations for blinds,
dumb and deaf, disabled, mentally disabled persons;(ii)women's self-help group
recognized by Gujarat Livelihood Promotion Company; which participate
directly in tendering process for the product which they are manufacturing /
service which /they are providing.
1. Micro & Small Enterprises (MSEs) who participates directly in the tendering
process as Manufacturers or Service Providers, and holds a valid Udyam
Registration, are eligible for exemption from payment of Earnest Money Deposit
2. Agencies registered under Udyam in the capacity of Traders, Re-sellers, or
similar categories (i.e. other than Manufacturers/Service Providers) are not
eligible for EMD exemption.
3. Migration period for Reclassification of MSMEs: - ln case of an upward change
in terms of investment in plant and machinery or equipment or turnover or
both, and consequent re-classification, an enterprise shall continue to avail of
all non-tax benefits of the category (micro or small or medium) it was in before
the re-classification, for a period of three years from the date of such upward
For & On behalf of GSECL
CHIEF ENGINEER (Gen)
SIGNATURE OF CONTRACTOR GSECL: GTPS
EW- 279 PUR-F-006 RFQ-76356
DECLARATION FORM CUM UNDER TAKING
TO BE SIGNED BY BIDDER
RTGS DETAILS OF BIDDER
PROJECT SYNOPSIS
SCOPE OF WORK AND SITE CONDITION
SPECIAL NOTE FOR PRE-QUALIFICATION
GENERAL INSTRUCTION TO THE BIDDER
EW- 279 PUR-F-006 RFQ-76356
(To be uploaded on (n) procure online process duly notarized on Rs. 300/- Non
– Judicial Stamp Paper)
DECLARATION FORM
5 at GTPS”.
Tender No/ RFQ No:
1. I/We hereby declare that I/We have carefully studied the entire tender placed
on the WEB site and conditions of contract, specifications and other documents
of this work mentioned in the tender and abide by the same. Also, I/We hereby
agree to execute the same accordingly.
2. I/We hereby abide to execute the contract agreement by downloading the copies
of the conditions of contract, specifications and other documents of this work of
otherwise I/we will get copy of the same from the office of the tender inviting
authority and the same will be acceptable to me/us.
3. I/We hereby accept and confirm that any dispute on this regard shall not be
4. I/We hereby declare that I/We have visited the work site and fully acquainted
myself/ourselves with the local situations regarding materials, labour and other
factors pertaining to the work before submitting the tender.
5. I/We hereby confirm that our offer is Un-conditional and without any technical
& commercial deviations.
6. Should this tender be accepted, I /We hereby agree to abide by to fulfill all the
terms-conditions and provision of the Tender and Contract for Works as
applicable and default thereof, to forfeit and to pay to the Gujarat State
Electricity Corporation Limited the sums of money due.
7. The full value of the “Earnest Money Deposit” paid herewith should be
absolutely forfeited to the Corporation, should I/ we do not execute / commence
the work after issuance of date of commencement by GSECL.
EW- 279 PUR-F-006 RFQ-76356
8. If, I fail to submit all required documents with application or tender copy ( in
each tender ) then my tender will be cancelled, which is binding to me.
9. If, full or part work will be given to me, it will be accepted to me with same
terms, rate & conditions.
10. I, ______ proprietor / owner / partner / Authorized Agent of M/s. ______ do
hereby also declare and undertake as under:
a) That in capacity of independent contractor for M/s. ______ (Sub-
Contractor of M/s. ______ ) worked as contractor at GSECL,
___________Thermal Power Station for the nature of work of ______ against work
Order No. ______ Dt. ______., I have complied with the provisions of all laws as
applicable. I have paid the wages for the month/s of my contractual period
which is / are not less than the minimum rates as applicable, to all my
employee/s and no other dues are payable to my employee/s.
b) That I have covered all the eligible employee/s under the Employees‟
Provident Funds and Miscellaneous Provisions Act, 1952 and deposited the
contributions under my PF Code No. ______, place: ______ for the month/s of
my contractual period and as such no amount towards contribution whatever
is payable.
c) I further declare and undertake that in case any liability pertaining to
any of my worker, labour, employee/s is/are to be discharged by the principle
employer i.e. Gujarat State Electricity corporation Limited, ___________Thermal
Power Station due to my lapse, I undertake to reimburse the same or the
principle employer is authorized to deduct the same from my dues as payable.
d) I further declare and undertake the legal consequences which may arise
in future under the said work order awarded, and I bond myself to resolve the
same at the risk and cost of M/s. ______.
authorized signatory of M/s ______________________________________________
here by certify that M/s _________________________________________________ and
their proprietor / any partner / any directors of the firm is not stop deal and /
or banned for business dealing and / or black listed by GUVNL and / or their
any subsidiary company viz. GSECL / GETCO / DGVCL / MGVCL / UGVCL /
PGVCL as well as Government and / or Semi Government company /
department.
Seal & Signature of the Bidder
Phone / Mobile/ Fax No. & Company‟s Seal
EW- 279 PUR-F-006 RFQ-76356
e- Tender for the work of “Providing & fabricating the trench cover for trenches of
unit 3, 4 & 5 at GTPS”.
RTGS DETAIL OF BIDDER
Following RTGS details shall be submitted by agency along with the tender for direct
deposit of payment to the beneficiary account. Bidder has to submit the details as under:
1 Name of Bidder :-
2 Address for correspondence :-
3 E-Mail ID :-
4 Phone / Mobile No. :-
5 Name of Beneficiary :-
6 Bank Account Number of :-
beneficiary
7 Name of Bank of beneficiary :-
8 Name of Bank, branch & :-
9 Type of account :-
10 Bank Code :-
11 RTGS Code :-
12 IFSC Code :-
EW- 279 PUR-F-006 RFQ-76356
Project Synopsis and Data
1) Location :- Gandhinagar Thermal power station
2) Purchaser :- GUJARAT STATE ELECTRICITY
CORPORATION LTD
3) Engineer :- Chief Engineer(Gen)
4) Site of Project :- Gandhinagar,Gujarat State
5) Nearest town :- Gandhinagar
6) Nearest Railway Station :- Gandhinagar Capital(Ahmedabad is situated
at a distance of about 30.00Km)
7) Nearest Port :-
8) Nearest Air Port :- Ahmedabad-20Km(Approx)
9) Access Road :-
10) Site Elevation from MSL :- RL 81.5 M(floor level)
11) Meteorological Data
Ambient Air temperature
1] Highest monthly mean of daily :- 350 C
Max. Temperature
2] Maximum dry bulb :- 450 C
Temperature ( In 0C)
3] Minimum dry bulb :- 8.60 C
Temperature ( In 0C)
Rainfall
1] Average annual rainfall :- 1000 to 1200mm
2] For 01 hour ( In mm) :- 75 to 100mm
3] For 24 hour ( In mm) :- 250mm
Wind velocity
1] Maximum wind velocity :-
(In m/sec)
2] Wind direction – N,NE & SW :-
3] For 24 hour ( In mm) :-
Relative Humidity
1] Annual mean humidity ( In %) :- 50 to 60%
2] Maximum humidity (In %) :- 98%
3] Minimum humidity (In %) :- 2%
4] Type of Atmosphere :- Dry
12) DESIGN DATA
Seismic Data :-
Zone :- Zone-III as per IS 1893-1975
Intensity :-
EW- 279 PUR-F-006 RFQ-76356
Ambient temperature :-
Other Data :-
SCOPE OF WORK AND SITE CONDITIONS
The main scope of the work is “Providing & fabricating the trench cover for trenches of
unit 3, 4 & 5 at GTPS”.
Under the scope of this tender the agency has to carry out the subject work as per all
items of Schedule B and as per detail technical specifications items. The quantities taken
under individual items are very tentative. However, the agency has to carry out the
works as per the Company‟s requirements.
The agency has to carry out the works as per item & specifications of the tender by
providing all materials of best quality and of standard manufactures as the samples
approved by EIC and providing best workmanship through expert manpower.
The agency has to carry out the works as per the priority & schedule given by EIC time
to time even in on or off working hours of the office. The agency will take complete care
and will not damage any other structure in premises of company.
The agency has to carry out all the works by taking all due cares of safety, security
norms, with all risks including scaffolding, strutting, shoring, etc up to any height
irrespective of quantum of the work.
Contractor has to make arrangement for workable site condition with the co
operation of departments of company and agencies, all necessary arrangement
to get work permit is to be made by contractor. Day to day cleaning is required
after completion of job. The removed materials and any other unwanted
materials are to be transported and taken away as instructed by E.I.C.
All safety measures shall be taken by the contractor with his own cost.
The scope of work to be carried out by the Contractor shall also include Clearance of the
site, Disposal of debris, excavated material etc,
The major works involvement generally mentioned as per schedule-B.
All labour laws will be complied by the agency as per prevailing norms.
For & On behalf of GSECL
CHIEF ENGINEER (Gen)
SIGNATURE OF CONTRACTOR GSECL: GTPS
EW- 279 PUR-F-006 RFQ-76356
Registration in VMS System
Additional Note: Vendor gets to register in VMS System through vms.guvnl.com. For
registration following documents are required and mail to [email protected]
and [email protected]. After registration vendor have to upload the invoice in
the VMS system for smooth functioning of payment.
Documents required for Registration:
(1) PAN Copy
(2) GST Certificate Copy
(3) Email ID
(4) Full Name of Vendor
EW- 279 PUR-F-006 RFQ-76356
SPECIAL NOTE FOR PRE-QUALIFICATION
5 at GTPS”.
The tender documents are of two separate bids i.e. technical and price bids.
Bidder is requested to submit the technical bid with the following credentials for
post-qualification.
1. Bidder should produce evidence of having experience of successfully completed
of similar works as defined hereunder, carried out in Central & State
Government / Semi-Government / GSECL / GETCO / DGVCL / MGVCL /
UGVCL/PGVCL during the last seven years ending last day of the month
previous to the one in which tender is invited. Bidder should submit self-
attested copies of documentary evidence, preferably photo copies of work
completion certificate, certificate regarding works on hand progressing
satisfactorily along with certificate of amount of work done, work order with
Schedule-B, etc. from the respective department. The amount of work completed
works should be either of the following:-
a. Three similar completed works each costing not less than the amount equal to
b. Two similar completed works each costing not less than the amount equal to
c. One similar completed works each costing not less than the amount equal to
2. Similar work means General Civil Works /Fabrication work carried out in past
with documentary evidence.
3. Experience certificate of work executed with private firm shall not be accepted.
Experience as a joint venture or sub-contractor is not allowed and price bid of such
bidders will be rejected.
4. EMD: To pay EMD in form of DD OR in form of B.G. given by bank as
described in the Annexure – I.
5. Tender Fee: The tender fee shall be accompanied in the form of DD.
6. Separate employee‟s Provident Fund code number towards registration
of firm with Regional P.F. Commissioner.
7. Last three year Audited annual accounts, Positive net worth
certificate, and average annual turnover certificate certified by
chartered accountants as per qualification requirement.
Financial qualification criteria:
1. The Average Annual Turnover of the bidder shall not be less than
EW- 279 PUR-F-006 RFQ-76356
Rs. 7.49 Lakh/- during the preceding three (3) financial years as one date
of Techno-Commercial bid opening.
2. Net worth of bidder shall not be less than 100% of the bidder‟s paid up
share capital as on the last day of the preceding financial year. In case the
Bidder meets the requirement of Net worth based on the strength of its
Subsidiary (ies) and/or Holding company and/or Subsidiaries of its Holding
Companies wherever applicable, the Net worth of the Bidder and its
Subsidiary (ies) and/or Holding company and/or Subsidiary (ies) of the
Holding Company, in combined manner should not be less than 100% of
their total paid up share capital. However individually, their Net worth
should not be less than 75% of their respective paid share capitals.
Net worth in combined manner shall be calculated as follows:
Net worth (combined )= (x1+x2+X3)/(y1+y2+y3) X 100, where x1,x2, x3 are
individual net worth which shall not be less than 75 % of the respective
paid up share capitals and y1, y2, y3 are individual paid up share capitals.
3. In case the bidder is not able to furnish its audited financial statements
on stand-alone entity basis, the unaudited unconsolidated financial
statements of the bidder can be considered acceptable provided the bidder
further furnishes the following documents for substantiation of its
qualification.
Copies of the unaudited unconsolidated financial statements of the
bidder along with copies of the Audited consolidated financial statements
of its Holding Company.
A Certificate from the CEO/CFO of the Holding Company, stating that
the unaudited unconsolidated financial statements form part of the
Consolidated Annual Report of the company.
4. In cases where audited results for the last preceding financial year as on
the date of techno-commercial bid opening are not available, the financial
results certified by a practicing Chartered Accountant shall be considered
acceptable. In case, Bidder is not able to submit the Certificate from
practicing Chartered Accountant certifying its financial parameters, the
audited results of three consecutive financial years proceeding the last
financial year shall be considered for evaluating the financial parameters.
Further, a Certificate would be required from the CEO/CFO, stating that
the financial results of the Company are under audit as on the date of
Techno-commercial bid opening and the Certificate from the practicing
Chartered Accountant certifying the financial parameters is not available.
The bidder must submit Average Annual Turnover and Net worth Certificate
in support of Financial QR, duly certified and verified for authenticity from
Independent Statutory Auditor of their company / Practicing Charted
Accountant/ C.A. Firms / TPIA (Third-Party Inspection Agency ) empanelled /
approved by GSECL along with copy of Annual Audited Accounts of last three
EW- 279 PUR-F-006 RFQ-76356
8. Attested copy of relevant document duly signed and sealed on each and every
page shall be submitted.
9. Attach copy of GST Registration.
10. Details of orders for similar nature/jobs carried out along with documentary
Evidence, Performance Certificate and their organization set up for such work
executed in past there of indicating the Names of the organizations, order no and
11. Bidder shall have to submit the PAN card No for Income Tax with documentary proof.
12. Details of the partnership deed.
13. Details of Tools, tackles, equipments and personals available with firm relevant to the
job/subject matter.
14 Copy of the updated valid labor contract license from the appropriate authorities and
updated workman group insurance policy covering labor engaged.
15. The tenderer shall have to produce the document of last three years annual account,
i.e. profit & loss account and balance sheet, if the estimated cost of tender is more than
50 lakhs along with technical bid.
16. Details of skilled/semi-skilled persons presently employed by the contractor having
sufficient knowledge of similar jobs.
For & On behalf of GSECL
CHIEF ENGINEER (Gen)
GSECL: GTPS
SIGNATURE OF CONTRACTOR
EW- 279 PUR-F-006 RFQ-76356
GENERAL INSTRUCTIONS TO THE BIDDERS
1. SUBMISSIOIN OF TENDER
The tender should be uploaded/ submitted online on n-procure process.
Technical bid cover:- This cover shall contain all relevant attested qualifying documents as
prescribed in tender notice along with tender fee & EMD. Bidder shall have submit Tender
Fee and EMD cover only, All other require document to be upload on online (n)procure
process only
Note: - If attested copies of qualifying documents stated as prescribed in tender notice
are not found in on-line Technical bid, but same should be submitted by mail during
scrutiny will be treated as final to consider the bid for pre-qualification. Any missing
documents, if required will be asked from the bidder as mentioned in this tender
elsewhere. If party has not submitted tender in online is liable to be ignored.
Technical Bid
“Please note that the Notarized / self-attested copies of original required documents
should be invariably uploaded in n-procure portal before due date and time in pdf form
(Scanned copy). This is mandatory. No physical documents are required to be
submitted except tender fee and EMD.
Price bid:-
The price bid shall have to be submitted online only. The percentage rates and price shall be
written both in words, and figures and the units in words. In case of any ambiguity or
mistakes, the unit rates and prices written in words shall be considered as final.
Offered rate shall include cost of all Materials, wastage of material , Labours for all leads and
lifts, Supervision, setting out works, Machinery and equipment with its mobilization /
demobilization, transportation charges, Clearing of the site both prior to commencement and
after completion of work. Consumables such as, but not limited to petrol, oil, diesel,
lubricants, drill bits, pipes, ropes etc. Construction facilities such as scaffolding, tarpaulins,
wind break, etc., Overheads / profits of Contractor for due performance of the work under
this contract.
Applicability of goods and service tax:-
1) The tenders shall be evaluated on firm price and cost with GST and cess as applicable
unless otherwise mentioned in the tender documents.
2) IF the supplier/contractor have opted for the composition scheme of GST, the same must be
clearly specified with valid declaration and certificate from department. In the event of
withdrawal/ cessation of the supplier from composition scheme during the tenure of the
contract, the rate(i. e. price) mentioned in the price bid shall be final and any additional GST
will have to be borne by the tenderer himself, In no case additional amount towards GST or
otherwise will be paid/reimbursed to supplier/contractor.
3) The bidder shall have to inform their GST no. of the registered place(s) where from the bidder
intends to supply the goods/services, meaning there by the bidder has to supply the
goods/services from the relevant declared/ registered place(s) of supply only.
4) The bidder shall not include GST in their quoted rates; but the bidder has to separately
indicate the GST rate, amount in the price bid schedule.
5) In-case Govt notification comes for change in GST , the same will be applicable.
6) Bidder should indicate GST no.( copy of GST registration to be enclosed) and PAN NO. (copy
of PAN to be enclosed) Tenders submitted without GSTIN No by the firms, the offer will be
rejected without entering into further correspondence.
Further information required, if any, can be had from the office of the Chief Engineer,
GSECL, GTPS. But it must be clearly noted that the tenders must be received complete in
every respect by the due date and time.
i. The bidder must clearly quote rates in figure as well as in words. In case of any
EW- 279 PUR-F-006 RFQ-76356
discrepancy, whatever written in words shall prevail.
ii. No deviation in terms & conditions, Schedule-B and technical specifications will be
entertained. Any ignorance for this shall not relieve the contractor from his contractual
liability arising as per tender documents and conditions contained in it.
iii. The bidders are required to quote only firm prices. No variation will be accepted on price/
raw materials/ finished products or on any other cause.
iv. The bidders should note that the completion of above mentioned works in all respect in
accordance with the time limit given is very important and should be strictly adhered to.
The work is to be completed in time limit from the date of issue of written order to
commence the work by the Chief Engineer (Gen.), GSECL, Gandhinagar TPS.
v. The bids should be valid for a minimum period of 180 Days from the date of opening of
technical bid. During this period tenderer shall not be allowed to withdraw their tender and
if withdrawn, the Earnest Money Deposit submitted with the tender will be forfeited.
vi. The works covered under these specification shall be carried-out and governed by “Tender
and contract for Works” booklet appended herewith except where conditions specified in
this specifications.
vii. The successful bidder shall have to enter in to an agreement for contract as per G.S.E.C.L
rules on a stamp paper of Rs.300/- and necessary stamp duty charge shall be borne by the
contractor/consultant.
viii. The complete specification comprises of the following.
Bill of Quantities (Schedule-B), instructions to the bidders, Tender specifications and scope
of work, Tender and contract for Works booklet, General Conditions, Instructions to bidder
& Technical specifications. All these sections are complimentary to each other. The
particulars and requirements contained herein shall cover the execution of the works
covered under these specifications.
ix. The tenderer must visit the site of works and see for him self the site conditions regarding
availability of approach road during all seasons and other matters affecting the above works
before submitting the tender.
x. The submission of tender by a contractor implies that he has read these instructions the
conditions of contract etc. and has himself aware of the scope and specifications of the work
to be done and of conditions and local conditions and other factors bearings on the
execution of the works. GSECL will not therefore after acceptance of contractor's rate pay
any extra charge for any other reason; in case the contractor is found later on to have
misjudged the site condition.
xi. GSECL‟s authorized officers who accepts tender, shall have the right of rejecting all or any
of the tenders and will not be bound to accept the lowest offer nor to assign any reason
whatsoever for the rejection of any tender or all tenders.
xii. Bidders shall provide evidence of their continued eligibility to the satisfaction of the owner.
xiii. Bidders shall not be listed under a declaration of ineligibility for corrupt or fraudulent
Practices issued by the Govt., the list of black listed Contractors announced by GSECL
(erstwhile GEB) Govt. of Gujarat or its Public Sector undertakings or the contractors who
are under stop dealing in GUVNL and /or their any subsidiary company viz.
GETCO/MGVCL/UGVCL/PGVCL/DGVCL.
xiv.The bid, and in case of a successful bid, the Form of Contract Agreement, shall be signed
with the name of Firm / company which will be legally binding on all partners / parties.
xv.If the application is made by an individual, it shall be signed by the individual above his
full typed written name and current address.
xvi.If the application is made by a proprietary firm. It shall be signed by the proprietor above
his full typed written name and the full name of his firm with its current address.
xvii.If the application is made by a partnership firm, it shall be signed by all the partners of
the firm above their full type written names and current addresses or alternatively by
partner holding power of attorney for the firm in which case a certified copy of the power
of attorney shall accompany the application. A certified copy of the partnership deed, full
names and current addresses of all the partners of the firm shall also accompany the
application.
xviii. If the application is made by a limited company or a Corporation, it shall be signed by
the authorized person holding power of attorney for signing application in which case a
EW- 279 PUR-F-006 RFQ-76356
certified copy of the power of attorney shall accompany the application. Such
Limited company or Corporation may be required to furnish satisfactory evidence of its
existence before the pre-qualification evaluation. They should also furnish Articles of
Memorandum of Association. If the application is made by group of companies, it shall be
signed by the authorized person. The authority letter shall be accompanied with the
application.
1. SECURITY DEPOSIT
It should be mandatory to submit security deposit as per cl no.7 of Section C (i.e. General
condition of contract).
2. MAINTENANCE:
i] The contractor shall be responsible to make good and remedy at his own expense any
defect which may develop or may be noticed before the period mentioned hereunder from the
certified date of completion. The same shall be attended within 15 days of receipt of the
notice. In the case of failure on the part of the contractor, the Engineer-in-charge may rectify
or remove or re-execute the work at the risk & cost of the contractor. The Engineer-in-charge
shall be entitled to appropriate the whole or any part of the amount of security deposit
towards the expenses, if any, incurred by him in rectification, removal or re-execution. The
defects liability period shall be as under,
a) For all works costing up to Rs. 50,000 (amount put to tender), the period shall be
03 months from the certified date of completion.
b) For all works costing more than Rs. 50,000 and up to Rs. 1 crore (amount put to
tender), the period shall be 06 months from the certified date of completion OR one
monsoon, whichever is later.
c) For major projects costing more than Rs. 01 crore, the period shall be 12 months from
the certified date of completion which should include one monsoon.
d) For building works, the period specified in (a), (b) shall be same except that time
period shall be 12 months instead of 06 months OR (c) shall be same as above except that
time period shall be 03 years OR elapse of 3 monsoon periods from certified date of
completion whichever is later.
e) For original building works the defect liability period will be 03 years OR elapse of
monsoon periods following date of possession of building taken over by user agency OR
years or elapse of 04 monsoon period following the certified date of completion whichever is
For the purpose of deciding monsoon period, the 30th September may be treated as the last
f) For painting work (irrespective of amount put to tender): 1 year.
ii] For Water Proofing works guarantee period shall be kept as 5 (five) years from actual
date of completion. Besides above 5 years Performance bank Guarantee (PBG)
equivalent to 10% amount of estimate cost OR Work Order cost whichever is more
shall be submitted by the contractor prior to release of final bill payment.
Subsequently, if during the year (from date of completion of the work) no leakage is
observed in treated area, out of above 10% PBG, 2% amount shall be released each year to
the contractor on his written request.
In case of any leakages during the year is observed contractor must attend the same
during dry atmosphere but not later than 6 Months from date of intimation & subsequently
2% PBG can be released.
EW- 279 PUR-F-006 RFQ-76356
If contractor fails to attend the complaint, 2% PBG of respective year shall liable to
forfeit with written intimation to the contractor.
iii] Over and above 10% PBG, there shall be provision of 5% S.D. which shall be released
after 6 months from actual date of completion of work.
iv] For anti-termite treatment guarantee period shall be kept as 3 years, with PBG & shall be
released on completion of Guarantee period.
3. TIME LIMIT FOR WORK:
The scheduled time limit for the completion of work shall be 06 (Six) Months
calendar months from the date of issue of letter to commence the work. However
extension in time limit will be granted by GSECL for the genuine reasons only as per
terms of the contracts.
4. TERMS OF PAYMENTS:
Contractor shall be paid RA bill after observing GSECL‟s general procedure and
submission of bill by the agency. Also, 75% payment shall be made immediately
within a week period on receipt of recorded bill by Account Section without checking
of detail bill and compliance of queries & statutory requirement. However, remaining
balance 25% amount shall be released only after through checking of detail bill and
compliance of various quarries, statutory compliance etc. The above payment term is
applicable to all the bills of general civil works & ARC/BRC works, provided the bills
are recorded regularly and submitted to Account Section within Ninety [90] days. If
the contractor fails to submit the bills regularly in such a way so that the same
cannot be recorded and submitted to account section within Sixty [60] days, ad-hoc
payment as stated above, may not be released and payment will be released as per
GSECL‟s general procedure. The period of Sixty [60] days shall be considered from
the date of receipt of last R.A. Bill by Account Section.
5. METHOD OF PAYMENT:
a. The payment for the work done will be made by running bills every month
after taking joint measurement within 30 days.
b. Final bill will be paid within reasonable time after settlement of material
account by you and after recording of joint measurement.
6.“All bidders shall submit the details/documents in support of Technical
Qualification Requirements duly certified and verified for authenticity from Specified
Third-Party Inspection Agency (TPIA) or Statutory Auditor of their Company or
Practicing CA/CA Firm along with a certificate regarding verification of authenticity
of documents as per the format placed at Appendix 1. All the documents submitted
by the bidder in support of meeting Technical QR only shall be digitally signed by
the Specified Third-Party Inspection Agency (TPIA) or Statutory Auditor of their
Company or Practicing CA/CA Firm.
In case documents are certified & verified for authenticity through TPIA, the
verification and certification of authenticity of documents is acceptable from any of
the following TPI As:
1. M/s Competent Inspectorate and Consultants Pvt. Ltd, Hyderabad, India.
2. M/s Gulf Lloyds Industrial Service India Pvt. Ltd.-Ahmedabad.
3. M/s International Certifications Services.
4. M/s Intertek India Pvt. Ltd.
5. M/s SGS India Pvt. Ltd.
6. M/s Moody International (India) Pvt. Ltd.
EW- 279 PUR-F-006 RFQ-76356
7. M/s TUV SUD South Asia (P) Ltd.
8. M/s TUV Rheinland (India) Pvt Ltd.
9. M/s Bureau Veritas (india) Pvt. Ltd.
10. Hertz Inspection & services Pvt. Ltd.
11. IRCLASS Systems and Solutions Pvt. Ltd.
The Bidder shall be responsible to get their documents/ credentials verified &
certified by the Specified Third- Party Inspection Agency (TPIA) or Statutory Auditor
of their Company or Practicing CA/CA Firm in support of Technical QR. All the
costs pertaining to third party verification and certification (including those by
statutory auditors) shall be borne by the Bidder. GSECL shall have no liability
(financial or otherwise) towards the same and shall not be liable for any claim/
dispute between the bidder and the Specified Third-Party Inspection Agency (TPIA)
or Statutory Auditor of their Company or Practicing CA/CA Firm.”
The following website may be referred for contact details of above TPIAs:
http://nabcb.qci.org.in//accreditation/reg_bod_inspection_bodies.php.
This is to be implemented immediately.
Annexure-1
Undertaking from Third Party Inspection Agency/Statutory Auditor or Practicing
CA/CA Firm
(On letter head digitally signed by a person duly authorized to Sign on behalf of the firm)
Ref: Date:
Power Station ……………….
Subject: Authentication of veracity of documents submitted by M/s …… in support of
Meeting the Qualifying Requirements
Ref: Tender no. …………………..
Name of the Package/ Tender: ………………………………………
M/s. ……………… (here in after called Bidder) having Registered office at ……………………
intend to participate in above referred tender of GSECL.
The tender condition stipulates that the bidder shall submit supporting Documents
pertaining to Qualifying Requirement duly verified and certified by Third-Party Inspection
Agency (TPIA) or Statutory Auditor of their Company or Practicing CA/CA Firm as per the list
mentioned in the bidding documents.
In this regard, it is hereby confirmed that we have examined the following documents, which
are also attached with this letter. The same has been verified from the Original Documents
and / or Client for authenticity.
We hereby confirm that the following documents are found to be genuine and authentic.
EW- 279 PUR-F-006 RFQ-76356
1. Doc ref. no. ……….. Dated …….. (Name of Documents)
2. Doc ref. no. ……….. Dated …….. (Name of Documents)
All the aforesaid documents have been digitally signed by us as a certificate of authenticity.
We further confirm that we neither have any vested interest in aforesaid tender nor have any
conflict of interest in respect of above tender.
This certificate is issued at the request of M/s ………………. (Bidder) for the purpose of
participating in the subject tender/s
Thanking you,
1. ASSIGNMENT:
The rights and liabilities of the contractor shall not be assigned or transferred by them
without the consent in writing of the GSECL to any other person, firm or organization.
2. The successful Bidder, on receipt of letter of intent will submit within a week's time
his planning / programme of works, for scrutiny of the GSECL in a Bar Chart format,
clearly indicating GSECL's inputs also. Contractor will plan his works such that
simultaneous work should progress in such a way that entire job is completed in scheduled
time limit on all the fronts released by GSECL.
3. The successful bidder will have to depute his authorized representative to attend
progress review meetings to be held at GSECL, Gandhinagar TPS without any extra cost.
4. The Contractor will be responsible for complying with all rules and regulations and
labour laws applicable to him and the GSECL will not be responsible for any lapses
committed by them. If there is any claim from any Government authority pertaining to the
contract, the same amount will be deducted from the Contractor's bill.
5. The time limit for completion of work is stipulated as in the tender will be adhered to.
6. The Contractor's rates should be firm and no variation clause is to be quoted by the
Contractor and GSECL will not accept the same, during contractual period including
extended time limit if any.
7. BIDDER TO STUDY, ANALYSE & CONSIDER:
a) The information given in this specification is in good faith and meant to serve as
a guide to the Bidder. It is, therefore, imperative that Bidder shall obtain and examine for
himself all the data, information and particulars required for the satisfactory execution of
the work under this tender. The submission of a bid by Bidder implies that he has fully
read the specifications, bid drawings, instruction to the bidder along with Contract
Document and Conditions of Contract, applicable labour laws, safety norms etc., and has
made himself aware of the scope and the specifications for the work to be performed and
local conditions and other features which have a bearing on the cost and execution of the
work. This specification is intended as a general description of quality envisaged for
materials and workmanship and of the finished work. It is not intended to cover minute
details. The work shall be executed in accordance with the best modern practice and to the
complete satisfaction of the Purchaser. Special techniques approved by the Purchaser shall
be used if and where found necessary. This specification shall have precedence if anything
contrary to this is stated elsewhere in the contract documents. The Purchaser‟s decision
shall be final and binding on the contractor on any issue arising out of such discrepancies.
b) Inspection of site by bidder:
Before submission of his bid, Bidder shall inspect the site, examine and obtain all
information required and satisfy himself regarding matters such as:
weather characteristics,
Location of site and access, right of way, means of communication & mode of Transport
The type and number of equipment and facilities required
EW- 279 PUR-F-006 RFQ-76356
The quantity of various items of the work.
The availability and rates of material.
Labours condition.
Local working conditions, obstructions and hindrances that may arise etc.
Power house, which is under running conditions.
Required GSECL‟s security checks.
All materials brought to site only after making entries in security register at Control
c) These factors are likely to affect the satisfactory completion of work and or cost
thereof. The submission of a bid by the Bidder will be construed as evidence that such
an examination was made and any later claims/ disputes in regard to rates quoted
shall not be entertained or considered by the GSECL.
d) The site visit shall be done by the bidder on his own responsibility and all liabilities
including cash, arising out of the site visit shall be at the bidder‟s account.
e) Contractor‟s scope of work shall also include making all necessary arrangements for
access to work sites, stores and site offices etc. from the nearest approach road to
facilitate transportation of man power, machinery and equipment duly considering the
existing site conditions. No extra claims / costs will be entertained by GSECL.
f) The bidder shall carefully study the work to be carried out & consider all the factors &
shall take into account &consider all the factors such as lead, lift haulage of materials,
sequence of construction, etc. & shall allow for all such information / data in the rates
g) The GSECL will not pay any extra charges or rate for any reason in case the contractor
claims, after acceptance of contract to have misjudged the site condition. Ignorance of
the intents and contents of the specification document and site conditions shall not be
accepted by the Owner as basis for any claims for compensation.
h) BIDDER shall inspect the site, examine and obtain all information required and satisfy
himself regarding matters such as sub-surface conditions, water records, access to
site, communication, transport, right of way, the type and number of equipment and
facilities required for the satisfactory completion of work, the quantity of various items
of the work, the availability and rates of material, local working conditions,
uncertainties of weather, obstructions and hindrances that may arise etc. which may
affect the work or cost thereof, before submission of his bid. Ignorance of site
conditions shall not be accepted by the ENGINEER IN CHARGE as basis for any claim
for compensation.
i) The rates quoted by BIDDER shall be based on his own knowledge and judgment of
the conditions and hazards involved and shall not be based on any representations of
the Engineer in Charge. No claim on this account shall be admitted by the GSECL.
j) The bidders shall submit on online in n-procure with their offer without any deviations
in general terms and conditions of the contract or in technical specifications.
k) Tenders received after the time and date specified in the tender notice will not be
accepted. Once the offer is submitted by bidder before due date of submission, the
bidder shall not be allowed to submit revised/ additional/ modified offer even before
due date and time of submission of tender. However, if the date of issue and/or
submission of tender are extended by the Corporation due to any reason, the bidder
may submit if their wishes the revised/additional/modified offer before extended due
date and time of submission.
l) The Corporation reserves the right to accept any tender irrespective of whether it is
lowest or not or to reject all the tenders without assigning any reasons thereof.
Tenders deferring from the technical specifications or the method of bidding in a
radical manner may also be rejected.
m) The bidder shall be presumed to have carefully examined the drawings, conditions &
specifications of work & to have fully acquainted themselves with all details of the site
conditions, locations, materials, geological & weather characteristics, labour
conditions & in general all the necessary information and data etc. pertaining to and
need for the work.
EW- 279 PUR-F-006 RFQ-76356
n) This specification is intended as a general description of quality envisaged for
materials and workmanship and of the finished work. It is not intended to cover
minute details. The work shall be executed in accordance with the best modern
practice and to the complete satisfaction of the Purchaser. Special techniques
approved by the Purchaser shall be used if and where found necessary. This
specification shall have precedence if anything contrary to this is stated elsewhere in
the contract documents. The Purchaser‟s decision shall be final and binding on the
contractor on any issue arising out of such discrepancies.
o) Each bidder shall also submit a 'Declaration' to the effect that the tenderer is an
engineering construction firm or an association of firm or firm which has successfully
carried out large works of this nature and has adequate organization and experienced
personnel to handle this type and magnitude of work. Information should also be
given regarding the constitution of the firm; it‟s authorized, subscribed & paid up
capital, the date & place of registration, the place of business, the names of the
directors and other relevant information.
p) It is the intent of the ENGINEER IN CHARGE to incorporate these specification
documents in the final „Contract‟. BIDDERS are required to review these documents
and clearly state in their proposals their acceptance of the same.
q) Each page of the bid document including the bid drawings shall be signed, stamped
and dated in ink by the BIDDER as a token of having examined the same. Any
correction in price and the rates entered in the Schedule of Price shall also be signed
and dated by the BIDDER in ink, before submitting the bid. Non-compliance with this
condition will make the bid liable for rejection.
r) All safety measures as required to be adopted as per the Statutory Regulations and the
Safety Rules of the Plant shall be strictly followed by the Contractor during the
execution of the Contract. The Contractor shall set up a suitable safety organization of
his own in this regard.
s) In connection with the execution of the Contract, the Contractor shall comply with all
applicable statutory Rules & Regulations including employment of labours at site.
t) The Contractor shall carry out any and all such works, as may be required, for civil
work to be completed in all respect as per the Contract Specification.
u) If the GSECL Engineer-in-Charge is not satisfied with the progress of work at site, he
shall direct the Contractor to depute more numbers of supervisory personnel/workers
to meet the completion schedules as per the Contract. Upon receiving such direction,
Contractor shall deploy additional personnel within 7 days without any extra cost.
v) The GSECL may during the progress of work, order the removal of part or whole of the
work executed, found not in accordance with the specifications/ instructions. No extra
claims shall be entertained for re-executing or altering of such work.
8. SAFETY MEASURES:
The contractor shall ensure the safety of workers, material and structure including
existing structures during execution of the contract. Safety measures shall be followed
during operations of equipments/machinery being used. No separate payment shall be
made for the safety measures and the quoted rates shall include the cost for all safety
9. COMPLETENESS:
Any technical services as set forth here in above and which might not have been
specifically mentioned in this Contract relating to the work or in the specifications and
which are not expressly excluded therefore but which are necessary for the
performance in accordance with the specifications as an integral part of the painting
and misc. Civil works shall be rendered by the Contractor without any extra cost.
10. TOTAL RESPONSIBILITY
The Contractor shall be solely responsible for the entire technical works / services
irrespective of works / services have been made /rendered by him.
11. PAYMENT TO THE LABOURES:
(a) Contractor has to pay the CPF as well as salary to his skilled/unskilled manpower
by cheque A/c payee only, as per minimum wages & prevailing applicable rules on
or before 7th day of next month.
EW- 279 PUR-F-006 RFQ-76356
(b) Contractor has to produce challan of PF with list of employees.
(c) Contractor shall have to make payment to his labours in presence of Personal
Officer (Estt.) GSECL, Gandhinagar TPS.
12. CONTRACT AGGREMENT ON ACCEPTANCE:
The successful contractor will have to sign an agreement as per the Gujarat State
Electricity Corporation Ltd.'s rules on stamped paper and the necessary stamp duty
charges shall be borne by the contractor.
On acceptance of the tender the name (s) of the accredited representative (s) of the
tenderer who would be responsible for taking instructions from the Engineers of the
GSECL shall be communicated to Chief Engineer (Gen.) Gandhinagar Power Station,
Gujarat State Electricity Corporation Limited.
13. Unsatisfactory progress of the work:
If the work is found not progressing as per the requirement or found not satisfactory
then GSECL will take such action to get the work done through the other agency at
agency‟s risk and cost with 15% supervision charges and same will be recovered from
14.The EMD will be returned promptly to the unsuccessful bidder except that of L1, L2 &
L3 till the successful contractor pays the Security Deposit as mentioned in tender
document or after the expiry of the validity of the offer, whichever is earlier.
The EMD will be returned to the successful tenderer after he furnishes the Security
Deposit for the tender work. If he fails to furnish the SD, his EMD shall be forfeited
and the tenderer will not be allowed to participate in the tenders invited by this office
for a period of ONE Year in respective Power Station.
The EMD in form of Bank Guarantee shall be valid for Ten Months from the date
of submission of the tender.
15. Effect and validity of Bid: The submission of bid with these documents and specification
shall constitute an agreement that bidder shall have no cause of action or claim against
the GSECL for rejection of his bid. The GSECL shall always be at liberty to reject or accept,
split any bid or bids at its sole discretion and any action will not be called into question
and the bidder shall have no claim in that regards against the GSECL.
16. Stop Deal / Banned for business dealing / Blacklisting :-
Has submitted fake, false or forged documents/certificates
Has revised/ withdrawn price bid after opening of Techno-commercial bid, until and
unless it is sought for,
Has tempered with the stipulated tendering procedure.
Has refused to accept Letter of Acceptance / Purchase order / Work Order after the
same is issued by the company within the validity period and as per agreed terms
and conditions,
Has committed breach of contract or has failed to perform a contract or has
abandoned the contract,
Has failed to provide suitable expertise for the work as per pre-scheduled program.
Has failed to submit all the necessary tests reports / documents within time
scheduled / as per company‟s time limit, as mentioned in the LOA, if the Letter of
Acceptance (LOA) is placed subject to submission of type reports / documents to the
Has indulged in construction and erection of defective works.
Has supplied inferior quality / defective materials and refused to replace with
stipulated time frame, as specified by the company,
Has substituted materials in lieu of materials supplied by the company or has not
returned or has short returned or has unauthorisely disposed of materials /
documents / drawings / tools or plants or equipment supplied by the Company,
Has involved in malpractices such as bribery, corruption, fraud, canvassing and
pilferage,
Has unauthorisely obtained official company information or copies of documents, in
relation to the Tender / Contract.
EW- 279 PUR-F-006 RFQ-76356
Has failed to follow the stipulated mode of communication, if specified by the
tendering authority / Purchaser.
Has parted with, leaked or provided confidential / proprietary information of the
company given to the firm only for its use (in discharge of its obligations against an
order) to any third party without prior consent of the Company,
Any other ground for which in the opinion of the Company makes it undesirable to
deal with the Firm
In case the state Government directs the Company to place a firm in stop dealing /
banned for business dealing / blacklisting.
Conflict of Interest among Bidders / Agents
A bidder shall not have conflict of interest with other bidders for particular quoted
item. Such conflict of interest can lead to anti-competitive practices to the
detriment of Procuring Entity's interests. The bidder found to have a conflict of
interest shall be disqualified. A bidder may be considered to have a conflict of
interest with one or more parties in this bidding process for particular quoted item,
a) They have proprietor/partner(s)/Director(s)in common; or
b) They receive or have received any direct or indirect
subsidy/financial stake from any of them; or
c) They have the same legal representative/agent for purposes of this bid; or
d) they have relationship with each other, directly or through common third
parties, that puts them in a position to have access to information about or
influence on the bid of another bidder, or
e) bidder participates in more than one bid in this bidding process.
Participation by a bidder in more than one Bid will result in the
disqualification of all bids in which the parties are involved. However, this
does not limit the inclusion of the components/ sub-assembly/ assemblies
from one bidding manufacturer in more than one bid.
f) In cases of agents quoting in offshore procurements, on behalf of their
principal manufacturers, one agent cannot represent two manufacturers or
quote on their behalf in a particular tender enquiry. One manufacturer can
also authorise only one agent/ dealer. There can be only one bid from the
following:
1. The principal manufacturer directly or through one Indian agent on his
behalf; and
2. Indian/foreign agent on behalf of onIy one principal.
g) A Bidder or any of its affiliates participated as a consultant in the
preparation of the design or technical specifications of the contract that is
the subject of the Bid;
h) in case of a holding company having more than one independently
manufacturing units, or more than one unit having common business
ownership/ management, only one unit should quote. Similar restrictions
EW- 279 PUR-F-006 RFQ-76356
would apply to closely related sister companies. Bidders must proactively
declare such sister/common business/ management units in same/ similar
line of business.
i) Bidder shall not act in contravention/violation to the provisions of
competition act, as amended from time to time.
Every bidder should, at the time of submission of bid, give a declaration, that
bidder shall not have conflict of interest with other bidders for particular
quoted item, as above.
For & On behalf of GSECL
CHIEF ENGINEER (Gen)
GSECL: GTPS
SIGNATURE OF CONTRACTOR
EW- 279 PUR-F-006 RFQ-76356
SECTION-C:
GENERAL CONDITIONS OF CONTRACT
EW- 279 PUR-F-006 RFQ-76356
GENERAL CONDITIONS OF CONTRACT
1. DEFINITIONS :
(a) The Contract means the documents forming the tender and acceptance thereof,
together with the documents referred to therein or individual work order in the case
of term contract, including these conditions, schedules and/or additional
conditions attached to the form of tender or individual works, order, rate schedule,
the specifications and the drawings and all these documents, as applicable, taken
together shall be deemed to form the contract.
(b) The “Tender Document” means the form of tender, the applicable schedules and/or
additional conditions and the specifications and/or drawing as issued to the
contractors for the purpose of preparing tender.
(c) The expression “Works” or “Work” when used in the condition of contract shall,
unless there be something in the subject or context repugnant to such construction
means, the works or the work contracted to be executed under or in virtue of the
contract whether original or altered.
(d) The “Contractor” means the individual or firm or Corporation, whether incorporated
or not, undertaking the words and shall include his or its legal personal
representatives, successors and permitted assignees.
(e) “Corporation” means The Gujarat State Electricity Corporation Ltd. and the
“Accepting Officer” means the Officer who is authorized to sign and signs the
contract on behalf of the “Corporation”.
(f) The letter “EE” means Executive Engineer who in the case of measurement and
lump sum contract, direct the contract and the letters “SE” means Superintending
Engineer and “GM” means General Manager who administers and in the case of the
term contracts, directs the contract.
(g) The “Engineer-in-charge” means all officers of the Corporation appointed by the
General Manager to supervise the works or part of the works.
(h) “Approved” and “Directed” means the approval or direction of the Chief Engineer
(Gen), Gandhinagar TPS to Superintending Engineer or the person deputed by him
for the particular purpose.
(i) “BS.” means “British Standards” as issued by the British Standards Institution.
“A.S.” means the “American Standards” as issued by the American Standards
Institution, and “I.S.” means the “Indian Standards” as issued by the Indian
Standards Institution. Wherever the above-mentioned abbreviations are referred to,
in the specifications and/or work orders, they mean the addition with all
amendments current at the date of issue of tender document of work orders.
(j) In the case of measurement and terms of contract “Specifications” mean those
contained in Gujarat State Electricity Corporation Ltd. scheduled together with any
amendments etc. embodied in the tender documents. “Drawing” refers to those
incorporating the tender documents and/or any work orders referred therein.
(k) The “Contract Sum” means the sum accepted or the sum calculated in accordance
with the prices accepted in the tender and/or the contract rate as payable to the
contractor for the full and entire executing and completion of works.
(l) “The date for completion” is the date or dates of completion of the work or any part
of the works set out or ascertained in accordance with the individual work orders
and the tender documents or any subsequent agreed amendments thereto.
2. CONTRACTOR TO INFORM HIMSELF FULLY:
A. Notwithstanding anything contained to the contrary in the specifications or tenders
in subsequent exchange of correspondence, the conditions of contract shall be
binding on the Contractor and any change or variation expressed or implied,
however made in the said conditions, shall not be valid or operative unless
expressly sanctioned by the Corporation. The Contractor shall be deemed to have
EW- 279 PUR-F-006 RFQ-76356
fully informed himself and to have special knowledge of the provisions of the
conditions of the Contract herein contained.
B. The contractor shall be deemed to have carefully examined the work and site
conditions, the general conditions, the special conditions, specifications, schedules
and drawing and shall be deemed to have visited the site of the works and to
have fully informed himself regarding the local conditions.
C. If there shall have any doubt as to the meaning of any portion of these general
conditions or special conditions of the scope of work of the specifications or any
other matter concerning the contract, he shall in good time before submitting his
tender, send for the particulars thereof and submit them to the Engineer-in-charge
in writing in order that such doubt may be removed.
3. CONTRACT DRAWING AND SPECIFICATIONS:
The contractor will be entitled to receive one set of agreement along with one
certified copy of accepted tender.
The drawings which form part of these specifications show the work to be done in as
much detail as is possible at the present stage. They will be supplemented by such
additional detailed drawings as may be necessary as the work progresses. The
contractor shall perform the work on these features and in accordance with these
additional or revised drawings as the case may be and at the applicable rates as per
the contract.
The contractor shall check all drawings carefully and shall bring to the notice to the
Engineer-in-charge immediately of any errors or omissions discovered. The
contractor shall not take advantages of errors or omissions of any kind in the
drawings supplied.
4. INPUTS BY GSECL:
The electric power supply and connection for construction / work purpose shall be
given at one mutually agreed point at work site free of cost by the GSECL. Further
extension for construction site as well as bore well site for using construction water
will have to be carried out by the contractor as per requirement at their cost. The
necessary electric charges will be paid by the contractor as per rates prevailing from
time to time in the respective DISCOM.
1. If there are any surplus quarters available after meeting the requirement of GSECL's
staff, then GSECL will consider allotment of quarters on rent as per GSECL's rule.
2. The contractor will have to make their own arrangement of water for
construction work as well as for their labourers at his own cost. If possible,
water for construction purpose only at one point as decided by EIC and
recovery for water charges shall be affected at the 2 % of the item of which
water is used or by quantity measured by meter reading of water meter
installed by contractor, rate of water supply will be charged at prevailing
purchase rates of GSECL, for water supplied by GSECL is used as certified by
EIC. In case of agency is installing bore well and pumps at his cost, after
completion of work agency will hand over the bore well in good condition with
pumps to the GSECL.
5. DATA TO BE FURNISHED BY CONTRACTOR:
The contractor shall submit to the Executive Engineer for approval within one week
of the date of contract, a layout plan of construction plant and equipment for
the execution of work which the contractor proposes to adopt at site.
Prior to commencement of work, the contractor shall submit to the Executive
Engineer for approval, plans in triplicate showing the location of Major plant
shop and storage buildings, storage yards, offices, contractor's power house
including its services and housing facilities which he proposes to put up at site and
also indicate the programme of the work.
The successful bidder on receipt of letter of intent will submit within a week's time
his planning/programme of works for scrutiny of GSECL in a PERT/Bar chart
format, clearly indicating GSECL inputs also.
EW- 279 PUR-F-006 RFQ-76356
Contractor will plan his works such that on all the fronts released by GSECL,
simultaneous work should progress in such a way that entire job is completed in
scheduled time limit.
No change in the approved layout shall be carried out without specific written
approval of the Executive Engineer.
6. ERRORS, OMISSIONS AND DISCREPANCIES:
In all cases of errors, omissions, doubts or discrepancies in the dimensions, or
discrepancies in the drawings and items of work in specification, reference shall be
made to the Executive Engineer whose elucidation and elaboration shall be
considered as authoritative. The contractor shall be held responsible for any error
that may occur in the work thorough lack of such reference and precautions.
7. SECURITY DEPOSIT:
SECURITY DEPOSIT: In tender process for L1 bidder (lowest bidder)
security deposit will be charged as per table below:
Category of the Unit Security Deposit
Works up to Rs. 5 Works More than
Lakh Rs. 5 Lakh
Enterprise or Exempted 3% of Order Value
Organization which are
exempted from paying
Tender Fee & EMD
For all other 5% of Order Value 5% of Order Value
Enterprises
Note: Security Deposit will be collected from the successful tenderer at the rates
mentioned above. This may be recovered by deduction through running bills of the
contractors and / or by treating the Earnest Money Deposit (Bid Security) paid at
the time of submission of the tender.
After issue of Work order and Date of commencement, if successful bidder failed to start the
work then, RPAD notice will be issued to the successful bidder mentioning that on failing to
start the work within next 07 days from the date of issue of RPAD Notice the EMD will be
forfeited and he will not be allowed to participate in the tenders invited from Gandhinagar
TPS office for the period of One year.
The security deposit of the contract value shall be released on finalization of final bill /
successful completion of the work.
All damages, costs, charges, expenses and other sums which may be or may become due or
payable by the contractor to the Corporation under the terms of the contract, may be
deducted from the cash in the proceeds of sale of the securities/bank guarantee so deposited
(which the officer or person to whom the same may be endorsed as aforesaid is hereby
authorized to sell/to encase for that purpose) or from the interest of any such securities or
from any sums due or which may become due to the contractor by the Corporation or from
the whole or the balance unpaid as aforesaid of the encase securities so deposited being
repaid or transferred and returned as the case may be, to the contractor on finalization of
final bill OR after 06 (six) months of successful completion of the work, whichever later OR
on furnishing of the Performance Bond amounting to 5% of contract value against the defect
liability period as mentioned in this document elsewhere.
If entire security deposit is paid in approved form of Bank Guarantee should be remain valid
during the contractual period and such bank Guarantee should not be reduced on the basis
of the work actually done.
EW- 279 PUR-F-006 RFQ-76356
8. USE OF LAND:
The land required for office, godowns and for labour camp if not available with GSECL, then
the contractor has to arrange the same at his cost. GSECL will give the land only if the spare
land is available with the following conditions.
The contractor shall be permitted to use for the bonafide purpose of execution of this
contract free of cost. The contractor shall be permitted to use for the bonafide purpose of
execution of this contract free of cost.
1. Site required for the construction of the work.
2. Required approach road. The contractor shall make their own arrangements for the
necessary approach, road, for transport of their materials and be responsible for the
compensation on account of damage to crop etc. and shall till completion of work.
3. He will be charged the rent at the annual rate of rupees one hundred per every acre or
part thereof, for the construction of temporary hutments and his store yard. However area
required for such purpose may be clearly indicated in this offer.
All areas of operation, including those for his staff and labour colonies handed over to the
contractor shall be cleared and handed over back in good condition to the Engineer except
areas under works as per this contract or those for which specific approval has been
obtained from the Engineer. The contractor shall make good to the satisfaction of the Engineer
any damage or alternation made to areas which he has to hand over back or to other
property land handed over to him for purpose of this work.
Temporary structures may be erected by the contractor for storage sheds, offices,
residence etc. for noncommercial use on the land, handed over to him at his own expense
and with the permission of the Engineer. These structures shall comply with the regulation
that may be in force and/or specified by the Engineer with regard, thereto. In any
circumstances for constructing temporary structures for contractor's use, GSECL's free
supply materials shall not be used. If it is found that GSECL's free supply materials are used
for other than approved project drawings work, same will be recovered at
penalized rate.
The contractor shall preserve all existing vegetation such as trees on or adjacent to the
sites which do not interfere with the construction as determined by the Engineer.
The contractors shall take all possible precautions in felling trees authorized for
removal to avoid any unnecessary damage to vegetation and trees not to be felled and
to structures under construction, or to workmen, and shall be responsible for any
damage if it occurs in such operations
All produce from cutting of trees; grass etc. shall be the property of GSECL and shall
be stocked at the place specified by the Engineer. No claim shall be made for such
cutting and stacking of trees or grass etc. by the contractor
The contractors shall not unnecessarily or for use as fuel, cut any trees brush wood,
grass or other vegetation nor shall set fire there to without the written permission of
the Engineer. When such permission is given, the contractor shall take necessary
measures to prevent damage or to prevent fire spreading to surrounding property, and
shall be responsible for any such damage, if cause.
The land shall as herein before mentioned be handed back to Engineer in Charge
immediately after the completion of the work under this contract. Also no land shall be
held by the contractor longer than the Engineer shall deem necessary and the
contractor shall, on due notice by the Engineer, vacate and return the land which the
Engineer may certify as no longer required by the contractor for purpose of the work.
9. START OF WORK:
The contractor shall not enter upon or commence any portion of work except with
the written authority or instructions of the Executive Engineer or his subordinate
in charge of the work, failing such the contractor shall have no claim to ask for
measurement or payment for work and shall be responsible for any claims or
damages that may arise due to such unauthorized commencement or entry.
10. COMPENSATION FOR THE DELAY:
EW- 279 PUR-F-006 RFQ-76356
The time allowed for carrying out the work as entered in the tender shall be strictly
observed by the contractor and shall be reckoned from the date on which the order
to commence work is given to the contractor. The work shall throughout the
stipulated period of contract be proceeded with all due diligence (time being
deemed to be the essence of contract) and for delay, the contractor shall pay
compensation, an amount equal to ½ (half) percent per one week for the contract
amount or part thereof, including taxes & duties ( i.e. End cost of contract amount
including taxes & duties) and maximum up to 10 % of the order value, including
taxes & duties ( i.e. End cost of contract amount including taxes & duties) or such
smaller amount as per the decision of the Competent Authority of the GSECL The
penalty will be invariably deducted from the bills of the contractor and no refund
will be given unless the competent authority approves the reduction. The reasons
for delay, attributable to GSECL as well as to party will be brought out clearly
while putting the proposal for waiver/reduction in penalty.
11. ACTION WHEN WHOLE OF SECURITY DEPOSIT IS FORFEITED:
In any case in which under any clause or clauses of this contract the contractor
shall have tendered himself to pay compensation amounting to the whole of his
security deposit (whether paid one sum) or in the case of abandonment for the
work owing to serious illness or death of the contractor or any other cause, the
Executive Engineer on behalf of the Corporation, shall have powers to adopt (a)
below and any of the following courses under (b) and (c) as he may deem best
suited to the interest of the Corporation.
(a) To rescind the contract (for which rescission notice of 10 days) in writing to the
contractor under the hand of the Executive Engineer shall be conclusive evidence
and in that case the security deposit of the contractor shall stand forfeited and
absolutely at the disposal of the Corporation. To employ labour paid by the
Corporation, to supply materials, to carry out the works or any part of the work
debiting the contractor with the cost of the labour and the price of the materials (as
to the correctness of which cost and price, the certificate of the Executive Engineer
shall be final and conclusive against the contractor) and crediting him with value
of the work done in all respects in the same manner and at the same rates as if it
had been carried out by the Contractor under the terms of this contract and in
that case the certificate of the Executive Engineer as to the value of the work shall
be final and conclusive against the contractor.
(b) To order that the work of the contractor be measured up and to take such part
thereof, as shall be unexecuted, out of his hands and to give it to another
contractor to complete, in which case, any expenses, which may be incurred in
excess of the sum, which would have been paid to the original contractor, if the
whole work would have been executed by him (as to the amount of which excess
expenses, the certificate in writing of the Engineer-in-charge shall be final,
conclusive and shall be borne and shall be paid by the original contractors and
shall be deducted from any money due to him by the Corporation under the
contract or otherwise from his security deposit of his proceeds sale thereof or a
sufficient part thereof.
(c) In the event of the above courses being adopted by the Executive Engineer, the
contractor shall have no claim to compensation for any loss sustained by him by
reason of his having purchased or procured any materials or entered into any
engagements or made any advances on account of or with a view to the execution
of the work or the performance of the contract. And in case the contract shall be
rescinded under the provision aforesaid, the contractor shall not be entitled to
recovery or be paid any sum for any works thereof actually performed by him
under this contract unless and until the Executive Engineer shall have certified in
writing the performance of such work and the amount payable to him in respect
thereof and he only be entitled to be paid the amount so certified.
12. NOTICE UNDER UNSATISFACTORY PROGRESS:
If the progress of a particular portion of the work is unsatisfactory, and also if as
per the opinion/observation of the Executive Engineer (whose decision shall be
EW- 279 PUR-F-006 RFQ-76356
final) in charge that the general progress of work is not satisfactory, then
Executive Engineer in charge shall be entitled to take action under clause 11 (c)
after giving the contractor ten days‟ notice in writing and the contractor will have
no claim for compensation for any loss sustained by him owing to such action.
13. ACTION IN THE CASE OF DEFAULT BY THE CONTRACTOR :
In any case in which any of the powers conferred upon the Executive Engineer by
Clauses 11 and 12 hereof shall have exercisable and the same shall not have been
exercised, the non-exercised thereof shall not constitute a waiver of any of the
conditions hereof and such powers shall not withstanding be exercisable in any
further case of default by the contractor of which, by any clauses hereof, he is
declared liable to pay compensation amounting to the whole of his security deposit
and liability of the contractor for past and future compensation shall remain
unaffected in the event of the Executive Engineer taking action under sub-clause
(a) or (c) of Clause 11, he may if he so desires, take possession of all or any tools,
plants, materials, and stores in so upon the work or the site thereof belonging to
the contractor, or procured by him and intended to be used for the execution of
the work of any part thereof paying for allowing for the same in account at the
contract rates, or in the case of a contract rates not being applicable of current
market rates to be certified by the Executive Engineer whose certificate thereof
shall be final. In the alternative, the Executive Engineer may by notice in writing to
contractor or his clerk of works, foreman or other authorized agent, require him to
remove such tools, plant, materials or stores from the premises within a time to be
specified in such requisition, the decision to the contractor failing to comply with
any such requisition, the decision of the Executive Engineer as to the expense of
any such removal and the amount of the proceed and expense of any such sale, be
final and conclusive against the contractor
14. EXTENSION OF TIME LIMIT
If the contractor shall desire an extension of the time limit for completion of the
work on the ground of his having been unavoidably hindered in its execution or on
any other ground, he shall apply in writing to the Executive Engineer and the
Executive Engineer may, if in his opinion there are reasonable grounds for
granting extension, recommend such extension as he may think necessary or
proper. The decision of the competent authority in this regard shall be final, and
binding to the contractor. Any delay attributed to Corporation, shall be thus
compensated only by way of extending the limit.
15. COMPLETION CERTIFICATE
On completion of the work, the Contractor shall be furnished with Completion
Certificate by the Executive Engineer. No such certificate shall be given nor shall
be the work considered to be completed until works are taken over and/or duly
tested and put to operation as the case may be, nor until the work shall have been
measured by the Engineer-in-Charge or where the measurement have been taken
by his subordinates until they have received the approval of the Executive
Engineer the said measurement being binding and conclusive against the
contractor.
16. EFFECT OF THE CERTIFICATE :
No payment shall be made for any work estimated to cost less than Rs.1,000 till
after the whole of said work shall have been completed and a certificate of
completion given. But in the case of works estimated to cost more than Rs.1,000,
contractor shall on submitting a monthly bill thereof, be entitled to receive
payments. Proportionate to the part of the work then approved and passed by the
Engineer-in-Charge, whose certificate of such approval and a passing of the sum
so payable shall be final and conclusive against the contract. All such intermediate
payment shall be regarded as payment by way of advance against the final
payment only and not as payments for work actually done or completed and shall
not preclude the Engineer-in-charge from requiring bad, unsound, imperfect or
unskillful work to be removed and taken away and reconstructed or re-erected nor
EW- 279 PUR-F-006 RFQ-76356
shall any such payment be considered as admission of the due performance of the
contract or any part thereof in any respect of the occurring of the claim nor shall
conclude, determine or effect in any way the powers of the Engineer-in-Charge as
to the final settlement and adjustment of the accounts otherwise or in any other
way, vary or affect the contract. The final bill shall be submitted by the contractor
within one month of the date fixed for completion of work; otherwise the certificate
of the Engineer-in-charge of the measurement and of total amount payable for the
of the Engineer-in-charge of the measurement and of total amount payable for the
work shall be final and binding on all parties.
17. PAYMENT TO CONTRACTORS :
The rates for several items of works estimated to cost more than Rs.1, 000 agreed
to within shall be valid only when the item concerned is accepted, having been
completed full, in accordance with the sanctioned specification. In case, where the
items of the work, are not accepted, as so completed, the Engineer-in-charge, may
make payment on account of such items at such reduced rates, as he may
consider reasonable in the preparation of final or running accounts bills and it will
be binding to the contractor.
18. BILLS :
The Bill Shall be submitted by the contactor each month on or before the date
fixed by the Engineer-in-charge, for all works, executed in the previous month and
the Engineer-in-charge shall take or cause to be taken the requisite measurement
for the purpose or having the same verified and the claim so far as it is admissible,
shall be adjusted, if possible, within Fifteen days from the presentation of the bills.
If the contractor does not submit the bill, within the time fixed, as aforesaid, the
Engineer-in-charge may depute a subordinate to measure up the said work in the
presence of the contractor or his duly authorized agent, whose counter signature
in the measurement shall be sufficient warrant and the Engineer-in-charge may
prepare a bill from such list which shall be binding on the contractor in all
respects. In case if contractor/ representative does not remain present on specified
date for taking measurement than EIC may take the measurement one sided and
the same shall be binding to the contractor irrespective whether he has signed or
19. SUPPLY OF MATERIALS TO CONTRACTOR [APPLICABLE ONLY WHERE
MATERIAL IS TO BE SUPPLIED BY CORPORATION AS MENTIONED IN
SCHEDULE A ]
If the specification of the estimated work provides for use of any special
description of material to be supplied from the Corporation‟s stores or if it is
required that the contractor shall use certain stores to be provided by the
Engineer-in-charge, (such material and stores and the prices to be charged thereof
as hereinafter mentioned being so far as practicable for the convenience of
contractor but not so as in any way to control, the meaning or effect of this
contract specified in the schedule or memorandum hereto annexed). The
contractors shall be supplied with such materials and stores as may be required
from time to time be used by him for the purpose of the contract only and the
value of the full quantity of materials and stores so supplied shall be set off or
deducted from any sum due or thereafter to become due to the contractor, under
the contract or otherwise or from the security deposit or the proceeds of sale
thereof if the deposit is held in government securities the same or a sufficient
portion thereof, shall be sold for the purpose. All materials supplied to the
contractor shall remain the absolute property of the Corporation and shall on
account be removed from the site of work and shall at all times be open to
inspection by the Engineer-in-charge. Any such materials unused and in perfectly
good condition at time of completion or determination of the contract shall be
returned to the Corporation‟s store if the Engineer-in-charge so requires by notice
in writing given under his hand but the contractor shall not be entitled to return
any such materials except with such consent and he shall have no claim for
compensation on account of any such materials supplied to him as aforesaid but
EW- 279 PUR-F-006 RFQ-76356
remaining unused by him or for any wastage in or damaged thereto. The
contractor shall be responsible for the loss, destruction or deterioration of the
materials, stores or articles supplied to him by the Corporation even if such loss,
destruction or deterioration has occurred under any circumstances whatsoever
beyond his control as if the materials, stores or articles so supplied were his
20. WORKS TO BE EXECUTED IN ACCORDANCE WITH SPECIFICATIONS,
DRAWING, ORDERS ETC.
The contractor shall execute the whole and every part of work in the most
substantial and workman like manner and both as regarding materials and in
every other respect in strict accordance with the specification. The contractor shall
also confirm exactly, fully and faithfully to the designs, drawings and instructions
in writing relating to the work signed by the Engineer-in-charge and lodged in his
office and to which the contractor shall be entitled to have access for the purpose
of inspection at such office, or on the site of the work during office hours and the
contractor shall, if he so requires, be entitled at his own expense to make or cause
to be made copies of the specification and of all such designs, drawings and
instructions as aforesaid.
21. ALTERATIONS IN SPECIFICATIONS AND DESIGNS NOT TO INVALIDATE
The Executive Engineer shall have powers to make any alterations, or additions to
the original specification, designs and instructions that may appear to him to be
necessary or advisable during the progress of the work and the contractor shall be
bound to carry out the work in accordance with any instruction in this connection
which may be given to him in writing, signed by the Engineer-in-charge and such
alterations shall not invalidate the contract. Any additional work which the
contractor may be directed to do in the manner above specified as part of the work
shall be carried out by the contractor on same conditions in all respect on which
he agreed to do the main works and at the same rates as are specified in the
tender for the main work.
Where, however, the work is to be executed according to the designs, drawings and
the specifications recommended by the contractor and accepted by the competent
authority, the alteration above referred to shall be within the scope of such
designs, drawings and specifications appended to the tender.
22. RATES FOR WORKS NOT ENTERED IN ESTIMATE OR SCHEDULE OF RATE
OF THE CORPORATION
If the additional and altered work includes any class of work for which no rate is
specified in this contract, then such class of work shall be carried out at the rates
entered in the Schedule of Rates of the Corporation or at the rate mutually agreed
upon between the Executive Engineer and the Contractor, whichever are lower. If
the additional or altered work for which no rate is entered in the Schedule of Rates
of the Division is ordered to be carried out before the rates agreed upon then the
contractor within seven days of date of receipt by him of the order to carry out the
work should inform the Executive Engineer for the rate which it is his intention to
charge for such class of work and if the Executive Engineer does not agree to this
rate, he shall be noticed in writing, be at liberty to cancel his order to carry out
such class of work and arrange to carry it out in such manner as he may consider
advisable provided always that if the rates shall have been determined as lastly
herein before mentioned then in such case he shall only be entitled to be paid in
respect of the work carried out or expenditure incurred by him prior to the date of
the determination of the rate as aforesaid according to such rate or rates as shall
be fixed by the Executive Engineer in the event of disputes, the decision of the
General Manager of the Corporation will be final.
23. EXTENSION OF TIME LIMIT IN CONSEQUENCE OF ADDITION OR
ALTERATION
EW- 279 PUR-F-006 RFQ-76356
The time limit for the work shall be extended in the proportion that the increase in
its cost occasioned by alterations or additions bears to the cost of the original
contract work and the certificate of the Engineer-in-charge as to such proportions
shall be conclusive.
24. NO COMPENSATION FOR ALTERATION IN OR RESTRICTION OF WORK TO
BE CARRIED OUT
If at any time, after the execution of the contract documents, the Engineer-in-
charge shall, for any reason whatsoever, requires the whole or any part of the
work, as specified in the tender, to be stopped for any period or shall not require
the whole or part of the work to be carried out at all or to be carried out by the
contractor, he shall give notice in writing of the fact to the contractor who shall
thereupon suspend or stop the work totally or partially as the case may be in any
such case, except as provided here under. The contractor shall have no claim to
any payment or compensation whatsoever on account of any loss in profit or
advantage which he might have derived from the execution, of the work in full but
which he did not so derive in consequence of the full amount of work not having
been carried out or on account of any loss that he may be put to on account of
materials purchased or agree to be purchased or for unemployment of labour
recruited by him. He shall not also have any claim for compensation by reason of
any alterations having been made in the original specification, drawings, designs
and instructions which may involve any curtailment of the work as originally
contemplated. Where, however, materials have already been purchased or agreed
to be purchased by the contractor before receipt by him of said notice, the
Executive Engineer provided they are not in excess or requirement and are of
approved quality and/or shall be compensated for the loss, if any, that he may put
to in respect of materials agreed to be purchased by him. The amount of such
compensation to be determined by the Executive Engineer, whose decision shall be
final. If the contractor suffers any loss on account of his having to pay, his labour
charges during the period, during which the stoppage of work has been ordered
under this clause the contractor shall on application be entitled to such
compensation on account of labour charges as the Executive Engineer whose
decision shall be final, may consider reasonable provided that the contractor shall
not be entitled to any compensation on account of labour charges if, in the opinion
of the Executive Engineer, the labour could have been employed by the contractor
elsewhere for the whole or part of the period during which the stoppage of the
work has been ordered as aforesaid.
25. NO CLAIM FOR COMPENSATION ON ACCOUNT OF LOSS DUE TO DELAY
IN SUPPLY OF MATERIALS BY CORPORATION
The contractor shall not be entitled to claim any compensation from Corporation
for the loss suffered by him on account of delay by Corporation in the supply of
materials entered in Schedule A where such delay is caused by:
Difficulties relating to supply of railway wagons.
Force Majeure
Act of God
Any other reasonable cause beyond the control of Corporation, including shortage
of materials to be supplied by the Corporation and difficulties in time by reaching
at the site of any materials equipment.
In the case of such delay in the supply of materials, Corporation shall grant such
extension of time for the completion of the works as shall appear to the Executive
Engineer to be reasonable in accordance with the circumstances of the case. The
decision of the Executive Engineer as to the extension of time shall be accepted as
final by the contractor.
26. TIME LIMIT FOR COMPENSATION CLAIMS
Under no circumstances, whatsoever, shall the contractor be entitled to any
compensation from Corporation on any account unless the contractor has claimed
in writing to the Executive Engineer within one month of the cause thereof.
EW- 279 PUR-F-006 RFQ-76356
27. ACTION AND COMPENSATION PAYABLE IN CASE OF BAD WORK
If at any time, before the security deposit is refunded to the contractor, it shall
appear to the Executive Engineer or his subordinate in charge of the work that
any work has been executed with unsound, imperfect or unskillful workmanship
or with materials of inferior quality or that any materials or articles provided by
him for the execution of the work are unsound or of inferior quality to that
contract for or are otherwise not in accordance with the contract, it shall be lawful
for Engineer-in-charge to intimate this fact in writing to the contractor and then
notwithstanding the fact that the work, materials, or articles complained of, may
have been inadvertently passed, certified and paid for, the contractor shall be
bound forthwith to rectify or remove and reconstruct the work so specified in
whole or any part, as the case may require or if so required shall remove the
materials or articles so specified and provided other suitable materials or articles
at his own charge and cost, and in the event of his failing to do so within a period
to be specified by the Engineer-in-charge in the written intimation aforesaid the
contractor shall be liable to pay compensation at the rate of one percent on the
amount of the estimate for every day not exceeding ten days during which the
failure so continues and in the event of any such failure as aforesaid, the
Engineer-in-charge may rectify or remove or re-execute the work or remove and
replace the materials or articles complained of, as the case may be, at the risk and
expense in all respects of contractor should the Engineer-in-charge consider that
any such inferior work or materials as described above may be accepted, or made
use of, it shall be within his discretion to accept the same as such reduced rates
as he may fix thereof.
Provided that in the case of any work of which visible check is not possible if the
Engineer-in-charge or his subordinate in charge of the work feels that such work
has been executed with unsound, imperfect or unskillful workmanship or with
materials of inferior quality, he shall take sample tests at random, cost of which
shall have to be borne by the contractor and if after taking such test part of such
work is found to be defective in any respect or to have been executed with
materials of inferior quality then the contractor shall pay for the whole work such
amount as may be fixed by the office of the Engineer-in-charge on the basis of the
lowest quality of work found by him in such sample tests.
28. WORK TO BE OPENED TO INSPECTION, CONTRACTOR OR RESPONSIBLE
AGENT TO BE PRESENT.
All works under execution or in pursuance of the contract shall at all times be
open to the inspection and supervision of the Executive Engineer and his
subordinate and contractor shall at all times, during the usual working hours and
at all other times at which reasonable
notice of the intention of the Executive Engineer or his subordinate to visit the
works shall have been given to the contractor, during which period either he
should be present to receive order and instruction, or have a responsible agent
duly authorized agent shall be considered to have the same force and effect as if
they had been given to the contractor himself.
29. NOTICE TO BE GIVEN BEFORE WORK IS COVERED UP
The contractor shall give not less than five days‟ notice in writing to the Executive
Engineer or his subordinate in charge of the work, before covering up or otherwise
placing beyond the reach of measurement of any work, in order that the same may
be measured and correct dimensions thereof, taken before the same is so covered
up or placed beyond the reach of measurement and shall not be covered up or
placed beyond the reach of measurement and work without the consent in writing
of Executive Engineer or his Subordinate in charge of work. If any work shall be
covered up or placed beyond the reach without such notice having been given or
consent obtained, the same shall be uncovered at the contractor‟s expense and in
EW- 279 PUR-F-006 RFQ-76356
default thereof no payment or allowance shall be made for such work or for the
materials with which the same was executed.
30. CONTRACTOR’S LIABILITIES
The contractor shall supply, at his own cost, all materials (except such special
materials, if any as may be supplied from the Corporation stored in accordance
with the contract). Plant, tools, appliances, implements, ladders, cordage, tackle,
scaffolding and any temporary works which may be required for the proper
execution of the work, in the original, altered or substituted form and whether
included in the specification and other document forming part of the contract or
referred to in these conditions or not and which may be necessary for the purpose
of satisfying and complying with the requirements of the Engineer-in-charge as to
any matter on which under these conditions, he is entitled to be satisfied or which
he is entitled to require together with carriage thereof to and from the work. The
contractor shall also supply without any charge the requisite number of persons of
setting out works and counting, weighting and assisting in the measurement of
examination at the time and from time to time of the work or materials, failing this
the same may be provided by the Engineer-in-charge at the expenses of the
contractor and the expenses may be deducted from any money due to the
contractor under the contract or from his security deposit or the proceeds of sale
thereof or of a sufficient portion thereof, the contractor shall provide all necessary
fencing and light required to protect the public from accident and shall also be
bound to bear expenses of defense of every suit, action or other legal proceedings
of law that may be brought by any person for injury sustained. Owing to
neglecting of the above precautions and to pay any damage and cost which may be
awarded in such suit, action or proceedings to any such person or which may with
the consent of the contractor be paid in comprising any claim by any such person.
31. CONTRACTOR LIABLE FOR ALL DAMAGE
Compensation for all damage done intentionally or unintentionally by contractor‟s
laborer, whether in or beyond the limit of Corporation‟s property, shall be estimated
by the Executive Engineer or such other office as he may appoint and the estimates
of the Executive Engineer, subject to the decision of the Superintending Engineer,
on appeal, shall be final and the contractor shall be bound to pay the amount of the
assessed compensation demand, failing which, the same will be recovered from the
contractor as damages or deducted by the Engineer-in-charge from any sums that
may be due to or become due from Corporation to the contractor under this
contract or otherwise.
The contactor shall bear the expenses of defending any action or other legal
proceeding that may be brought by any person for injury sustained by him owing to
negligence of precautions for prevent the spread of fire and he shall also pay any
damage and cost that may be awarded by the court, if in consequence
32. RESCISSION OF CONTRACT AND FORFEITURE OF DEPOSIT
The contractor shall not assign or sublet, without the written approval of the
Engineer-in-charge and if the contractor assign, or sublet his contract, or attempt
to do so or become insolvent or commence any proceedings to be adjudicated as
insolvent or make any composition with creditors, attempt to do so, the Engineer-
in-charge may, by notice in writing rescind the contract. Also, if any bribe, gratuity,
gift, loan, perquisite, reward or advantage pecuniary or otherwise shall either
directly or indirectly be given, promised or offered by the contractor or any of his
servants, or agents, or any person to the employee of the Corporation in any way
relating to his office or indirectly interested in the contract, the Executive Engineer
may, by ten days‟ notice in writing, rescind the contract. In the event of a contract
being rescinded the security deposit of the contractor shall there upon stand
forfeited and be absolutely at the disposal of the Corporation and the same
consequences shall ensure as if the contract has been rescinded under Clause
thereof and in addition the contractor shall not be entitled to recover or be paid for
any work thereof actually performed under the contract.
EW- 279 PUR-F-006 RFQ-76356
33. COMPENSATION
All sums payable by a contractor by way of compensation under any of these
conditions shall be considered as a reasonable compensation to be applied to the
use of Corporation without reference to the actual loss or damage sustained and
whether any damage has not been sustained.
34. CHANGE IN THE CONSTITUTION OF FIRM TO BE NOTIFIED
In case of tender by partners of a Firm, any change in constitution of firm shall be
forthwith notified by the contractor to the Executive Engineer for his information.
35. WORKS UNDER DIRECTION OF SUPERINTENDING ENGINEER
All works to be executed under the contract shall be executed under the direction
and subject to the approval of Superintending Engineer /Engineer-in-charge for the
time being who shall be entitled to direct at what point or points and in what
manner they are to be commenced and from time to time to be carried on.
36. DECISION OF SUPERINTENDING ENGINEER TO BE FINAL
Except where otherwise specified in contract and subject to the power delegated to
him by Corporation under the Corporation‟s rules, then in force, the decision of the
Superintending Engineer/EIC for the time being shall be final, conclusive and
binding on all the specifications, designs, drawings and instructions herein before
mentioned and as to the quality of workmanship or material used on or as to any
other question, claim, right matter or thing whatsoever in any way arising out of or
relating to the contract, designs, drawings, specifications, estimates, instructions,
orders or these conditions or otherwise concerning, the works or the execution or
failure to execute the same, whether arising during the progress of the work or after
the completion or abandonment thereof.
37. Dispute Resolution Mechanism: For works contracts and composite
Contracts, the arbitration mechanism shall be governed by the Gujarat Public
Works Contracts Disputes Arbitration Tribunal Act, 1992 as per below details.
sub clause 37(1) Amicable Settlement : Any dispute, difference, controversy or
claim between the Parties arising out of or relating to this contract with reference
to the construction, interpretation, breach, termination or validity thereof
(hereinafter referred as "the Dispute") shall, upon the written request of either
Party be referred to the authorized representatives of the Disputing Parties for
resolution. The authorized representatives shall promptly meet and attempt to
negotiate in good faith a resolution of the Dispute within thirty days of the service
of the request.
sub clause 37(2) Arbitration : If the Parties fail to amicably resolve the disputes
or differences or contrary claims as indicated herewith in sub clause (1) of Clause
37 arising under or in connection with the present works contracts, whether
pertaining to works contracts alone or works and procurement both, the same
shall be referred to arbitration under the Gujarat Public Works Contracts Disputes
Arbitration Tribunal Act, 1992."
38. STORES TO BE OBTAINED FROM CORPORATION [APPLICABLE ONLY
WHERE MATERIAL IS TO BE SUPPLIED BY CORPORATION AS MENTIONED IN
SCHEDULE A]
The contractor shall obtain from the Corporation stores, such articles as are
mentioned in schedule “A” which may be required for the work or any part of the
work or in making up any articles required therefore or in connection therewith,
unless he has obtained permission in writing from the Executive Engineer or
obtained such stores and articles from elsewhere. The value of such stores and
articles as may be supplied to the contractor by the Engineer-in-charge will be
debited to the contractor in his account at the rate shown in the schedule “A”
attached to the contract and if they are not entered in said Schedule, they shall be
debited to him at cost price which for the purpose of this contract shall include
cost of carriage and all other expenses whatsoever which may have to be incurred
EW- 279 PUR-F-006 RFQ-76356
in obtaining delivery of the same at the stores aforesaid and further overhead
charges 15%.
The Contractor shall be responsible for the loss, destruction or deterioration of the
materials, stores or articles supplied to him by the Corporation, even if such loss,
destruction or deterioration has occurred under any circumstances whatsoever
beyond his control as if the materials, stores or articles so supplied were his
property. The contractor shall be responsible for returning the residual materials
after completion of the contract and it fails to return, the balance materials
supplied to him by the Corporation, the cost of the residual materials will be
recovered from the contractor at the market rate or stock issue rate whichever be
higher at the time of materials account plus 15%.
39. LUMP SUMS IN ESTIMATE
When the estimate on which tender is made, includes lump sums in respect of
parts of the works the contractor shall be entitled to payment in respect of the
items of works involved or the part of the work in question at the same rates as
are payable under this contract or such items or if the part of work in question is
not in the opinion of the Engineer-in-charge capable of measurement the
Engineer-in-charge may at his discretion pay the lump sum amount entered in the
estimate and the certificate in writing of the Engineer shall be final and conclusive
against the contractor with regard to any sum or sums payable to him under the
provision of this clause.
40. LUMP SUM TENDERS
Whenever lump sum tenders have been invited for buildings or other structures of
the same type, design, the contractor shall submit his bill stated in Clause No.
and the Engineer-in-charge not below the rank of work, Executive Engineer shall
certify by general measurement or by other method considered suitable to him, the
value of work done and the contractor shall be paid monthly a sum equal to 90%
of the total value the work so certified, since the last payment, after deducting a
part or whole of the secured advance if not already paid for the materials utilized
on the works. An additional secured advance for any fresh materials utilized on
the works. An additional secured advance for any fresh materials brought on site
will also be paid if certified by the officer not below the rank of Executive Engineer.
After the work is completed final bill would be paid on the certification of officer
not below the rank of Executive Engineer, that the work, is done according to
drawing and specifications attached to the tender. If any additions and alterations
have been carried out, detailed measurement in respect thereof shall be recorded
and extra payment or deductions are regulated as per item rates quoted by the
contractor while submitting the tender and if there are any items in the additions
and alterations for which the contractor has not quoted a rate, the payment shall
be as per Clause 39 above
41. ACTION WHERE NO SPECIFICATION
In the case of any class of work for which there is no such specification as is
mentioned, such work shall be carried out in accordance with the PWD and in the
event of there being no PWD specification, the work shall be carried out in all
respects in accordance with the instructions and requirements of the Engineer-in-
charge of the Corporation etc.
42. NO CLAIM FOR VARIATION IN QUANTITIES OR WORK
Quantities shown in the tender are approximate and no claim shall be entertained
for quantities of work actually executed, being either more or less up to any extent
than those entered in the tender or less than those entered in the tender or
43. NO CLAIM FOR COMPENSATION FOR DELAY IN STARTING WORK
No compensation shall be allowed for any delay caused into starting of work on
account of acquisition of land and in the case of clearance for works or any delay
in according sanction to estimates.
44. NO CLAIM FOR COMPENSATION FOR DELAY IN EXECUTION OF WORK
EW- 279 PUR-F-006 RFQ-76356
No compensation shall be allowed for any delays in execution of the work on
account of water standing in borrow pits or compartment. The rates are inclusive
for hard or cracked soil, excavation in mud, sub-soil water or water standing in
borrow pits and no claim for any extra rate shall be entertained unless otherwise
expressly specified and mentioned in the tender.
45. EMPLOYMENT OF TECHNICAL PERSONS:
The contractor shall keep one full time qualified Civil Engineer at the site, who
shall be fully authorized to receive and comply with such instructions, as given by
the Executive Engineer. The contractor shall intimate the name of such Engineer
with his qualifications and experience. The Executive Engineer shall have the right
to demand the removal of any technical personnel, skilled or unskilled workmen,
who in his opinion are considered to cause bad workmanship in the execution of
works or to cause indiscipline.
46. INDUSTRIAL LABOUR LAWS
Terms and Conditions regarding Labour L a w s
During the entire period of the contract, the Contractor and his Sub-Contractors
shall at all times comply with all applicable labour laws, rules, regulations,
notifications, and bye-laws issued by the Central Government, State Government, or
Local Authorities. This includes all existing laws as well as any amendments or new
notifications that may come into force during the contract period.
The Contractor and his Sub-Contractors shall, at all times abide by the following
Acts/Statutes related to Human Resources:
1. Factories Act, 1948;
2. Contract Labour (Regulation & Abolition) Act, 1970;
3. EPF & MP Act, 1952;
4. Building & Other Construction Workers (Regulation of Employment & Conditions
of Service) Act, 1996;
5. ESI Act, 1948;
6. Minimum Wages Act, 1948;
7. Payment of Wages Act, 1936;
8. Payment of Bonus Act, 1965;
9. Payment of Gratuity Act, 1972;
10. Workmen‟s Compensation Act, 1923;
11. ID Act, 1947;
12. Maternity Benefit Act, 1961;
13. Inter-State Migrant Workmen (Regulation of Employment & Conditions of Service)
14. The Building and Other Construction Workers' Welfare Cess Act,
17. The Carriage by Road Act,
The above list is only indicative and not exhaustive. The Contractor shall remain fully
responsible for ensuring compliance with all other applicable labour and welfare
legislations, rules, and regulations in force during the contract.
The following are some of the major responsibilities of the contractor, in addition to
other obligations prescribed under various labour laws, rules, and regulations issued
by statutory authorities such as the State Government or Government of India from
time to time, which the contractor shall strictly comply with during the execution of
EW- 279 PUR-F-006 RFQ-76356
the contract.
1) The Factories Act,
Age Restriction
The contractor shall not deploy any worker below the age of 18 years or above the
age of 60 years for the awarded work.
Payment of Earned Leave
Earned Leave shall be paid to all bona fide contract workers as per the provisions of
the Factories Act,
Payment of Earned Leave shall be made monthly together with wages to ensure
better compliance with the law.
Maintenance of Earned Leave Register
The contractor shall maintain an Earned Leave Register in Form No. 19 as per
the provisions of the said Act and shall submit the same on demand.
Maintenance of Statutory Records
All written registers, proformas, and statutory documents shall be maintained up to
date and kept ready for inspection at any time, or submitted on time to the
concerned authorities, as applicable under the relevant Acts by the contractor.
2) The Contract Labour (Regulation and Abolition)Act,1970
Obtainment of Labour Licence
The Contractor/Agency shall obtain the Labour Licence under the Contract Labour
(Regulation & Abolition) Act from the appropriate authorities before
commencement of work.
Validity of Labour Licence
The contractor shall maintain a valid Labour Licence under the Contract Labour
(Regulation and Abolition) Act for employing the required manpower necessary for
execution of the contract.
Engagement of Contract Labour
The contractor shall not be allowed to engage fifty (50) or more contract labourers,
including supervisors and other staff, without initiating the process of obtaining a
Labour Licence under the Contract Labour Act.
3) Minimum Wages Act,
Contractor shall have to make the payment of wages to the Contract Labours engaged
by them, on or before 7th of every month through nearest Nationalized Bank
compulsory, preferably situated in the premises of TPS area in case of all works
contract. The Contractor shall supply copy of Bank Statement duly stamped by the
Concerned Bank as well as debited entry of amount displayed in the contractors‟ own
bank account as token of proof towards payment of Wages through CLIM/prevailing
system at relevant time. Apart from Payment of wages through Bank, Contractors shall
have to make all other payments like Advances, Bonus, Leave Encashment etc. to their
labours through bank only and cash payment/entry will not be allowed.
Wages rates for contract laborers are applicable as per the terms and conditions of the
EW- 279 PUR-F-006 RFQ-76356
license. The contractor shall have to pay wages to workers as notified by the
Government of Gujarat from time to time.
Any default to pay the minimum wages to the engaged workers and deprived of their
right to minimum wages payment on or before 7th of each month shall be dealt as per
the provision of labour laws. Recurrence of the same may lead to cancellation of
awarded contract.
4) The Provident Fund and Miscellaneous Provisions Act,1952
1. Separate P.F. Code
The contractor must possess a separate P.F. code in the name of the
Firm/Agency/Company itself for the subject work.
2. Coverage Under PF & Pension Schemes
It should be ensured that all the contract labourers engaged by the contractor
are covered under the Provident Fund Scheme and Employee’s Pension
Scheme, and their contributions must be remitted regularly to the concerned
Photocopies of challans along with the ECR in this regard shall be submitted
regularly to the User Department to enable onward billing clearance.
3. Monthly Submission of PF Deductions
The contractor shall submit, along with his monthly bill, a statement regarding
deductions against the Employee‟s Provident Fund and Family Pension Scheme
in respect of each concerned employee.
4. Rate of Contribution
Provident Fund and Family Pension Scheme contributions at the rate of 12%
of wages (or at the rates made applicable by the Government from time to time)
shall be deposited by the contractor with the concerned PF Authorities.
This includes both the contractor‟s contribution and the workers‟ contribution.
5) Work m en’s Compensation & Employer’s Liabi li ty
Insurance.
Obtainment of Employee Compensation Policy
The contractor shall obtain an Employee Compensation Policy under the
Employees’ Compensation Act before starting the work.
Insurance Coverage for All Workers
Employee Compensation Insurance shall be obtained for all workers engaged for the
execution of the awarded contract.
Insurance in Case of Sub-letting
If any part of the work is sub-letted, the contractor shall ensure that the sub-
contractor obtains and provides Workmen’s Compensation Insurance and
Employer’s Liability Insurance for the labourers engaged by them.
Liability for Compensation and Medical Expenses
The contractor shall be liable to pay compensation in case of any accidental injury
arising out of and in the course of employment, as per the Employees‟
EW- 279 PUR-F-006 RFQ-76356
Compensation Act.
The contractor shall also bear all medical expenses resulting from on-duty
accidents.
6) ThePaymentofGratuityAct,1972
For better compliance, contractor shall pay amount of gratuity on a monthly
basis along with the payment of wages, calculated on a pro-rata basis per
month, which is equivalent to 15 days‟ wages for each completed year of
service for every worker. (*applicable to A R C /B R C works contract
7) The Payment of Bonus Act,1965
Entitlement to Bonus
Every worker shall be entitled to receive bonus from the contractor in an accounting
year, in accordance with the provisions of the Payment of Bonus Act.
Monthly Payment for Better Compliance
For better compliance, the contractor shall pay the bonus amount on a monthly
basis along with wages, calculated on a pro-rata basis per month.
Submission of Bonus Details
The contractor shall submit the details of bonus paid to its workers in Form No. C,
as prescribed under the Act, whenever required by the Government Authority as
well as by GSECL.
8) TheMaternityBenefitAct,1961
The contractor shall ensure that all entitled female workers are provided Maternity
Leave and all other applicable benefits as per the provisions of the Maternity
Benefit Act.
9) TheBuildingandotherConstructionWorkers’Act,1996
For any construction work falling under the definition of Section 2(1)(d), whether
it occurs inside or outside the factory premises, the said Act shall be applicable,
and the contractor or its sub-contractor shall be liable to comply with all provisions
framed there under.
10) The contractor shall give preference to existing or local contract
workers for engagement in the awarded contract and shall issue
appointment orders to each and every workers individually at the time of
EW- 279 PUR-F-006 RFQ-76356
their engagement during the period of contract and terminate the same at
the end of the each contract.
Follow the mentioned procedure at each milestone for the execution
of works contract.
11) On Commencement of Contractual Work
1. Before starting the work, the contractor shall contact the Labour Welfare
Officer / Industrial Relations Officer for completing all formalities related to
labour law compliance prior to commencement of the contract, as well as for
ongoing labour law compliance thereafter, so that no dispute arises in the
future regarding adherence to labour laws.
2. It is the responsibility of the contractor to ensure that the contractor‟s
employees maintain strict discipline with respect to security, safe working
methods, and conduct, and that they do not cause any hindrance to the
smooth running of the power station or to the duties performed by GSECL
Any lapse in this regard shall be viewed seriously, and if such lapse is found,
the contract is liable to be terminated.
If any of the contractor‟s staff is found unsuitable or behaves improperly, the
contractor shall remove such worker from the work-site immediately upon
demand by the Engineer-in-Charge (EIC).
Maintaining harmonious industrial relations among contract labourers is
solely the responsibility of the contractor. Any breach of this obligation will also
be viewed seriously.
3. A digital system developed at the request of the agencies working at
the premises of GSECL, is to facilitate them for easy, efficient, effective
management of data, gate passes, attendances, medical records, Police
Verification documents etc related to their employees / workers
deployed for various works and services against work order of GSECL.
4. On receipt of LOA and before commencement of work, authorized
representatives of the agency shall login in the CLIMS online portal /
prevailing system at relevant time and apply for registration of their
employees / workers uploading all information with required
documents in digital form. Upon completion of due verifications,
clearance by EIC and HR departments, contracting agency will obtain
gate passes. GSECL will only consider documents like wage sheet duly
accepted and signed by individual workers, as per the
EW- 279 PUR-F-006 RFQ-76356
engagement/deployment duration/hours of individual worker duly
certified by the agency, being the employer, for the purpose of
payment of bills and HR clearances.
Agency shall be solely responsible for maintaining accurate and up-to-
date data of their workers in the portal/ prevailing system at relevant
time. All statutory compliances under prevailing laws shall remain the
responsibility of the contracting agency. The agency shall indemnify
GSECL against any liabilities arising from non-compliance of legal
provisions or inaccuracies in the data maintained by them in the
digital portal of CLIMS/prevailing system at relevant time.
5. If the contractor intends to engage labourers beyond the limit specified
under law, the contractor shall obtain the necessary forms as applicable:
Form No. V under the Contract Labour (Regulation & Abolition) Act, 1970, or
Form No. VI under the Interstate Migrant Workmen (Regulation of Employment
and Conditions of Service) Act, 1979, for the purpose of obtaining the Labour
Licence from the Licensing Authority.
6. It shall be the duty of the contractor or his supervisor to ensure bio-metric
punching and proper reporting at the designated work location.
7. The contractor shall employ an adequate number of experienced staff at the
site for daily supervision and for maintaining various registers and records
required under labour laws and the contract.
No payment shall be admissible to the contractor for such supervision.
8. The gate passes obtained for any specific work order shall be valid only for
that particular work order, and the contractor shall not divert the manpower
to any other work order.
If any work or part thereof is desired or required to be sub-let, the contractor
shall obtain the prior written permission of the Engineer-in-Charge (EIC).
This permission is mandatory for considering the statutory documents of any
agency other than the agency to whom the original work order was awarded.
12) During Contractual Work under the progress:
1. All contractors shall make the payment of wages to the contract labourers
engaged by them on or before the 7th of every month through the nearest
Nationalized Bank, preferably one situated within the power station premises.
EW- 279 PUR-F-006 RFQ-76356
The contractor shall submit a copy of the Bank Statement, duly stamped by
the concerned bank, as proof of wage payment through CLIMS / the
prevailing system at the relevant time.
2. All contractors shall comply with and maintain all statutory documents and
registers as required under the provisions of the Labour Laws and the EPF
3. In case the contractor has more than one contract in the same TPS, the
contractor shall obtain work-order-wise separate gate passes and submit the
same along with the statutory compliance documents, also on a work-order-
wise basis, every month to the User Department to enable onward billing
clearance.
(13) CONTRACTOR TO INDEMNIFY THE GSECL REGARDING LABOUR
Indemnification to GSECL
The contractor shall indemnify and keep indemnified the GSECL, and every member,
officer, and employee of GSECL, including the Engineer-in-Charge and his staff,
against all actions, proceedings, claims, demands, costs, and expenses whatsoever
arising out of or in connection with the matters referred to in the above clauses or
elsewhere.
The contractor shall also indemnify GSECL against all actions, claims, demands,
costs, and expenses which may be made against GSECL by any workman/employee
of the contractor or any sub-contractor, or arising from any liability in any manner
towards such workmen/employees under any laws, rules, or regulations in force,
including but not limited to the following:
Employees‟ Compensation Act,
Employees‟ Provident Fund Act,
Contract Labour (Regulation and Abolition) Act,
Liability for Accidents and Injuries
GSECL shall not be liable for, or in respect of, or in consequence of any accident or
injury to any workman or any other person employed by the contractor or his sub-
contractor.
The contractor shall indemnify and keep indemnified GSECL against all such
damages, compensation, claims, demands, proceedings, costs, charges, and expenses
in relation thereto.
Compliance With Labour Laws at Contractor’s Risk and Cost
The contractor shall, at his own expense, risk, and cost, comply with all applicable
labour laws as mentioned above and shall keep GSECL indemnified in respect
Right of GSECL to Deduct Payments
GSECL shall be entitled and empowered to directly deduct from the bills payable to
the contractor or the contractor‟s sub-contractor any sum or sums which GSECL is
required to pay in its capacity as Principal Employer, due to the contractor‟s default
in complying with any provisions of labour laws.
EW- 279 PUR-F-006 RFQ-76356
The amount so deducted shall be recovered from the pending dues of the
contractor, along with 15% administrative charges.
Applicability of Rules, Regulations, and Circulars
Any rules, regulations, conditions, circulars, etc., currently in force or framed by
GSECL from time to time in connection with contracts shall be binding on and
acceptable to the contractor.
Additional Liabilities Under Labour Laws
The above are only some of the major liabilities of the contractor. In addition to these,
the contractor shall comply with all other liabilities prescribed under various labour
laws in force from time to time by statutory authorities such as the State
Government or the Government of India.
Authorized Representative
The contractor shall provide the name of the authorized representative, as
required to be submitted to other statutory Government authorities. The same shall
be notified to the Engineer-in-Charge from time to time.
14) Submission of Statutory documents to ensure the compliances:
The contractor shall upload statutory documents, work order-wise, under Labour
Laws and EPF in CLIMS / prevailing system at relevant time.
Required documents shall be u p l o a d e d by the contractor in existing portal
/prevailing system at relevant time invariably each month to Engineer In-
Charge for onward process and smooth clearance by HR Department.
List of documents required for gate passes of contract
workers through clims/prevailing system
Description of documents attached
1 Copy of Work Order
2 Copy of P. F. Code No.
Insurance Policy as per subject of work order under the Workmen
Compensation Act,1923
Contract agreements/ subletting work contract documents with approval
Copy of Id proof of Aadhar card or Election voting card or driving license
or Passport only
6 Copy of Police Verification in respect of each contract workers
15. The contractor whose work order value is above Rs. 5 lacs shall have to
submit “Declaration cum Indemnity Bond” on Rs. 300/- Non-Judicial
EW- 279 PUR-F-006 RFQ-76356
stamp paper in prescribed Performa (Annexure- “B”) with Agreement
and Indemnity Bond before the commencement of the contract.
Annexure-“B”
D E C LA R A TI O N CU M INDEMNITYBOND
(OnRs.300/-Non Judicial Stamp Paper duly notarized)
DECLARATION CUM INDEMNITY BOND
This Declaration cum Indemnity Bond made at _____________________ (mention
location) by M/s. __________________________________, having its Registered Office at
_________________________________________________________ (hereinafter referred to as
the “Contractor”, which expression shall, unless it be repugnant to the context or
meaning thereof, be deemed to mean and include its assigns, successors, executors,
sub-contractors and/or administrators) of the ONE PART,
In favour of
M/s. Gujarat State Electricity Corporation Limited, having its power station at
_________________ Thermal Power Station (hereinafter referred to as the
“Company”, which expression shall, unless it be repugnant to the context or
meaning thereof, be deemed to mean and include its assigns and successors) of the
OTHER PART.
The Company has entered into a contract with the Contractor for the work of
“________________________________________________” under Order No.
__________________ dated __________________ (hereinafter called the “Contract”);
AND WHEREAS,
It is one of the essential conditions of the Contract that the Contractor shall comply
with all the provisions of the Labour and Industrial Laws, as may be applicable from
time to time, for the discharge and completion of the works and services covered
under the Contract, including but not limited to:
Contract Labour (Regulation & Abolition) Act,
Child Labour (Prohibition and Regulation) Act,
Employees‟ Provident Funds & Miscellaneous Provisions Act,
Employees' State Insurance Act,
Minimum Wages Act,
Payment of Bonus Act,
Payment of Wages Act,
EW- 279 PUR-F-006 RFQ-76356
Employees‟ Compensation Act,
Factories Act,
and all other Labour Laws, Rules, Notifications, and Codes presently applicable to
the Contractor or that may become applicable during the tenure of the Contract
(hereinafter collectively referred to as the “Laws”)
AND WHEREAS the Contractor has agreed to execute this Declaration-cum-Indemnity
Bond to this effect and has further agreed to indemnify the Company, its Directors,
Officers, employees, and representatives, and keep them indemnified and harmless
against all third-party claims, charges, penalties, fines, expenses, losses, damages,
costs, suits or any other levy that may arise against the Company and/or its
management due to the failure of the Contractor to observe or comply with all
applicable laws.
NOW THIS DEED WI TN ES S ET H AS UNDER
1. The Contractor hereby declares that all acts, deeds, actions, activities, conduct,
lapses, delays, misdeeds, faults, breaches, inactions, etc., done by its assigns,
successors, executors, subcontractors and/or administrators shall be construed
as having been done by the Contractor, and the Contractor alone shall be liable
for all such acts, omissions, defaults, or failures.
2. In consideration of the Company awarding the Contract to the Contractor,
subject to the condition of execution of this Declaration-cum-Indemnity Bond,
the Contractor hereby declares and represents to the Company that it has
obtained all statutory registrations, certificates, licenses, and approvals
required under the applicable laws, enabling the Contractor to execute the
Contract in a legal and lawful manner.
3. That in the event of any liability arising out of the non-compliance of any
applicable laws of the land by the Contractor in connection with the performance
of the Contract, the Contractor shall bear all the resultant liabilities whatsoever,
if any. The Company, its Directors, Officers, employees, and representatives shall
not be liable for any such liability (ies).
The Contractor undertakes to indemnify, defend, and keep the Company and its
Directors, Officers, employees, and representatives indemnified and harmless
against all losses, costs, damages, claims, penalties, interest, expenses, demands,
fines, legal liabilities, causes of action, injuries to persons, suits, etc., which may
be suffered, incurred, undergone, and/or sustained by the Company, including
EW- 279 PUR-F-006 RFQ-76356
the costs and expenses that may be incurred in defending any such liability(ies),
claim(s), or proceeding(s) that may be made, taken, or arise thereon by any
person, body, authority, Government, or judicial/quasi-judicial authority, due to
the failure or non-compliance of any such laws and rules there under (including
any amendments to applicable Acts, laws, statutes, and rules).
This indemnity shall apply irrespective of whether such acts or omissions are
actual or alleged, active or passive, and shall extend to all matters arising out of
or in any way connected with the discharge of the said Contract.
4. The Contractor further declares that, in the event of any suit, claim, right,
damages, compensation, fine, levy, charges, expenses, losses, penalties, or costs
raised by any third party, including the contract labour engaged by the
Contractor, he shall join such proceedings before the concerned Court, Tribunal,
or Authority and shall effectively defend the same.
5. The Contractor hereby agrees and undertakes to make good any loss, damage,
claim, suit, demand, decree, or expenses that the Company may suffer, to the fullest
satisfaction of the Company. In the event the Contractor fails to make good the same,
the Company shall have the absolute right to recover such loss and/or any other
consequential loss sustained, without any restriction or limitation, together with any
incidental expenses, costs, and all related logistic expenses that may be incurred by
the Company, from the Contractor.
The Contractor further confirms and declares that this Declaration-cum-Indemnity
Bond is irrevocable and shall be final and binding upon him, his heirs, executors,
administrators, legal representatives, successors, subcontractors, and assigns,
wherever applicable.
Any claims or demands arising against the Contractor shall be adjusted against any
amount due and payable to the Contractor, and the Company shall have the right to
withhold any such amounts until the settlement of all claims, disputes, or obligations
towards the discharge of such liabilities.
6. This Declaration-cum-Indemnity Bond shall be governed by and construed in
accordance with the laws of India. Any dispute between the parties arising out of or
in connection with this Declaration-cum-Indemnity Bond shall be resolved through
the dispute resolution process prescribed in the General Conditions of the Contract
IN WITNESS WHEREOF, the Contractor has hereunto set their hand on the day,
month and year first written above.
SIGNED, SEALED AND DELIVERED
By the within-named “CONTRACTOR”
(Authorized Signatory)
Rubber Stamp of Firm/Company
EW- 279 PUR-F-006 RFQ-76356
Full Name:
Designation:
In the presence of Witnesses:
1. Full Name:
Residential Address:
Contact No.:
Signature:
2. Full Name:
Residential Address:
Contact No.:
Signature:
EW- 279 PUR-F-006 RFQ-76356
On Non-Judicial Stamp Paper of Rs.
To be submitted with NOTORIZED at the time of final bill
UNDERTAKING FOR LABOUR LAW COMPLIANCES
I, Proprietor / Owner / Partner /
Authorized Agent of M/s. do hereby declare and undertake
1. That in capacity of independent contractor for M/s.
(Sub-Contractor of M/s. ) worked as
Contractor at GSECL, GTPS Thermal Power Station for the nature of work
against Work
Order No. Dt. ., I have
complied with the provisions of all laws as applicable. I have paid the wages for the
month/s of my contractual period which is/are not less than the minimum rates as
applicable, to all my employee/s and no other dues are payable to my employee/s.
2. That I have covered all the eligible employee/s under the Employees‟ Provident
Funds and Miscellaneous Provisions Act, 1952 and deposited the contributions
under my P.F. Code No. Place: for the month/s
of my contractual period and as such no amount towards contributions whatever is
3. I further declare and undertake that in case any liability pertaining to any of my
worker, labour, employee/s is/are to be discharged by the Principal Employer i.e.
Gujarat State Electricity Corporation Limited, GTPS due to my lapse, I undertake to
reimburse the same or the Principal Employer is authorized to deduct the same
from my dues as payable.
4. I further declare and undertake the legal consequences which may arise in future
under the said work awarded, and I bound myself to resolve the same at the risk
and cost of M/s.
EW- 279 PUR-F-006 RFQ-76356
EW- 279 PUR-F-006 RFQ-76356
EW- 279 PUR-F-006 RFQ-76356
47.MATTERS RELATED TO EXECUTION OF WORK:
a) Work shall commence from the date given in letter to commence the work by EIC
at site. The Contractor shall make all necessary arrangements at site to mobilize
labour, operators, divers and materials and maintain necessary number of
machinery and equipment, barge, pontoons etc., to guarantee the agreed rate of
progress of work as per schedule.
b) A detailed work schedule showing how he proposes to carry out the work,
specifically mentioning time periods as well as date of commencement and
completion of each activity and such approved schedules must be strictly adhered
to by the CONTRACTOR. After the owner has agreed with the schedule, the
Contractor shall prepare detailed program of each work front/activity breaking it
down giving daily quantifiable/measure of progress. The schedules are to be
reviewed periodically with the OWNER / ENGINEER to ensure that the completion
date will be met or to institute corrective steps (at no extra cost to the ENGINEER)
to adhere to the completion dates. The OWNER reserves the right to revise the
schedule at his discretion in order to keep up to the completion date and to suit
the project requirement and such alterations shall not entitle the CONTRACTOR to
any extra payment.
c) A work schedule with PERT / Bar Chart for carrying out the work in prescribed
time limit mentioning date of commencement, activity to be carried with its time
period, starting & finishing event for each activity, completion of total project in
critical path etc, shall be jointly fixed and approved by the GSECL. Such approved
schedules must be strictly adhered by the Contractor.
d) After the GSECL has agreed with the schedule, the Contractor shall prepare
detailed program of each work front / activity breaking it down to daily quantifiable
measure of progress. The schedules are to be reviewed periodically with the Owner
/ E.I.C to ensure that the completion date will be met or to institute corrective
steps (at no extra cost to the GSECL) to adhere to the completion dates. The Owner
reserves the right to revise the schedule at his discretion in order to keep up to the
completion date and to suit the project requirement and such alterations shall not
entitle the Contractor to any extra payment.
e) The GSECL reserves the right to delete any item of schedule-B for which contractor
shall not have any right to claim on this account.
f) One permanent reference bench mark and a reference base line shall be given for
lay out of work, which shall be maintained without disturbance by the
CONTRACTOR during the tenure of the contract. CONTRACTOR shall establish
local bench marks as directed by the ENGINEER IN CHARGE.
g) The contract or any part thereof shall not be subject to change without the written
permission of the Chief Engineer (Gen.) GSECL, GANDHINAGAR TPS or his
authorized representatives.
h) During the execution of the work if it is found that the work is not progressing as
per the scheduled program approved by the GSECL & planned by the contractor,
due to the reasons attributable to the contractor, suitable action shall be taken as
per Clauses in this tender elsewhere & other relevant clauses appearing in the
section of “Terms & condition of tender & works contract, Legal conditions of works
contract” of tender document. And the GSECL may also take such action as it may
deem fit to ensure that the work is completed in time at Risk and Cost of the
contractor.
i) Contractor shall attend meetings at EIC's office at site or any other place as fixed
by the EIC, as and when required for review, discussion, coordination etc.
Attending these meetings shall be obligatory on the part of the Contractor, at no
cost to the GSECL.
j) The Contractor shall take all requisite & necessary care to observe that no damage
is caused to the existing, pumps, existing works, service road, or any other
structure etc. For any damage to the existing structures of the GSECL, the
Contractor shall be held responsible and he will have to rectify the damage
EW- 279 PUR-F-006 RFQ-76356
immediately up to the satisfaction of Engineer in Charge, at his own cost.
k) The work shall be completed within the period stipulated in the contract. & site
clearance arranged according to the progress of work at site. Therefore, the
contractor has to organize & coordinate the work to suit these circumstantial
conditions. In the event of any delay due to the above or due to any other reason
not attributable to the contractor, reasonable extension in completing the work
may be given at the discretion and as decided by the GSECL but no compensation
or idle charges will be payable to the contractor on this account or any site
conditions under any circumstances.
l) No idle charges shall be entertained by GSECL for any site condition or any
circumstances. The corporation will not pay any type of advances including
mobilization advance
48. RECOVERIES:
a) In case of any damage to equipment / machinery or structure / building of GSECL
or any public property due to negligence of contractor or any other reasons
attributed to contractor, the decision of E.I.C. regarding the amount of recovery
shall be final.
b) If the contractor fails to execute the work as per direction of E.I.C. within the time
frame given, the GSECL shall get the work done through any other contractor at
the risk and cost of the contractor and the cost of execution of such work along
with 15% overhead charges shall be deducted from contractor‟s monthly bill over
and above recovery as per rules.
c) Recoveries due from the contractor, up to the end of the month previous to the
one in which the bill is prepared shall be made from bills approved for payment
every month or at other periods when the bills are prepared, for the various
items in the following order of priorities and extents.
d) Deduction on account of security deposit in full together with shortage, if any, to
be made good.
e) Penalty in full, if levied.
f) Expenditure, if any, incurred by the Corporation on Contractor‟s behalf in labour
or materials in full.
g) Charges for services such as water and power supply etc. in full.
h) Charge on account of supply of materials like cement and steel in case of shortages
found in balance or excess consumption than specified.
i) Hire charges for Corporation or Government machinery if any.
j) Recoveries of advance and secured payment or payments for preliminary work in
full or the installment due if and as the same as may have been allowed.
k) Rent recovery on account of allotting quarters on rent as per Corporation‟s rules.
l) Income tax and sales tax in full as per Government rules.
m) Outstanding recoveries in respect of other contracts awarded by the Corporation if
n) Other recoveries. (If any)
49. WORK TO BE EXECUTED TO THE SATISFACTION OF THE ENGINEER -IN-
The contractor shall proceed with the work with diligence and expedition and
the whole of the work herein specified as well as the mode of execution shall
be under the supervision and direction and shall be carried on to the entire
satisfaction of the Engineer-in-charge, who shall have full power to order the
contractor to alter, enlarge or diminish the form, dimensions, positions, or
quantities of any of the work or to make use of material and workman-ship of
different descriptions and qualities from this herein specified.
The whole of the works, together with any temporary works, associated therewith,
shall be carried on in the most substantial proper and mannered workman like
manner, with the best materials and workmanship and to the entire satisfaction
of the Engineer-in-charge and in such order of time as he may direct. The
contractor shall attend to and execute without delay all orders and instruction
which may from time to time be issued by the Engineer-in-charge.
50. MATERIALS WORKMANSHIP etc.:
The work shall be executed in thoroughly substantial manner with material and
EW- 279 PUR-F-006 RFQ-76356
workmanship of best quality and strictly in accordance with the specifications and
with the drawings, or with such other drawings or written instruction as may from
time to time be furnished to the contractor, in accordance with terms of this
contract and shall be completed in every respect with all materials and
workmanship implied and necessary according to the fair interpretation and
meaning of the same and should there be any discrepancy between the drawings
and specifications or any difference or disputes as to the dimensions to be worked
to or the quality of the materials to be used, or the mode of doing periodical
quantity of the work to be executed or with respect to any subject arising out of
this contract, the decision of the Engineer-in-charge shall be final and binding on
all parties. Rejected material shall be so disposed off as to obviate any possibility of
their use on works. The place, method and period of disposal shall be as directed
by the Engineer-in-charge.
51. SAMPLES OF DESCRIPTIVE DATE:
Samples of descriptive date, requiring approval, shall be submitted by contractor to
the Engineer-in-charge in good time before the use of such material for inspection
and permission of testing if required. The samples shall be properly marked to
show the name of the material, manufacture, place of origin, and place where
to be used etc. Failure of any sample to pass specified tests will be sufficient
cause for the refusal to consider any further sample from the same source.
52. FENCING AND LIGHTING AND VENTILATION
Except as herein after provided, the contractor shall unless otherwise specified, be
responsible for the proper fencing, guarding, lighting and taking of the necessary
safety measures for all works comprised in the contract and or the proper
provision of temporary roadway, footways, guards fences, caution notices etc.
as far as the same may be rendered necessary by reasons for the work for the
accommodation and protection of workman foot passenger or other traffic and
of the owners and occupiers of adjacent property and of the public and shall
remain responsible for any accidents that may occur on account of his failure
to take proper and timely precautions.
All the arrangements made for fencing, lighting and ventilation shall be
maintained by the contractor throughout the tendency of the contract till
physical taking over of the work by the department.
53. LIABILITY FOR DAMAGE TO WORKS OR PLANTS
The contractor shall during, the progress of the work, properly cover up and
protect the work, and plant, and materials placed at his disposal or acquired
for him by the Corporation, from injury by exposure to the weather, or any
cause what so ever and shall take every reasonable proper timely and useful
precaution against accident or injury to the same from any cause and shall be
and remain answerable and liable for all accidents, or injuries thereto which until
the same be or be deemed to be, taken over by the Corporation, may arise or be
occasioned by the acts or omissions of the contractor or his workmen of sub-
contractors, and all losses and damages to the works or such plant or material
arising from such accidents or injuries as aforesaid shall be made good in the most
complete and substantial manner by and at the sole cost of the contractor and to the
reasonable satisfaction of the Engineer-in-charge. If the contractor fails to make
good such losses & damages within the time given by the Engineer-in-charge, the
Corporation shall be at liberty to recover the amount fixed by the Engineer-in-charge
for such losses or damages or any part thereof by deducting it from any sum due by
the Corporation to the contractor under this contract or otherwise.
Further the contractor shall, at all time, protect and preserve all materials, plant and
equipment that he may himself have procured for the execution of the work. All
reasonable requests of the Engineer-in-charge to enclose or especially protect any of
the above shall be expeditiously compiled with.
If the Engineer-in-charge considers that the work or materials or plant is not
sufficiently protected by the contractor, he shall be entitled to arrange for such
protection at his unfettered discretion and recover the cost thereof from the
contractor.
EW- 279 PUR-F-006 RFQ-76356
Until the work shall be or be deemed to be taken, over as aforesaid, the contractor
shall also be liable for and shall be deemed to have indemnified the Corporation in
respect of all damage or injury to any person or any property of the Corporation or of
others, occasioned by the negligence of the contractor or his workmen, or his sub-
contractor, or by defective design, work or materials.
54.EXPLOSIVE PROCUREMENT AND STORAGE (IF APPLICABLE)
i) Explosives, petrol, oils, fuels and other inflammable materials shall be stored
strictly in accordance with the rule of the Explosive Department.
ii) The contractor shall at his own expense construct and maintain, proper magazines
which are required for the storage of explosive and arrange for proper storage
facilities for oils, fuels etc. for use in connection with the work.
iii) The contractor shall at his own expense obtain such license or licenses as may be
necessary for strong and using explosives, oils, fuels etc. The department shall not
take any responsibility whatsoever in connection with the storage or use of
explosives on the site, or any accident or occurrence whatsoever in connection
therewith. All operation of the contractor in which or for which Explosives are
employed shall be at risk of contractor and upon his own responsibility.
55. MATERIALS TOOLS AND PLANT BROUGHT ON THE SITE OF WORK
All materials, tools and tackle of the contractor brought to and delivered upon the
site for the purpose of the work shall from the time of their being so brought shall
be deemed to be the property of the Corporation in its possession to be used for
the purpose of the work and for that purpose only and shall not on any account be
removed or taken away by the contractor or any other person without the written
permission of the Engineer-in-charge but the contractor shall nevertheless be
solely liable and responsible for and loss destruction thereof or damage thereto.
The Corporation shall have a lien on such materials, tools and tackle for any sum
of sums which may at any time prior to the completion of the works be due or
owing to the Corporation by the contractor, under in respect of and dispose of any
such materials, tools and tackle in such manner as the Corporation may think fit
and to apply the proceeding in or towards the satisfaction of such sum or sums
so due or owing as aforesaid but subject to such lien and power of sale and
disposal such surplus materials, tools and tackle shall belong to the contractor
and may be removed and disposed off by him as he may think fit.
56. ACCESS TO SITE AND WORK ON SITE
The Engineer-in-charge or his authorized representative may if he consider fit from
time to time enter upon any lands which may be in the possession of the
contractor under this contract, for the purpose of executing any work not
included in this contract and may execute such work not included in this
contract by agents, or by other contractors at his option and the contractor shall
in accordance with the requirements of the Engineer-in-charge, afford all
reasonable facilities for execution of the works including occupation of lands by
structure or otherwise for any other contractor employed by the Corporation
and his workmen or for the workmen of the Corporation who may be employed in
the execution on or near the site of the work not included in the contractor‟s
any contract in connection with or ancillary to the works and in default, the
contractor shall be liable to the Corporation for any delay or expense incurred
by reason of such default. Provided always that if the exercise of those power shall
cause any damage to the contractor he may within fifteen days of such damage
arising make a statement of the same to the Engineer-in-charge who shall from
time to time assess the value in his Judgment of such damage and the
Corporation shall from time to time shall pay to the contractor the amounts (if any
accepted as justified) by the Engineer-in-charge. The contractor shall not however,
on account of any such modified, new or extra work executed by or for the same of
the Corporation be entitled to claim relief from the obligation to execute other
57. INSPECTION OF WORKS
The Engineer-in-charge or his duly authorized agent shall have at all time full
power to inspect the works, wherever in progress, either on the site, on the
EW- 279 PUR-F-006 RFQ-76356
contractor's premises or at the premises wherever situated, of any firm or
Corporation where work in connection with this contract may be in hand.
Further, the contractor shall not allow, without written authorization permit entry
on site of work, any person except authorized agents of the Corporation of the
Engineer-in-charge or the contractor's staff and labour directly engaged on and in
connection with the work.
The contractor shall, during working hours, maintain supervisors having sufficient
training and experience to supervise the various items and operations of the work
and the said supervisors shall remain present during the inspections of the
Engineer-in-charge. All orders and directions given to such supervisors or other
staff of the contractor shall be deemed to have been given to contractor. Further
the Engineer-in-charge may be due notice, desire a higher ranking members of the
supervisory staff of the contractor to be present on any specified inspection and
the contractor shall comply with such direction.
58. CLEANING UP
The contractor shall at all times keep the construction area and his power house
and storage areas free from accumulation of waste, or rejected materials.
Prior to the completion of the work the contractor shall remove all rubbish from and
about the premises, and all tools, scaffolding, equipment and materials which are
not part of permanent structure. The premise will be left in a manner fully
satisfactory to the Engineer-in-charge, thereafter only the completion certificate will
be issued.
59. CONTRACTOR TO KEEP INVENTORY OF MATERIALS etc.
The contractor shall prepare and maintain an inventory of all materials temporary
rolling stock, plant purchased or hired for use of employment or for any of the
purposed for this contract and such inventory or a copy thereof shall at all times
be available for inspection by the Engineer-in-charge. A complete and up to date
copy of the inventory shall be submitted to the Engineer-in-charge in the
beginning and once a year; thereafter changes in the interim period, if any shall be
communicated on every three months.
60. CONTRACTOR TO RESTORE PLANT
Upon completion of the work, the contractor shall deliver to the Corporation, all
appliances, materials, and plants which may have been loaned or hired to him by
the Corporation and make good all damages which may have occurred to them,
except such as shall be caused by fair wear and tear in execution of the works.
61. PROGRESS SCHEDULE
i) The contractor shall furnish, within one week unless extended by the Engineer of
the order to start the work, a progress schedule in quadruplicate indicating the
date of start the weekly progress expected to be achieved and the anticipated
completion date of each major items of work to be done by him, also indicating
dates of procurement and setting up of materials, plant and machinery. The
schedule should be such as is practicable of achievement towards completion of
the whole work in the time limit and of the particular items on due dates specified
in the contract and shall have the approval of the Engineer. Further, the dates for
the progress as in this schedule shall be kept up-to-date. In case it is subsequently
found necessary to alter this schedule, the contractor shall submit in good time a
revised schedule incorporating necessary modifications proposed and get the same
approved by the Engineer. No revised schedule shall be operative within such
acceptance in writing.
Detailed schedules for each week showing the progress proposed to achieve shall
be submitted to the Engineer and got approved. The Engineer is further
empowered to ask for more detailed schedule or schedules any week by week, for
any items or items, and the contractor shall supply the same as and when asked
ii) The Engineer shall have, at all times the right without in any way vitiating this
contract, or forming grounds for any claim to alter the order of the works or any
part thereof and the contractor shall after receiving such direction proceed in the
order directed. The contractors shall also revise the progress schedule accordingly
EW- 279 PUR-F-006 RFQ-76356
and submit four copies of the revised schedule to the Engineer within seven days of
the Engineer's direction to alter the order of works.
iii)The contractor shall furnish sufficient plant equipment and labour and shall work
such hours and shifts as may be necessary to maintain the progress on the work
as per the approved progress schedule. The working and shift hours shall comply
with all GSECL's regulations in force and shall be such as may be approved by the
Engineer. They shall not be varied without the prior approval of the Engineer.
iv)The contractor shall from time to time as may be required by the Engineer, furnish
the Engineer, with a statement in writing of the arrangement he proposes to adopt
for the execution of this contract and the Engineer may if he considers, necessary
at any time advise alteration in the same, which the contractor shall adopt on
notice thereof.
v) The progress schedules shall be in the form of progress charts, forms,
statement and/or reports as may be approved by the Engineer. Further, the
contractor shall submit four copies showing the progress of work in forms and
charts etc. at periodicals intervals as may be specified by the Engineer.
62. DATE OF COMPLETION
The contractor shall supply, erect, equip and construct the whole of the works
and hand over them to the Corporation on or before the date specified in the
tender document including "Special Conditions" and save as herein provided, in
no circumstances whatever shall extend or alter the date for the completion of
works. Provided always that if in the opinion of the Engineer-in-charge the
completion of the works shall be delayed by any change of original design or
by the order of the Engineer-in-charge, of any altered, modified substituted or
additional works or materials omitted or by strikes, lock outs or stoppages of
labour, or revolution, riots, civil or political disturbance or by causes directly
due to war or by the contractor not being given possession of the site or any part
there-of or by the Corporation taking possession of and using the site or any part
thereof or the works or any part thereof, whether any nonperformance of work
under the powers herein contained or otherwise or by any nonperformance of
work or non-supply of materials to be performed or supplied by the Corporation
or by the contractor not receiving any orders, drawings, instructions or
directions in time or by the suspensions of the works or by fire, flood
exceptionally bad weather tempest, storm, or by from unforeseen circumstances
(and whether the same shall be due to any act or omission of the Corporation or
its agents or those in their respective service or not) the Engineer-in-charge
may, if in his unfettered discretion, he thinks fit either forthwith or at any later
time and from time to time not withstanding that the prescribed or extended
time for completion has expired or that the work have been completed, by
writing under his hand, extend the time for the completion of the works to such
date as he shall appoint. Provided always that unless the contractor makes a
written application to the Engineer-in-charge within one month of the cause of
delay and unless the time is extended by the Engineer-in-charge, the prescribed
time shall not be extended notwithstanding delays from the aforesaid foregoing
or any other causes of whatsoever kind.
63. SUBLETTING OF CONTRACT
There will be generally no objection on the component parts for the work, being
given over to responsible sub-contractors but Corporation shall under no
circumstances recognize these sub-contractors and the responsibility of
executing the work in the accordance with the conditions of contract will
entirely rest on the main contracts. The main contractors will therefore always
have the very responsible member, preferably a technical hand present on the
works with power to sign all work orders issued on the site of work and to take
requisite actions in the interest of very efficient execution of work. However,
the subletting of the contract can be made only with the prior approval of the
competent authority of the Corporation.
64. OTHERCONTRACTS FOR THE WORK SUSPENSION STOPPAGEOR
CURTAILMENTS OF WORK
EW- 279 PUR-F-006 RFQ-76356
If during the tendency of the contract the Engineer-in-charge shall for any
reasons (which shall be unquestioned) whatsoever require the whole or any
part of the work as specified in the contract to be suspended for any period or
shall not require the whole or any part of the work as specified in the contract
to be carried out at all by the contractor, he shall give notice in writing of the fact
to the contractor who shall thereupon suspend or stop the work totally or
partially as the case may be. In any, case, except as provided hereunder, the
contractor shall have no claim to any payment or compensation whatsoever on
account of any profit or advantage which he might have derived from the execution
of the work in full but which he did not so derive in consequence of the full
amount of the work not having being carried out, or on account of any loss that
he may be put to on account of materials purchased or agreed to be purchased
or for unemployment of labour recruited by him. He shall not also have any
claim for compensation by reason of any alterations having been made in the
original specifications, drawings, designs and instruction which may involve any
curtailment of the work as originally contemplated. Where, however, materials
have already been purchased or agreed to be purchased by the contractor,
before receipt by him of the aforesaid notice, the contractor shall be paid for
such materials at the rate determined by the Engineer-in-charge, provided they
would have been useful for the work curtailed or stopped are not in excess of
requirements, are of approved quality and cannot be used on other contract
works or otherwise by the contractor and/or shall be compensated for the loss if
any, that he may be put to, in respect of materials agreed to be purchased by him,
the amount of such compensation to be determined by the Engineer-in-charge,
whose decision shall be final.
The Engineer-in-charge may grant extension of time for the execution of any item
or items of work affected by such suspension of work. The decision for the
Engineer-in-charge, regarding the granting of extension and the period thereof
shall be final. The Engineer-in-charge may order the contractor to suspend any
work on account of bad weather; rain or storm and such other adverse climate
conditions and the contractor shall comply with the same.
The contractor shall not be entitled to an compensation for such suspension of
work, concrete lining at the junctions of the different works under different
contract shall be done with particular care regarding forms, construction joints,
interconnecting reinforcement etc. If any and the joint planning of such work
shall be with prior approval of the Engineer-in-charge.
65. OTHER CONTRACTORS
Apart from this work, the other works connected with the power house will be
simultaneous going on either departmentally or through agencies inside or outside
the power house. Each contractor or agency shall co-operate with others to
the fullest extent and shall allow to each other every facility and co-ordination
for execution of their works simultaneously and satisfactorily, during their action
of machinery or execution of any other co-ordination works of the power house,
the contractor will have to work only at places as directed by the Engineer-in-
charge. He will have some time to suspend his work partially or totally in the
interest of the work at large.
In such cases and at such time, he will be informed from time to time and directed
by the Engineer-in-charge where to work. He may also be required to remove the
scaffolding or to erect the scaffolding and shuttering in such a manner as to be of
little obstruction and inconvenience for erection of machinery. In such cases he
shall not be given any compensation on account of reduction or stoppage or labour
force or removal and reinstatement of scaffolding shuttering etc. It will be seen
that contractor is not put to unnecessary inconvenience.
In the matter of dumps, haul, roads, drainage, diversion and the like, each
contractor shall take into consideration the needs and requirements of the other
constructors, if any working in the vicinity. Further no contractor shall take or
cause to be taken any stops or action that may cause disruption, discontent or
EW- 279 PUR-F-006 RFQ-76356
disturbance to the work, labour of arrangements etc. or other contractors in the
neighboring project localities.
Any action, by any contractor, which the Engineer-in-charge in his unquestioned
discretion may consider as infringement of the above code, would be considered
as a breach of the contract conditions and the Engineer-in-charge may take such
action as he may deem fit against the contractor and the action taken shall be
considered as final and binding.
66. SPEED OF WORK
The contractor shall at all times maintain the speed of work to confirm to the
latest operative progress schedule but the Engineer-in-charge may at any time
with sufficient notice in writing direct the contractor to slow down any part or the
whole of the work for any reason (which shall not be question whatsoever, and
the contractor shall comply with such orders of the Engineer-in-charge. The
compliance of such orders shall not entitle the contractor to any claim or
compensation.
67. CONTRACT DOCUMENT AND MATTERS TO BE TREATED AS
All documents, correspondence, decisions and other matter concerning the
contract shall be considered as of confident and restricted nature by the
contractor and he shall not divulge or allow access there to any unauthorized
persons of any kind.
68. ACCESS TO THE CONTRACTOR'S BOOK
Whenever it is considered necessary by the Engineer-in-charge to ascertain the
actual cost for execution of any particular item of work of supply of plant or
material shall direct the contractor to produce the relevant documents such as
pay rolls records of personnel, invoices of materials and any other data relevant
to the item or necessary to determine its cost etc. and the contractor to the
aforesaid items in the mode and manner that may be specified.
69. INTEREST ON MONEY DUE TO THE CONTRACTOR
The contractors shall not be entitled to get interest on any amount either of their
bills or arrears whatsoever because of delay in payment by the Corporation.
Similarly they shall not be entitled for any interest on amount of bank guarantees
given by them. Non-payment of interest by the Corporation therefore, shall not
cause breach of contract.
70. MEASUREMENTS TO BE PROVISIONAL AND SUBJECT TO CORRECTION
Every measurements for running payment on account of work, done or supplies
made, shall be subject to adjustment or final measurements. In case of
disagreement between such intermediate and final measurements, the latter shall
prevail. All works shall be measured, met by standard measure and according to
rules and custom and usual in the use in Gujarat State Electricity Corporation
Ltd., and no proposal to adopt alternative method will be accepted, the Executive
Engineer‟s decision as to what is “the usual method in use in the Gujarat State
Electricity Corporation Ltd.” shall be final.
71. BREACH ON PART OF CORPORATION NOT TO ANNUAL CONTRACT
No breach or non-observance on the part of the Corporation of any of the
agreements contained herein, shall annul this contract or discharge the
contractor from the observance and performance thereof, or of any part thereof,
but on application by the contractor and in the unfettered discretion of the
Engineer-in-charge an extension of time may be given to the contractor in
respect of such breach or non-observance by the Corporation.
EW- 279 PUR-F-006 RFQ-76356
72. PROFORMA RETURNS
The contractor shall maintain Performa, charts and details regarding machinery
equipment materials, labour personnel and other matters as may be specified by
the Engineer-in-charge. He shall further, submit returns of Performa and
details as may be specified by the Engineer-in-charge from time to time.
73. LOCAL LAWS
All local laws in force at the time of entering into the contract and those enacted
thereafter shall be binding on the contractor and he shall abide by the same.
All import duties, sales tax and other local taxes shall be borne by the
contractor and they shall be deemed to have been covered by this quoted
tender rate
74. WORKS IN SHIFT DUTY
Works shall be planned in shift duties, if possible in three shifts, depending on
emergency of the work with prior approval of Eng. - in- charge. 0n Sunday or any
other holidays work shall be continued in order to maintain progress with prior
permission of Eng.-in -charge. Such works shall not form any grounds for
complaint, compensation or extension of time limit.
If on the other hand, the Engineer-in-charge directs that the work shall be
proceeded with on days and during hours which are not permissible under
this contract, the contractor shall proceed with the work as directed without in
any way vitiating this contract or forming any grounds for compensation of
The contractor shall in his dealing with labour, atall times, during the period of
this contract, have due regard to local festivals and religious and other customs.
A working day shall consist of two shifts each of eight hours, a working day shall
constitute any day on which in the opinion of the Engineer-in-charge, work can be
carried out in one or more shifts.
75. LIENS
Final payment to the contractor shall not be made until the contractor shall
deliver to the purchaser or receipts in full in lieu thereof, and in either case, an
affidavit that so far he has knowledge or information the releases and receipts
include all the labour and material for which in lien could be filed. If any lien
remains unsatisfied after all payments are made, the contractor shall refund to the
purchaser all moneys that the latter may be compelled to pay in discharging such
a lien, including all costs and a reasonable attorney's.
76. MISCELLANEOUS:
1. In case of conflict / discrepancies among clauses of different specifications given
in this document, the stringent specification shall be followed and under such
circumstances, the decision of the EIC shall be final and binding to the Contractor
2. The Notice inviting tender, general instruction to bidders and all other documents of
this tender shall form part of the contract
3. No receipt for any payment alleged to have been made by a Contractor in regard to
any matter relating to tender of the contract shall be valid and binding on the
Corporation unless it is signed by the Engineer-in-Charge.
4. As per provisions of Income Tax Act, Corporation shall deduct Income Tax at the
applicable rate.
5. Agency has to note that the extension of Time limit/excess saving in the works if
required to approve, than it shall be processed as per the provision of DoP and will
take time for process the same.
6. The contract is inclusive of the cost of materials required to complete the work in
7. It will be absolutely incumbent on the contractors to have on the site of work only
such of the materials as have been duly passed by the Engineer-in-charge.
Materials that have been rejected must on no account be allowed to remain on the
EW- 279 PUR-F-006 RFQ-76356
site, and in spite of written order to do so, any such rejected materials is on the
site beyond a period of 48 hours‟ notice, the Engineer-in-charge shall have the
right to remove it, at the risk and cost of the contractors and even to destroy it.
8. It must be distinctly understood that conditions of contract and of claims in
respect of extra work, will not be allowed unless the works to which they relate is
clearly without the spirit and meaning of the specifications or unless such works
are ordered in writing by the Engineer-in-charge and claimed for in specified
9. Contractor will be asked to present the sample of materials, and the approved
samples will be preserved at the site of work, and no change in the approved
sample will be allowed, without the written permission of the Engineer-in-charge.
10. The department reserves the right to make any change in the design and the
plans of the works. The contractor shall be bound to carry them out at the rates
tendered. No claim or compensation will be allowed on this account.
11. The contractor shall keep instruction book on site, for taking site instructions
from time to time. This book shall be made available on site whenever asked for.
12. Above construction equipment brought to site shall be allowed to be taken out
only after the work for which it has been brought is over. The equipment shall be
taken out only with the specific permission in writing from the E.I.C. Only the
equipment required for the work and in fit condition shall be brought to the site.
The Contractor shall ensure that proper documentation is followed at entry gate of
GSECL's premises for such items which shall be carried back by Contractor after
completion of work.
13. The Contractor shall provide all temporary ladders, scaffolding materials,
platforms, supports and other necessary facilities required for trimming & cutting
of trees. The Contractor shall provide sufficient, strong and safe staging so as to
ensure safety of the laborers.
14. The Contractor shall provide sufficient fencing, notice Corporations and lights to
protect and warn others as may be considered necessary by the GSECL and safety
authority.
15. The GSECL may during the progress of work, order the removal of part or whole of
the work executed, found not in accordance with the approved drawings,
specifications/ instructions. No extra claims shall be entertained for re-executing
or altering of such work.
16. On completion of the work, the site shall be left in good order and the excess
materials, scraps, debris, if any shall be removed and dumped by the Contractor
at place/places as designated by the GSECL. The Contractor shall also dismantle
and remove the staging and other temporary facilities like stores, offices, labor
camp etc. on completion of work.
17. Contractor is required to maintain proper records at site of work in addition to
normal routine requirement of own office. The records to be maintained shall
include but not limited to the following:
(a) Daily Progress Record.
(b) Work Site Order Book.
(c) Instruction by GSECL's Officers.
(d) Test Registers of other materials/fittings, fixtures, equipment as stipulated
in the tender.
(e) Register for Working Details.
(f) Log Book of Defects.
(g) Hindrance Register giving details of commencement and removal of each
hindrance.
(h) Supply and consumption registers of all materials shall be maintained.
(i) Day to day Record of used/received materials shall be entered in the register
and signed by the Site Engineer of the GSECL as well as contractors'
representative at site.
(j) Measurement Book.
EW- 279 PUR-F-006 RFQ-76356
77. SALES TAX ON WORK CONTRACT
The Gujarat Government by its amendment to the Gujarat sales tax act has
also made works contract subject to Sales Tax. However works contract tax
shall be liability of the contractor and shall be born by the contractor. More
ever you shall also have to submit form No 702 as prescribed by Gujarat
Sales Tax act while submitting invoice.
More ever the purchaser will not pay any composite tax/turnover tax/works
contract tax which contractor has to pay as per act. Hence the incidence of
sales tax or such type of taxes shall not be payable by the purchaser in any
case even if such taxes are levied on the party/contractor at a future date.
For & On behalf of GSECL
CHIEF ENGINEER (Gen)
GSECL: GTPS
SIGNATURE OF CONTRACTOR
EW- 279 PUR-F-006 RFQ-76356
TERMS AND CONTRACT FOR WORKS
GENERAL SAFETY RULES
LIST OF SAFETY TOOLS
EW- 279 PUR-F-006 RFQ-76356
TENDER & CONTRACT FOR WORKS
I/We hereby tender for the Gujarat State Electricity Corporation Ltd. (herein Referred
as “Corporation”) of the work specified in the underwritten memorandum within the
time specified in Schedule B (memorandum showing items of work to be carried out)
and in accordance, in all respect, with the specifications, design, drawings and
instructions in writing and as per annexed conditions of contract and agree that when
the materials for works are provided by the Corporation, such materials and rates to
be paid for them shall be as provided in Schedule A hereto.
MEMORANDUM
(a) General description of work : “Providing & fabricating the trench
cover for trenches of unit 3, 4 & 5 at GTPS”
(b) Estimated cost : Rs. 24, 97,452.20/-
(c) Earnest money : Rs. 74,924.00/-
(d) Security deposit : As per cl. no.7 of Section C (i.e. General
condition of contract).
(e) Time allowed for the completion of work from date of written order to commence.:
06 (Six Months)
Should this tender be accepted, I/We hereby agree to abide by and fulfill all the terms
and provision of the conditions of contract annexed hereto as applicable and in default
thereof forfeit and pay to the Corporation, the sums of money mentioned in the said
conditions.
Receipt No. Date from the Gujarat State Electricity Corporation Ltd. in respect of the
sum of Rs____________________________________. (The amount to be specified in
figures and words) is herewith forwarded representing the earnest money (the full
value of which is to be absolutely forfeited to the Corporation, should I / we do not
execute / commence the work after issuance of date of commencement by
Signature of the Contractor:
Address of the Contractor:
Dated__________________ day of _______________year
Signature of Witness:
Address of the Witness:
Occupation:
Dated__________________ day of _______________year
The above tender is hereby accepted by me on behalf of the Gujarat State Electricity
Corporation Ltd.
For & On behalf of GSECL
Chief Engineer (Gen)
GSECL GANDHINAGAR TPS
his duly authorized Assistant
EW- 279 PUR-F-006 RFQ-76356
General Safety Rules & List of Safety Tools.
“GENERAL SAFETY RULES / NORMS” TO BE OBSERVED BY THE CONTRACTORS
All the contractors working in Gujarat State Electricity Corporation Limited Factory
like Coal/Lignite/Gas/Hydro/Pumping Station shall have to strictly observe the
following Safety Rules. Concern principle contractors are responsible for informing &
observance of these rules by their supervisors/contract workers as well as the
owner/supervisors/ workers of sub-Contractors engaged, if any, by them for the work
contract awarded to them. Prior to commencement of the work, Contractor shall have to
submit a written assurance on their letterhead to the concerned Sectional Head /
Engineer-in-charge that they have thoroughly gone through these Rules, have educated
their employees / workers of their sub contractor and will strictly observe the said
Rules while execution of work under work contract awarded to them. They will have to
indemnify the company for any loss or damage / accident / injury to the company‟s
property / employee or employee of their own in default of non - observing these rules.
(01) Contracto r should issue photo gate pass for their workers fro m
GSECL Factory M anager as per G ujarat Facto ries rules, 1963 &
details shall be filled up in GSECL gate pass fo rmat as per Aadh ar
card /Election card id proof & to follow the gate pass issue procedure
through concern department EE & SE, Security Officer, LWO/IRO/DGM, Factory
Medical Officer, Safety Officer/Dy. Safety Officer & Factory Manager.
(02) In case of emergency, temporary photo gate pass shall be issued by Security
Officer only for three days with prior permission of Factory Manager only. More
than three days, Permanent photo gate pass procedure shall be completed by
contract agency for their contract workers.
(03) Certificate of Fitness of employment in hazardous process & operations in form
no.33 of Gujarat Factories rules, 1963 shall be issued by GSECL Factory Medical
Officer for all contractor workers before commencement of work & examination
responsibility shall be taken by contractor as well as concerned Head of
Department .Pre-employment & Periodical medical examination of contractor
workers shall be carried out in form no.32 from GSECL Factory Medical Officer
after every six (06) months of contractor with their contractor workers. Contractor
shall be fulfilled all health requirements before commencement of work. After
completion of medical examination in form no.32/33, GSECL Factory Medical
Officer shall be signed in contract worker gate pass procedure format.
(04) Contract worker gate pass will issue after completion of safety induction 3D
animation movie & Training record is to be maintained in IMS/OHSAS training
format by TK Office/LWO.
(05) As per Gate pass format of GSECL, Safety Officer/Dy. Safety Officer shall be
checked the issue PPE to contract workers as per nature of job, Form no.10 of
lifting tools and tackles, Driving license, Electrical contractor license, Electrical
trade qualifications, Safety induction training, SOP, supervisor qualifications etc.
After fulfillment of all Safety compliances, Safety Officer/Dy. Safety Officer shall be
signed in Contract worker Gate pass procedure format.
(06) Work Contract shall be completed by principle contractor/agency/person who is
awarded the work order. Subletting of contract shall be allowed only if prior
approval of Power station chief before execution of work. Contractor/agency shall
be submitted the entire subletting contract documents with gate pass application
through concern department EE & SE, LWO/DGM, Safety Officer/Dy.Safety
Officer & Factory Manager.
(07) Under The Conditions Framed Under Rule-45 Of The Indian Electricity Rules,
1956, Valid Electrical contractor License shall be submitted to concern electrical
department EE/SE/Electrical Safety Officer/ Safety Officer/Factory Manager at the
time of apply gate pass by agency/party with latest renewal from Chief Electrical
Inspector, Gandhinagar- Gujarat. Electrical License photocopy shall be checked by
Concerned HOD of Electrical Department/Electrical Safety Officer/Dy.Safety
Officer/ Safety Officer/Factory Manager.
(08) As per nature of job/work, qualified supervisor (Diploma (Electrical/
Mechanical/Civil/C&I) + 3 years experiences or ITI + 10 years) shall be engaged by
EW- 279 PUR-F-006 RFQ-76356
contract agency & qualification certificate with experience certificate shall be
submitted to concern EE/SE/LWO/IRO/DGM/ Dy. Safety Officer /Safety
Officer/Factory Manager at the time of apply gate pass.
(09) As per rule 3 of CEA regulation ,2010: Designating person(s) to operate and
carry out the work on electrical lines and Apparatus, Contract person/worker
possesses a certificate of competency or electrical work permit, issued by the
Appropriate Government. That means, Electrical trade Qualification of contract
worker/person like ITI-wireman/ Electrician, Diploma (Elect), BE/B. TECH (Elect),
ME/ M. TECH (Elect) shall be submitted to concern EE/SE/LWO/IRO/DGM, Dy.
Safety Officer/ Safety Officer/Factory Manager at the time of apply for photo gate
pass procedure.
(10) As per nature of job/work & during capital overhauling work /Annual overhauling
work /24X7 round the clock work/major shut down work, Qualified Safety
Officer/Manager/Supervisor (BE/Diploma (Elect/Mech./Civil) + PDIS-Post Diploma
in Industrial Safety) shall be engaged by contractor during dangerous
operations/dangerous works as well as day to day dangerous activities, safety
supervision, tool box talk, Safety awareness programme, SOP preparation with
hazards & its control measures with each step , checking of lifting tools & tackles,
hydra mobile crane, Safety precautions, coordination with Safety Department etc.
(11) License of driver shall be submitted with gate pass issue application as per nature
of vehicles & to follow the Motor vehicle Act,1988, the Central Motor Vehicles
(Amendment) Rules,2016 as well as Gujarat Motor Vehicles rules,1989 & driver
license shall be checked every day by security shift in charge before entry in the
Factory premises.
(12) SOP with JSA (Job Safety Analysis) shall be prepared by contractor through
competent person as per GFR, 1963 or Qualified Safety Officer as per GFR,
with 05 years experiences. SOP will review & approve by concern
JE/DE/EE/SE/Elect. Safety Officer/Dy. Safety Officer /Safety Officer/Factory
Manager before execution of work.
(13) It is compulsory to use standard make Personal Protective Equipments (P.P.Es.) as
per the job requirement. Do not work without use of required P.P.Es. Contractor is
responsible to provide standard make (ISI/DGMS/CE/EN/ANSI approved) & to
checked standard/make in PPE issue format by concern JE/DE/EE/SE/Safety
Officer/Factory Manager. Personal Protective Equipments / Safety Gadgets suitable
to give sufficient protection against hazards involved in their work / job to their
staff, as per the job requirement and insist / enforce their workers to put on the
same while at works.
The ongoing work is liable to be stopped at any time if your contract workers/staffs
found working without P.P.Es. Following is the list of various P.P.Es (as per
ISI/DGMS/CE/ EN/ ANSI approved only) to be used for various works / worksites.
In any work, Contractor shall be issued the minimum 05 nos. of PPEs like Safety
Shoes, Safety Helmet, Safety goggles, Mask & Reusable Ear plug to their
workers/supervisor compulsory & it will check by concern section HOD & Dy.
Safety Officer /Safety Officer at the time of gate pass procedure.
Industrial Safety Helmet For protection of head against falling objects or
during fall of person from height. Yellow Colour
helmet is used for contract worker with agency
Safety Goggles/welding For protection of eyes against flying particles / dust,
goggles/chemical splash chemical splash, welding spark, arc, flashover etc.
Full Face shield For protection of face against flying particles / dust,
chemical splash, spark, arc, flashover etc.
Reusable Earplug / Ear For ear / hearing system protection while working
muffs. in high noise level area.
Chemical suit/Gas tight suit For body protection against chemicals, oils, sharp
/Fire proximity suit/FR edged objects, heat, hot objects etc.
Boiler Suit
Safety Hand Gloves For protection of hands against chemicals, oils,
sharp edged objects, heat, hot metals/objects,
EW- 279 PUR-F-006 RFQ-76356
electricity etc.
Safety shoes/ Gum Boots For protection of leg/feet against falling objects,
with sharp edged objects, heat, hot metals/objects,
Oil/Chemical/water/heat/ electricity etc..
Electrical resistance etc.
Safety Belt(full body For fall prevention while working at heights or in
hardness with double depth, working in vessel or in confined space.
lanyard & shock absorber) /
Rope / Life line / Fall
arrestor etc.
Dust Mask/Respirator with Protection of respiratory system against dust.
valve(FFP2)
Chemical Cartridge Protection against toxic chemical fumes /
Respirator with full face gases/vapors/dust etc.
mask type A2B2E2K2
Trolley mounted Air line Working in oxygen deficient zone or confine space
respirators with full face area
Portable Single gas detector Working in hazardous storage/process area
like Chlorine, Ammonia,
Hydrogen, etc
Portable Multi gas Detector Working in oxygen deficient zone & use in entry of
( LEL,O2,CO,H2S,SO2, etc) confine space & Major fire
Automatic voltage detector To check the present voltage or induction voltage of
electrical equipments/ bus/switch gears from
(one) feet distance before starting the any electrical
Auto darkening welding The new auto darkening welding helmet combines
helmet (EN 379 & EN 175 legendary Speed glass quality and auto darkening
Level-B) with PAPR as per technology with an innovative wide-view grinding
EN 12941:1998, class TH2 visor to give welders an all-in-one solution for more
and AS/NZS 1716 flexibility, precision, and efficiency.
Respiratory System is a combined face and
breathing protection device, for increased comfort
and safety in welding. The unit is equipped with a
particle filter which removes particles from the air.
The unit provides a constant airflow independent of
filter combinations and clogging. The unit can also
be equipped with a gas filter (for example A1B1E1).
The unit supplies air to the head top via the
connecting breathing tube. The airflow creates a
slight positive pressure which together with the
sealing to the face prevents particles and other
contaminants from entering the head top.
(14) All PPEs (as per ISI/DGMS/CE/EN/ANSI approved only) Should issued by
party/agency/contractor to their contractor workers as per nature of job and
allotment of PPE list shall be submitted to Safety Officer, Dhuvaran on his letter
head as per below mentioned format by Contractor before commencement of work
through concerned JE,DE,EE/SE .
Sub: Issue of PEE to Contractor workers
Sub of work Order:
Work order no.
Name of Agency:
Date of Commencement:
Time limit for work order:
EW- 279 PUR-F-006 RFQ-76356
Sr. Name Desig Name of Name of PPE IS Make Qty Un Date Receivin
no. of natio Section :Code of it of g
worke n under no. of PPE issu signatur
rs work PPE e e
Safety Helmet No
Safety goggles No
Reusable Ear Pai
Dust Mask No
Safety Shoes Pai
(15) Shift Security Inspector/Security Officer shall be checked Safety Shoes & Safety
Helmet of all contractor workers at entry gate of Factory Premises & shall entered
contractor workers with Safety Shoes & Safety Helmet with photo ID Gate Pass.
(16) Shift Security Inspector/Security Officer shall be checked validity of Gate pass of
all contractor workers on daily basis.
(17) During the work execution, one trained & competent supervisor of agency should
always remain present at work site. Concern JE/DE of GSECL shall be supervised
the contract work as per SOP .
(18) Approved NABL laboratory calibration certificates of
electrical/mechanical/Civil/C&I/Environment survey/Chemical etc measuring
/testing equipments/instruments which are used during contract work shall be
submitted before starting the work & shall be checked by concern JE/DE/EE
before starting work & it‟s record shall be maintained in concern section.
(19) The contractor shall take all the required safety measures prior to commencement
of work on dangerous substances, machineries or area at which cautionary notice
is displayed and obtain “Line Clear” or “Work Permit” through the concern
Department / Section JE/DE and shall be informed to concern section JE/DE for
closed/ returned after completion of work.
(20) Safety talk/Safety work instructions shall be given to contractor workers by
concern JE/DE regarding hazards of specific work, risk & it‟s control measure
(mentioned in HIRA) before starting the job work and records shall be maintained
for each & every job works.
(21) Display Safety instructions shall be strictly followed by all workers who are working
in factory premises.
(22) Material Safety Data Sheet (MSDS) of each chemical shall be available with Chief
Chemist/Control room & work related Chemical information shall be taken by
contractor & contractor workers from Concern EE/Chief Chemist before starting of
chemical handling work.
(23) The contractor shall be checked & securely covered or securely fenced any opened
fixed vessel, sump, tank, pit or opening in ground or in floor which, by reason of its
depth, situation, construction or contents ,is or may be a source of danger before
starting the work each & every days or after interval/recess. Contractor supervisor
shall be informed to concerned HOD regarding any unsafe conditions.
(24) Prohibition of smoking, fires, lights, spontaneous ignition substance, matches;
fuses, mobile phone etc are to be strictly followed by all workers who are working in
factory premises.
(25) Prior to carrying out welding, gas cutting, furnace heating or any other hot work
job, remove all the inflammable material lying at or nearby worksite or cover it
properly by suitable protective covering. Also, special care shall be taken before
carrying out such job & see that all possible contributing factors to set fire shall be
removed / vanished prior to commencement of the work. Advance intimation shall
be given to concerned section / fire section to commence the work in fire prone
areas. They should also keep ready all the First Aid Fire Extinguishers /
equipments & fire extinguishing media / material like sand / water buckets or
other appropriate equipment at such place.
EW- 279 PUR-F-006 RFQ-76356
(26) While carrying out work in confined space or inside vessel, obtain necessary
“Confined Space / Vessel Entry Permit” from concerned department prior to
commencement of the work.
For lighting in such areas, only 24-volt (ISI certified & with proper guard) hand
lamp shall be used. For taking care of the persons working inside the confined
space / vessel, a supervisor / person capable to keep continuous watch on
person(s) working inside, assist them in case of emergency or arrange to get
immediate outside help, shall remain present at entry point. Use full body safety
belt without failed.
While working inside sewage, trench or in-depth, a person to warn outsiders /
entrants / passers etc shall remain available near entry point or the entry point
shall be cordoned by a barricaded tape with a cautionary notice. After completion
of the works, all the lids / covers / grills / grits opened, shall be re-fixed / re-
placed in the original position as it were prior to commencement of the work and
leave the work place in safe condition in all respect, so as to prevent accident to
fellow workers.
(27) The contractor shall see that he / his persons do not work on or block (by stacking
material, spare parts, tools-tackles, equipments etc), any passages / walkways /
gangways / aisles / staircases / ladders / lifts or any other approaches / roads
leading to plans or its auxiliaries, on which there is traffic movements or possible
traffic movements in case of emergency. Such passages are meant for safe escape
in the event of emergency. If it is utmost necessary to carry out work in such area
with blocking of passage, prior permission of Competent Authority or the Engineer-
In-Charge shall be obtained. To demarcate / declare the area as “UNSAFE”, cordon
it using barricading tape & display suitable caution notice or keep a person to
restrict / divert the traffic on this route through other safe passage.
(28) The contractor shall see that he / his persons do not work on or block (by stacking
material, spare parts, tools-tackles, equipments etc), any passages / walkways /
gangways / aisles / staircases / ladders / lifts or any other approaches / roads
leading to plans or its auxiliaries, on which there is traffic movements or possible
traffic movements in case of emergency. Such passages are meant for safe escape
in the event of emergency. If it is utmost necessary to carry out work in such area
with blocking of passage, prior permission of Competent Authority or the Engineer-
In-Charge shall be obtained. To demarcate / declare the area as “UNSAFE”, cordon
it using barricading tape & display suitable caution notice or keep a person to
restrict / divert the traffic on this route through other safe passage.
(29) Prior to use power / electrically operated hand tools / equipments / machines /
gadgets like welding machine, hand grinder, hand drill etc, ensure for its safe
operation & use it only if it is found safe to use. Do not use defective, unsafe or
improperly maintained equipments.
The electrical power supply required to run such equipments shall not be taken
directly at their own but shall be obtained through concerned Electrical
Maintenance Departments or their authorized persons or under their observations
/ guidance only. The Electrical Section shall provide temporary electrical
connection up to contractor‟s Mains Board on which it is compulsory to install
mains switch, ELCB & fuses of adequate capacity. All such equipments shall
invariably be earthed adequately to prevent electrical shock, sparking, short circuit
etc. Power cord to be used shall be of adequate capacity, without any joint & shall
consist of earth wire also. Hence, it is necessary to use adequate capacity 3-wire
power cord for single & 5-wire power cord for three phase power connections. The
plugs, receptacles, pins, holders etc shall be of adequate capacity & safe to use.
All electrical & mechanical equipments / tools-tackles viz. welding machine, cutting
machine, Grinder, Drill, Chain Pulley Blocks, Hook chooks etc required to be used
during work execution shall be of standard make & bear ISI certification mark on it.
The consumables like welding electrodes, grinding wheels / discs etc which has
specific prescribed life span shall not be used in any case if its expiry date is over.
(30) Non-Sparking Non-Magnetic electrical hand tools and tool kits shall be used by
Electrical contractor for safe use in areas where hazardous, flammable, or
combustible vapors, liquids, dusts, or residues may be present in Gas Based
power plant and list of tools and tackles shall be submitted with technical bid.
EW- 279 PUR-F-006 RFQ-76356
Non-Sparking Non-Magnetic electrical hand tools and tool kits shall be checked by
JE/DE before commencement of Electrical work.
(31) Before using lifting machines / tackles (like C.P.Bs., Hook chooks, winch, forklift,
mobile crane, EOT crane etc) & its attachments (like D-shackles, slings, U-clamps,
Eye bolts or any fixtures), it shall be checked and used only if found safe to use.
Also, ensure that these are tested, examined & certified in form no.10 by
Competent Person as per the Factory act-1948 & Gujarat Factories Rules and its
validity do not expire. Further, it shall be fixed properly and firmly prior to lifting
the weight. Valid Test certificate of all Lifting machines used by Contractor to
be submitted to Dy.Safety Officer/ Safety Officer before commencement of
work through concerned EE/SE.
(32) Metal Scaffoldings to be used for working at height shall be of adequate size &
capacity. Obtain the work permit when working at height. While climbing on such
scaffolding or working on any structure at height, use of full body safety belt /full
body hardness with double lanyard & Fall arrestor & Helmet is compulsory. It is
also necessary to fasten chinstraps of the helmet.
(33) Contractor or their employee shall not interfere in day-to-day routine plant
activities / works except the work assigned to them, shall not loiter in the areas
other than their work jurisdiction, as well as shall not temper / operate / touch the
machineries/equipments/auxiliaries with which they are not concerned. Also, the
contractor shall strictly instruct their staff for not to sit or take rest at/near/below
running plants, auxiliaries, systems or any place which is risky, hazardous &
prone to accident.
(34) The cylinders containing poisonous / toxic or inflammable / explosive gas like
Oxygen, Acetylene, LPG, Hydrogen, Ammonia, Chlorine, CO 2 etc shall be handled
safely taking due care. To handle / shift such cylinders a special trolley /cage
meant for it must be used but in no case it should be rolled.
(35) In Gas Based Power station/Hydrogen storage area /Hydro carbon fumes-vapour
generated area, Spark arrestor (as per approved manufacturer of CCOE, Nagpur)
shall be provided on each vehicle by party/agency and it will check by shift
security in charge before entry of vehicles in the factory premises.
(36) No women or young person shall be employed or permitted to work in Lead-
compound area like battery room etc. as per schedule VI of GFR
(37) No women or young person shall be allowed to clean, lubricate or adjust any part of
a prime mover or of any transmission machinery while the prime mover or
transmission machinery is in motion. Examination or operation of motion
machinery shall be made or carried out only by a specially trained adult male
worker wearing tight fitting clothing as per section 22 of factories act
(38) In all risky job, before start the work, contractor should obtain General Safety
Work Permit through concerned section from Shift –in-charge well in advance.
(39) In case of noticing smoke or fire during their work execution, they shall make
immediate efforts to extinguish / control it and simultaneously inform the Fire
Station Mobile No as well as Station Fire Officer or Emergency Control room no
which is displayed at prominent place of factory like Main Security Gate, All unit
control room, Canteen area, Safe Assembly points, Fire Station, All security gates,
Occupational Health Centre.
(40) In case of any injury / accident while working, it shall immediately be reported to
Safety Department through concerned Sectional Head / Engineer. The prescribed
Form No. 21 & ANNEXURE may be obtained from concerned section or Dy.Safety
Officer/Safety Officer.
In case of any electrical accident, it shall immediately be reported to Electrical
Safety Officer through concern Sectional Head / Engineer. The prescribed
Electrical accident form no. A as per electricity act-2003 & Form No. 21 &
ANNEXURE as per Gujarat Factories rules shall be filled up by concern
department JE/DE with written consent of contractor. The Form may be obtained
from concerned Electrical section or Electrical Safety Officer. Electrical accident
investigation shall be carried out by Electrical Safety Officer with Factory Manager.
After any reportable accident, Contract agency shall be submitted the fitness
certificate of injured person with endorsement of GSECL factory Medical Officer to
LWO/Dy.Safety Officer/Safety Officer/Electrical Safety Officer then after injured
person may allow for work.
EW- 279 PUR-F-006 RFQ-76356
(41) For any incident occurred but have no injury to any persons should also reported
as per GSECL format and informed to Dy.Safety Officer/Safety Officer as Near Miss
(42) Safety penalty shall be imposed against violation by contract workers: if any
contract worker worked in a factory contravenes any provision of factories act or
any rules or orders made there under. Imposing any duty or liability on workers,
contractors/agency shall be punishable with fine which mentioned as under.
Sr. Description of penalty Amount
(i) Work without PPEs Rs.300/- per person
(ii) Work without work Safety permit like working at Rs.1000/- per day
height, confine space entry, hot work etc.
(iii) License of driver as per type of vehicles not registered. Rs.750/- per person
(iv) Welding work without flashback arrestor/double Rs.1000/- per set
gauge regulator set
(v) Operate Portable power tool without ELCB Rs.1000/-per
(vi) Work without qualified Supervisor as per nature of job Rs.1000/-per day
like mechanical, electrical, civil, C&I, chemical etc.
(vii) Work without SOP & JSA Rs.2000/-per day
(viii) Work without test report of lifting machines / tackles Rs.2000/- per
(like C.P.Bs., Hook chooks, winch, forklift, mobile equipment
crane, EOT crane etc) & its attachments (like D-
shackles, slings, U-clamps, Eye bolts or any fixtures)
in Form No.10 of Gujarat Factories Rules,1963
(ix) Work without Double lynyer Safety belt during Rs.3000/-per
working at Height work, work without anchoring in person
hook/line line
(x) Work without 24 Volt supply in Confine space area Rs.3000/-per
(xi) (a) Grinding machine used without safety guard/ Rs. 500/- per
machine guard equipment/ per set
(b) Unsafe welding machine like open body. Knob
without insulation. Connection without plug
(c) Damaged welding cables/gas pipelines
(d) Welding work doing without welding blanket.
(e) Electrical supply without 3 pin plug/industrial
(f) Use of damaged electrical wire for
lighting/equipments.
(g) Use of lighting lamp without cage.
(h) Use of open halogen tube.
(i) Use of damaged PPEs/use of non standard PPEs
(j) Unsafe lifting and handling of gas cylinders
(k) Cylinder handling without safety cap
(l) Temporary connection without ELCB. etc
During plants visit/supervision of concern JE/DE/EE,SE. Safety officer/Dy. safety
officer. Electrical safety officer , factory manager, if they will observed any safety
violations as per CO circular/statutory requirements then they must imposed
safety penalty through office note directly against contract workers/contract
agency and Office Note process through proper channel to concern sectional head
and Account head for recovery purpose. Photograph/CCTV Footage is to be put a
with penalty note by imposing officer.
(43) Party will damage any fire equipments or property or machinery in factory during
execution of work, total damage cost will be recovered from party RA bill and
recovery Office note put up by concern HOD.
(44) All the relevant labour and industrial laws shall also be followed compulsorily.
EW- 279 PUR-F-006 RFQ-76356
(45) After completion of work, cotton waste, grease, oil, unused material, welding rod
pieces, scrap etc. are to be removed by contractor and scrap shall be deposited to
scrap yard of Main Store.
(46) For performance evaluation of contractor, safety factors of work accident, fire
incident & near miss accident will be considered. Steps can be taken to review the
job assignment up to cancellation for negligence.
(47) Over & above these, contractor shall have to follow all the safety requirements
/rules & regulations / norms and legal provisions laid down in various statutes.
Particularly the provisions of The Factories Act-1948 & the Gujarat State Factories
Rules-1963 (Amended up to date), The Electricity Act-2003 & rules, BOCW
Act/Rules shall be followed strictly. The contractor shall also obey the rules /
regulations / instructions of the local Competent Authority for safety & health
requirements.
(48) The above rules shall be scrupulously followed and where required, Contractor
/contractor workers may contact to the Dy. Safety Officer/Safety Officer/Electrical
Safety Officer in case of any ambiguity or needs further guidance in this regard.
(49) Medical Health check up guidelines:-
As per C.O circular No. GSECL/Medical/PME/O1 DTD.16.07.2019 i.e. for
procedure for health check-up accordingly bill shall be reimbursed once during
total contract period (for as & when and AOH/COH contract) maximum up to
Rs.1000 or actual cost per worker/ labour /person, whichever is minimum after
verification & recommendation by concern doctor.
In case any worker left the work in between than for replacement Worker Company
will not provide any reimbursement, however it is compulsory to submit new report
of replacement worker for fitness certificate at contractor‟s own expense.
For & On behalf of GSECL
CHIEF ENGINEER (Gen)
GSECL: GTPS
SIGNATURE OF CONTRACTOR
EW- 279 PUR-F-006 RFQ-76356
PERFORMA FOR BANK GUARANTEE
INTEGRITY PACT
CERTIFICATE – A
ANNEXURE - I
EW- 279 PUR-F-006 RFQ-76356
ON STAMP PAPER OF Rs.300/-
FORM OF BANKER’S UNERTAKING
(For Security Deposit for work period as per Terms and Conditions of
We, Bank of ______________________________________________ hereby agree unequivocally
and unconditionally to pay immediately on demand in writing from the Gujarat State
Electricity Corporation Limited, or any Officer authorized by it in this behalf any
amount up to and not exceeding Rs.__________ (in words) Rupees
to the said Gujarat State Electricity Corporation Limited on behalf of
M/s.___________________________________________________ who have entered into a
contract for the supply / works specified below :
L.O.I. No. _____________________________________________________ dated ______________.
This agreement shall be valid and binding on this Bank up to and inclusive
of________________ and shall not be terminable by notice or by change in the
constitution of the Bank or the firm of Contractors / Suppliers or by any other reason
whatsoever and our liability hereunder shall not be impaired or discharged by any
extension of time or variations or alterations made, given conceded or agreed, with or
without our knowledge or consent, by or between parties to the said within written
Notwithstanding anything contrary contained in any law for the time being in force or
banking practice this Guarantee shall not be assignable, transferable by the beneficiary
(i.e. GSECL or Subsidiaries). Notice or invocation by any person such as assignee,
transferee or agent of beneficiary shall not be entertained by the Bank. Any invocation
of the Guarantee can be made only by the beneficiary directly
“NOT WITHSTANDING” anything contained herein before, our liability under this
guarantee is restricted to Rs._______________ (Rupees
_______________________________________________________ only). Our guarantee shall
remain in force until _______________ (date of validity of the Guarantee). [Unless
demands or claims under this Bank Guarantee are made to us in writing on or before
_____________ (date of validity of the Guarantee), all rights of Beneficiary under this
Bank Guarantee shall be forfeited and we shall be released and discharged from all
liabilities there under]:
Please Mention here Complete Postal Signature of
Address of the Bank with Branch Code, Bank‟s Authorized Signatory
Telephone and Fax Nos. with Official Round Seal
EW- 279 PUR-F-006 RFQ-76356
NAME OF DESIGNATED BANKS: (Annexure – I.)
A Guarantees issued by following banks will be accepted as SD/EMD on
permanent basis.
1. All Nationalized Banks.
B Guarantees issued by following Banks will be accepted as SD/EMD for
period up to March 31, 2026. The validity cut-off date in the GR is with
respect to date of issue of Bank Guarantee irrespective of date of
termination of Bank Guarantee.
1. AXIS Bank
2. A U Small Finance Bank
3. Bandhan Bank
4. Barclays Bank
5. City Union Bank
6. CSB Bank
7. DBS Bank India Limited
8. DCB Bank
9. Equitas Small Finance Bank
10. ESAF Small Finance Bank
11. Federal Bank
12. HDFC Bank
13. HSBC Bank
14. ICICI Bank
15. IDBI Bank
16. IDFC First Bank
17. Jammu and Kashmir Bank
18. Jana Small Finance Bank
19. Karnataka Bank
20. Karur Vysya Bank
21. Kotak Mahindra Bank
22. South Indian Bank
23. Standard Chartered Bank
24. Tamilnadu Mercantile Bank
25. Utkarsh Small Finance Bank
26. Yes Bank
27. Ahmedabad Mercantile Co-Operative Bank
28. Nutan Nagrik Sahakari Bank Ltd.
29. Rajkot Nagrik Sahakari Bank Limited.
30. Sarswat Co-Operative Bank Ltd.
31. SBPP Co-operative Bank LTD
32. SVC Co-Operative Bank Ltd.
33. The Cosmos Co-op Bank Ltd.
34. The Gujarat State Co-Operative Bank
35. The Mehsana Urban Co-Operative Bank Ltd.
36. The Surat District Co-operative Bank
37. The Surat Peoples Co-operative Bank Ltd.
38. The Kalupur Commercial Co-operative Bank
39. The Panchmahal District Co-operative Bank
40. The Baroda District Co-operative Bank
41. Baroda Gujarat Gramin Bank
42. Saurashtra Gramin Bank
EW- 279 PUR-F-006 RFQ-76356
EMD BANK GUARANTEE FORMAT
FOR TENDER /ENQ. NO. ___________________________________
(BANK GUARANTEE ON NON-JUDICIAL STAMP PAPER OF Rs.300)
WHERE AS M/s. _______________________________________________________________
(Name and Address of the Firm) having their registered Office at
_________________________________________________(Address of the Firm‟s registered
Office) (hereinafter called the Tenderer) wish to participate in the Tender
No.__________________________ for______________________________________ of (supply /
Erection / Supply & Erection / Work) of __________________________________ (Name of
the material / equipment / work) for _________________________ Gujarat State Electricity
Corporation Limited and WHEREAS a Bank Guarantee for (hereinafter called the
“Beneficiary”) Rs. _____________ (Amount of EMD) valid till ____________ (mention here
date of validity of this Guarantee which will be 4 (FOUR) months beyond initial validity
of Tender‟s offer) which is required to be submitted by the Tenderer along with the
(Name of the Bank and address of the Branch giving the Bank Guarantee) having our
registered Office at _____________________ (Address of Bank‟s registered Office) hereby
give this Bank Guarantee No. _________________dated ____________ and hereby agree
unequivocally and unconditionally to pay immediately on demand in writing from the
Gujarat State Electricity Corporation Limited or any Officer authorized by it in this
behalf any amount not exceeding Rs.____________ (amount of EMD) (Rupees
______________________________________________________) (in words) to the said Gujarat
State Electricity Corporation Limited on behalf of the Tenderer.
We, ____________________________________________ (Name of the Bank) also agree that
withdrawal of the tender or part thereof by the Tenderer within its validity or non-
submission of Security Deposit by the Tenderer within one month from the date of
tender or a part thereof has been accepted by the Gujarat State Electricity Corporation
Limited would constitute a default on the part of the Tenderer and that this Bank
Guarantee is liable to be invoked and encased within its validity by the Beneficiary in
case of any occurrence of a default on the part of the Tenderer and that the encased
amount is liable to be forfeited by the Beneficiary.
This agreement shall be valid and binding on this Bank up to and inclusive
of____________________ (mention here the date of validity of Bank Guarantee) and shall
not be terminated by notice or by Guarantor change in the constitution of the Bank or
EW- 279 PUR-F-006 RFQ-76356
the Firm of Tenderer or by any reason whatsoever and our liability hereunder shall not
be impaired or discharged by any extension of time or variations or alterations made,
given, conceded with or without our knowledge or consent by or between the Tenderer
and the Gujarat State Electricity Corporation Limited.
Notwithstanding anything contrary contained in any law for the time being in force or
banking practice this Guarantee shall not be assignable, transferable by the beneficiary
(i.e. GSECL or Subsidiaries). Notice or invocation by any person such as assignee,
transferee or agent of beneficiary shall not be entertained by the Bank. Any invocation
of the Guarantee can be made only by the beneficiary directly.
NOTWITHSTANDING anything contained hereinbefore our liability under this
Guarantee is restricted to Rs. ________ (amount of EMD) (Rupees
________________________________________ (in words). Our Guarantee shall remain in
force till _____________ (date of validity of the Guarantee). Unless demands or claims
under this Bank Guarantee are made to us in writing on or before ___________ (date of
validity of the Guarantee), all rights of Beneficiary under this Bank Guarantee shall be
forfeited and we shall be released and discharged from all liabilities there under.
Please mention here complete Postal Signature of the
Address of the Bank with Branch Code, Bank‟s authorized
Telephone and Fax Nos. Signatory with Official Seal.
EW- 279 PUR-F-006 RFQ-76356
GUJARAT STATE ELECTRICITY CORPORATION LIMITED- GTPS
INTEGRITY PACT
OUR ENDEAVOUR
To create an environment where Business Confidence is built through Best Business
Practices and is fostered in an atmosphere of trust and respect between providers of
goods and services and their users for the ultimate benefit of society and the nation.
GSECL’S COMMITMENT PARTY’S COMMITMENT
To maintain the highest ethical Not to bring pressure recommendations
standards in business and from outside GSECL to influence its
professions. decision..
Ensure maximum transparency to Not to use intimidation, threat,
the satisfaction of stakeholders. inducement or pressure of any kind on
GSECL OR ANY OF it‟s employees
under any circumstances.
To ensure to fulfill the terms of To be prompt and reasonable in
agreement/contract and to consider fulfilling the contract, agreement, legal
objectively the view point. obligations.
To ensure regular and timely To provide goods and / or services
release of payments on due dates timely as per agreed quality and
for work done. specifications at minimum cost to
To ensure that no improper demand To abide by the general discipline to be
is made by employees or by anyone maintained in our dealings.
on our behalf.
To give maximum possible To be true and honest in furnishing
assistance to all the information.
Vendors/Suppliers/Service Provider
and other to enable them to
complete the contract in time
To provide all information to Not to divulge any information,
suppliers/contractors relating to business details available during the
contract / job which facilitate him course of business relationship to
to complete the contract / job others without the written consent to
successfully in time. GSECL.
To ensure minimum hurdles to Not to enter into carter / syndicate
vendors / suppliers / contractors in /understanding whether formal / non
completion of agreement / contract formal so as to influence the price.
/ work order.
Seal & Signature Seal & Signature
(GSECL‟s Authorized Signatory) (Party‟s Authorized Person)
Name : Name:
Designation:
Name : Name:
Designation:
EW- 279 PUR-F-006 RFQ-76356
On Firm’s Letter Head
CERTIFICATE - A
I / We ________________________________________________ authorized signatory of
M/s._________________________________________________here by Certify that
M/s. _____________________________________________ is not related with other firms who
have submitted tenders for the same items under this inquiry / Tender.
Signature of the Tenderer
Designation
Seal of the Firm
EW- 279 PUR-F-006 RFQ-76356
GENERAL GUIDELINES RELEVANT TO I.S.
EW- 279 PUR-F-006 RFQ-76356
GENERAL GUIDELINES RELEVANT TO IS
Please refer latest edition of relevant Indian Standard Specification of Code
i.e. B.I.S. General relevant I.S. of B.I.S. shall prevail for all items including
materials, measurements etc.
The Item wise detailed specifications are intended for full description of
items covered by Schedule “B”. The specifications are not however intended
to cover every detail and the works shall be executed according to the spirit
of the specifications below and the best prevailing P.W.D. practice. The
clarification to any clause in detailed specifications shall be sought from the
latest edition of relevant I.S. specification and codes. Where these
specifications are at variance with the specification laid down in the I.S.
Books stated above, the former will be applicable. As regarded matters not
covered by any of the above specification, the decision of the Engineer-in-
charge shall be treated as final and shall be binding upon the contractor.
The contractor is expected to get clarified any doubt about specification, etc.
before tendering by discussing with Engineer-in-charge.
For detail technical specification, the item wise description along with above
general specifications shall hold good.
For & On behalf of GSECL
CHIEF ENGINEER (Gen)
GSECL: GTPS
SIGNATURE OF CONTRACTOR
EW- 279 PUR-F-006 RFQ-76356
GENERAL SPECIFICATIONS
TECHNICAL SPECIFICATION
EW- 279 PUR-F-006 RFQ-76356
SPECIAL CONDITIONS FOR USE OF CEMENT IN WORK
1 The rates in Schedule – „B‟ is inclusive of cement cost. Contractor has to purchase fresh
grade cement confirming to as per IS 8112 Or PPC IS 1489 (Part-I) or as per tender condition.
2 Contractor has to construct pucca Go down at site of work so that cement bags can be properly
preserved to avoid damage due to any kind of water/Humidity.
3 Contractor has to bring sufficient quantities of cement bags to maintain progress of work. The
work should not suffer for want of cement.
4 Cement should be used to achieve required strength in cement concrete or as per item
proportion.
5 To bring sufficient & timely cement at site is full responsibility of contractor. Nothing extra will
be paid on account of any reason to maintain progress of work and to complete the work in
schedule time.
6 Contractor has to submit material A/c. For consumption of cement used with every bills. In
case of not submitting the same, bill will not be passed. Party has to submit the copy of cement
purchased bill and Challan/invoice along with each RA Bill/Final Bill.
7 No negative variation will be allowed for consumption in cement less then prescribed as per R &
B SoR OR Corporation/mix design and nothing will be paid extra for over consumption.
8 Contractor is fully responsible for safety of cement at site; nothing will be paid extra on account
of safety.
9 If Corporation‟s authorized representative wants to check cement stock at site, contractor has to
allow for the same at any time.
10 Contractor has to maintain day to day cement consumption / balance account at site.
11 As far as possible, contractor has to maintain supply of cement of only one brand & grade
throughout the work and on account of closer/shortage of approved brand, cement of other
brand in accordance of condition No. (1) Will be allowed by Engineer – in – Charge.
12 Minimum cement consumption considered for cement concrete having grade of M–15 / M – 20 /
M – 25 / is 320 Kgs. / 375 Kgs / 400 Kgs. respectively. Contractor has to use minimum cement
as above. Contractor should not use less than the prescribed quantities of cement even in the
case of mix design recommends lower quality. For other items cement consumption shall be as
per provisions of SoR without any negative variation. Nothing will be paid extra for over
consumption.
13 Contractor will be allowed to carry out work only after physical verification of cement brought at
14 Full cement bags brought by contractor shall be entered at IN GATE of GANDHINAGAR TPS.
EW- 279 PUR-F-006 RFQ-76356
Approved name of Manufacturers: Allowing using steel
cementing being supplied by contractors in civil works
Sr. Name of approved Cement Sr. Name of Approved Steel
No. Company & their Brand Name in No Manufacturers & their Brand Name
Market in Market
1 A.C.C. Cement A.C.C. 1 Tata Iron & Steel TATA
2 Ambuja Cement Ambuja 2 Jindal JINDAL
3 Binani Cement Binani 3 Lloyds Lloyds
4 Birla Cement Birla A-1 4 Essar Steel Ltd. Essar
5 Gujarat Sidhee Sidhee 5 Steel Authority of SAIL
Cement India.
6 J.K. Cement J.K. 6 Parmeshwar Steel God TMT
7 J.K. Laxmi Cement J.K. Laxmi 7 Gallant Ispat Ltd. Gallant TMX
8 Sanghi Cement Sanghi 8 Aditya Ultra Steel KAMDHENU
Pvt. Ltd. NXT& Kay
9 Saurastra Cement Hathi 9 Mono steel India MONO TMT
10 Shree Digvijay KAMAL 10 Aashiana Rolling Friends Steel
Cement Mills Ltd.
11 India Cement Corromandal 11 Electro Therm (I) ET TMT
King Ltd.
12 Ultratech Cement Ultra-tech 12 H.K Ispat Pvt Ltd Kothi
13 HI-BOND Cement HI-BOND 13 SRJ peety steel Pvt. Shree Om
Ltd. TMT/ SRJ
TMT/ Kapila
Pune steel
14 Shree Cement Ltd Shree/Bangur 14 Nilkanth Concast Nilkanth
/Rock Private
strong/Roofo Limited
n/Bangur 15 Shreeyam Power & National
Power Steel
Industries Limited
16 Utkarsh Bars Utkarsh
Private Limited
CONSTRUCTION CHEMICALS 17 Bhagyalaxmi Polad
Rolling Mill Pvt. Ltd
1 Red-Wop Rajkot 18 Shri Khatu Shyam Khatu TMT
Alloys Pvt.
2 Samrock Chemicals Ahmedabad 19 Steefo Steels LLP, STEEFO TMT
20 Haq Steel & GERMAN TMX
Metaliks Ltd. Kutch
Water Proofing 21 K.B. Ispat Private KB TMT
& Wrapping Coating Ltd.,
1 Bitumag Industries Vadodara 22 VMS TMT Private KAMDHENU
Ltd., NXT& Kay
Ahmedabad TMT
2 A.R. Industries Vadodara 23 Briskon Multi Sabarkantha
metals LLP
3 Tiki tar Danosa Halol 24 Kalika Steel Alloys KALIKA
EW- 279 PUR-F-006 RFQ-76356
(India) Pvt Ltd Pvt Ltd. Jalna TMT
4 STP Ltd Ankleshwar 25 Anjar TMT steel pvt Welspun
Flooring Tiles 26 Shri Bajrang Power Goel TMT &
& Ispat Ltd Pipes
27 Rajuri steels & TMT Rajuri steel
Bars Pvt Ltd
28 SMW steel Sangam
1 Asian Granito Himatnagar 29 Rathi steel & Metal Icon steel
2 Somany Kaloal 30 Metarolls Ispat Pvt Metarolls TMT
3 Simpolo Morbi
4 Varmora Morbi
5 Sunheart Morbi
6 Emcer Morbi
7 Cengres Ahmedabad
In addition to the above Approved Vendor List of GSECL, the approved vendor
list of GUVNL and its subsidiary company i.e. GSECL/GETCO/MGVCL
/PGVCL/DGVCL & UGVCL which are available on their website- in tender head
including above mention various manufacturers are also to be treated as
Approved Vendors.
For & On behalf of GSECL
CHIEF ENGINEER (Gen)
GSECL: GTPS
SIGNATURE OF CONTRACTOR
EW- 279 PUR-F-006 RFQ-76356
GENERAL SPECIFICATIONS
01. In the specifications, “as directed”/”Approved” shall be taken to mean “as
directed”/”approved” by the Engineer-in-charge.
02. Wherever a reference to any Indian Standard appears in the specifications, it
shall be taken to mean as a reference to the latest edition of the same in force on
the date of agreement.
03. In “Mode of Measurement” in the specification wherever a dispute arises in the
absence of specific mention of a particular point or aspect, the provisions on
these particular points or aspects in the relevant Indian Standards shall be
referred to.
04. All measurements and computations, unless otherwise specified, shall be carried
out as per Latest IS:
05. The distance which constitutes lead shall be determined along the shortest
practical route and not necessarily the route actually taken. The decision of the
Engineer-in-charge in this regard shall be taken as final.
06. Where no lead is specified, it shall mean “all leads”.
07. Lift shall be measured from plinth level.
08. Up to “floor two levels” means actual height of floor up to 6.5 Mt. Above plinth
09. Definite particulars covered in the items of work, though not mentioned or
elucidated in it, specification shall be deemed to be included therein.
10. Reference to specifications of materials as made in the detailed specification of
the items of work is in the form of a designation containing the number of the
specification of the material and prefix „M‟ e.g. „M-5‟.
11. Approval to the samples of various materials given by the Engineer-in-charge
shall not absolve the contractor from the responsibility of replacing defective
material brought on site or materials used in the work found defective at a later
date. The contractor shall have no claim to any payment or compensation
whatsoever on account of any such materials being rejected by the Engineer-in-
12. The contract rate of the item of work shall be for the work completed in all
13. No collection of materials shall be made before it is got approved from the
Engineer-in-charge.
14. Collection of approved materials shall be done at site of work in a systematic
manner. Materials shall be stored in such a manner as to prevent damage,
deterioration or intrusion of foreign matter and to ensure the preservation of
their quality and fitness for the work.
15. Cement, reinforcements bars & all other materials to be used shall be got
approved from EIC before starting of work. The cement, reinforcement steel &
other materials to be brought at site shall be entered at GANDHINAGAR, TPS
main entry gate.
16. Materials, if and when rejected by the Engineer-in-charge, shall be immediately
removed from the site of work.
17. No materials shall be stored prior to, during and after execution of a structure in
such a way as to cause or lead to damage or overloading of the various
components of the structure.
18. All works shall be carried out in a workmanlike manner as per the best
techniques for the particular item.
19. All tools, templates, machinery and equipment for correct execution of the work
as well as for checking lines, levels, alignment of the works during execution
shall be kept in sufficient numbers and in good working condition on the site of
20. The mode, procedure and manner of execution shall be such that it does not
cause damage or over loading of the various components of the structure during
execution or after completion of the structure.
21. Special modes of construction not adopted in general Engineering practice, if
proposed to be adopted by the Contractor, shall be considered only if the
EW- 279 PUR-F-006 RFQ-76356
contractor provides satisfactory evidence that such special mode of construction
is safe, sound and helps in speedy construction and completion of work to the
required strength and quality. Acceptance of the same by the Engineer-in-charge
shall not, however, absolve the contractor of the responsibility of any adverse
effects and consequences of adopting the same in the course of execution of
completion of the work.
22. All installations pertaining to water supply and fixtures thereof as well as
drainage lines and sanitary fittings shall be deemed to be completed only after
giving satisfactory tests by the Contractor.
23. The contractor shall be responsible for observing the rules and regulations
imposed under „Minor Minerals Act‟ and such other laws and rules prescribed by
Government from time to time.
24. All necessary safety measures and precaution [including those laid down in the
various relevant Indian Standards shall be taken to ensure the safety of men,
materials and machinery on the works as also of the work itself.
25. The testing charge of all materials shall be borne by the Contractor unless
recovery at one percent towards using charges is separately made.
26. Approval to any of the executed items for the work does not in any way relieves
the contractor of his responsibility for the correctness, soundness and strength
of the structure as the drawings and specification.
For & On behalf of GSECL
CHIEF ENGINEER (Gen)
GSECL: GTPS
SIGNATURE OF CONTRACTOR
EW- 279 PUR-F-006 RFQ-76356
TECHNICAL SPECIFICATIONS
unit 3, 4 & 5 at GTPS”
01. In the specifications, “as directed”/”Approved” shall be taken to mean “as
directed”/”approved” by the Engineer-in-charge.
02. In “Mode of Measurement” in the specification wherever a dispute arises in the absence
of specific mention of a particular point or aspect, the provisions on these particular points, or
aspects - the relevant Indian Standards shall be referred to.
03. All measurements and computations, unless otherwise specified, shall be carried out
nearest to the following limits:
a. Length, width and depth (height) -----------0.01 Meter.
b. Areas-------------------------------------------- 0.01 sq Mt.
c. Cubic Contents-------------------------------- 0.01 Cu. Mt.
04. The distance which constitutes lead shall be determined along the shortest practical
route and not necessarily the route actually taken. The decision of the Engineer-in-charge
in this regard shall be taken as final.
05. Where no lead is specified, it shall mean “all leads”.
06. Lift shall be measured from plinth level.
07. Reference to specifications of materials as made in the detailed specification of the items
of work is in the form of a designation containing the number of the specification of the material
and prefix „M‟ e.g. „M-5‟.
08. Approval to the samples of various materials given by the Engineer-in-charge shall not
absolve the contractor from the responsibility of replacing defective material brought on site or
materials used in the work found defective at a later date. The contractor shall have no claim to
any payment or compensation whatsoever on account of any such materials being rejected by
the Engineer-in-charge.
09. The contract rate of the item of work shall be for the work completed in all respects.
10. No collection of materials shall be made before it is got approved from the Engineer-in-
11. Collection of approved materials shall be done at site of work in a systematic &
sequantial manner. Materials shall be stored in such a manner as to prevent damage,
deterioration or intrusion of foreign matter and to ensure the preservation of their quality and
fitness for the work.
12. Materials, if and when rejected by the Engineer-in-charge, shall be immediately removed
from the site of work.
13. All tools, templates, machinery and equipment for correct execution of the work as well
as for checking lines, levels, alignment of the works during execution shall be kept in sufficient
numbers and in good working condition on the site of the work.
14. Special modes of construction not adopted in general Engineering practice, if proposed to
be adopted by the Contractor, shall be considered only if the contractor provides satisfactory
evidence that such special mode of construction is safe, sound and helps in speedy construction
and completion of work to the required strength and quality. Acceptance of the same by the
Engineer-in-charge shall not, however, absolve the contractor of the responsibility of any
adverse effects and consequences of adopting the same in the course of execution of completion
of the work.
15. All installations pertaining to water supply and fixtures thereof as well as drainage lines
and sanitary fittings shall be deemed to be completed only after giving satisfactory tests by the
Contractor.
16. The contractor shall be responsible for observing the rules and regulations imposed
under „Minor Minerals Act‟ and such other laws and rules prescribed by Government from time
17. The testing charge of all materials shall be borne by the Contractor & reports of authorize
laboratory shall be submitted timely.
18. Approval to any of the executed items for the work does not in any way relieves the
contractor of his responsibility for the correctness, soundness and strength of the structure as
per the drawings and specification.
19. Due care at all the items shall be taken to see that no damage is caused to the existing
setup of GSECL. In case of any such damage is caused, it shall be restored by the agency at his
EW- 279 PUR-F-006 RFQ-76356
NOTE: BOOKLET FOR “GENERAL TECHNICAL SPECIFICATIONS FOR BUILDING WORKS”
OF R. & B. DEPARTMENT, GOG, GUJARAT AND BOOKLET OF “GENERAL SPECIFICATION
FOR CIVIL WORKS” OF GSECL WILL BE AVAILABLE IN CIVIL OFFICE AT GANDHINAGAR
TPS FOR REFERNCE OF RELEVANT DETAIL SPECIFICATIONS OF ITEMS. SHALL BE
CONSIDERED & ADOPTED IN WORK.
DETAILED TECHNICAL SPECIFICATIONS
ITEM NO-1 : Steel work welded in built up sections framed work including cutting,
hoisting, fixing in position and applying a priming coat of red lead paint (A) In
beams and joints channels angles, tees, flats with connecting plates or angle cleats
as in main and cross beams. Hip and jack rafters, purlins connected to common
rafters and the like.
1.0 Materials & Workmanship:
1.1 Materials: The structural steel work shall conform to M-22. Red lead paint primer shall
conform to I.S.: 102-1962.
2.0 Workmanship:
2.1 The steel sections as specified or required shall be cut, square and to correct lengths as per
drawings and design. The cut ends exposed to view shall be finished smooth. No two pieces
shall be welded or otherwise jointed to make up the required length of member, except as
indicated in the drawing or as directed. All straightening and shaping to form shall be done by
application of pressure and not by hammering. Any bending or cutting shall be carried out in
such a manner as not to impair the strength of the metal. All operations shall be done in cold
state unless otherwise directed/permitted.
The steel structure as shown in the drawings or as per direction of the Engineer-in-charge shall
be laid out on a level platform to full scale and to full size or in parts. A steel tape shall be used
for measurements to ensure maximum accuracy.
2.2 Welding shall generally be done by electric process. Gas welding shall be resorted to using
oxyacetylene flame with specific approval. Gas welding shall not be permitted for structural
steel work.
2.3 The work shall be done as shown in the shop drawings which should clearly indicate various
details of the joints to be welded; shop and site welded as well as type of electrodes to be used.
Symbol for welding on plans and shop drawing shall be according to I. S. 813-1961. As far as
possible every effort shall be made to limit the welding that must be done after improper
welding that is likely to be done due to heights and difficult position on scaffoldings etc.
The welding work shall conform to I. S. 816-1969.
2.4 Preparation of surfaces: Surfaces which are to be welded together shall be free from loose mill
scale, rust, paint, grease or other foreign matter. A coating of boiled linseed oil shall be
permitted.
2.5 Assembly for welding: Before welding is commenced, the plates shall first be brought together
and firmly clamped or spot welded at specified distance. The temporary connection has to be
strong enough to hold the plates accurately in place without displacement.
2.6 Precautions: All operations connected with welding and cutting equipment shall conform to
safety requirement given in I.S. 818-1968.
The following points shall be borne in mind during the process of welding:
(a) Welds shall be made in flat position wherever practicable.
(b) Are length, voltage and amperage shall be suited to the thickness of material, type of groove
and other circumstances of the work.
(c) The segments of welding shall be such that where possible the members which offer the
greatest resistance to compression are welded first.
2.7 The defective welds which shall be considered harmful to the strength shall cut out and re
2.8 Finished welds and adjacent part shall be protected with clean boiled linseed oil and after all
stag has been removed welds and adjacent parts shall be painted after the same are approved.
EW- 279 PUR-F-006 RFQ-76356
2.9 All the members shall be thoroughly cleaned of rust, scales, dust etc and given a priming coat
of red lead paint before fixing them in position. Testing of welding to be added in the
specification I.N. 12.2.2.12. (i) To (viii).
3.0 Mode of measurements & payment:
3.1 The rate shall be for unit of one M.T.
ITEM NO-2 : Painting two coats (excluding priming coat) on new steel and other metal
surfaces with enamel paint, brushing interior to give an even shade including cleaning the
surface of all dirt, dust and other foreign matter.
1.0. Materials: The enamel paint shall conform to M –44 B.
2.0. Workmanship:
2.1. General:
2.1.1. The materials required for work of painting work shall be obtained directly from approved
manufactures or approved dealer and brought to the site in maker‟s drums, keg etc with seal
2.1.2. All materials not in actual use shall be kept properly protected, lids of containers shall be
kept closed and surface of paint in open or partially open containers covered with a thin layer
of turpentine to prevent formation of skin. The materials which have become stale or flat due
to improper and long storage shall not be used. The paint shall be stirred thoroughly in its
container before pouring into small containers. While applying also the paint shall be
continuously stirred in smaller container. No left over paint shall be put back into stock tins.
When not in use, the containers shall be kept properly closed.
2.1.3. If for any seasons, thinning is necessary, the brand of thinner recommended by the
manufacturer shall be used.
2.1.4. The surface to be painted shall be thoroughly cleaned and dusted. All rust, dirt and grease
shall be thoroughly removed before painting is started. No painting on exterior or other
exposed parts of the work shall be carried out in wet, damp or otherwise unfavorable weather
and all the surfaces shall be thoroughly dry before painting work is started.
2.2. Application:
2.2.1. Brushing operations are to be adjusted to the spreading capacity advised by the
manufacture of particular paint. The paint shall be applied evenly and smoothly by means of
crossing and lying off. The crossing and laying off consists of covering the area over with paint,
brushing the surface hard for the first time over and then brushing alternately in opposite
directions two or three times and then finally brushing lightly in direction at right angles to
the same. In this process, no brush marks shall be after the laying off is finished. The full
process of crossing and lying off will constitute one coat.
2.2.2. Each coat shall be allowed t dry completely and lightly rubbed with very fine grade of sand
paper and loose particles brushed off before the next coat is applied. Each coat shall vary
slightly in shade and shall be got approved from Engineer-in-charge before next coat is
2.2.3. Each coat except the last cost shall be lightly rubbed down with sand-paper of fine pumice
stone and cleaned of dust before the next coat is applied. No hair marks from the brush or
clogging of paint puddles in the corners of panel‟s angles job moldings etc. Shall be left on the
2.2.4. Special care shall be taken while painting over bolts, nuts, rivets, overlaps etc. Approved
best quality brushes shall be used.
Oil painting Synthetic Enamel paint should be of 1st or Premium quality of below
mentioned brands.
1. Asian paint: Apcolite.
2. Nerolac: Nerolac Synthetic Emulsion (Premium Quality)
3. ICI Dulux (Akzo Noble): Dulux Gloss.
4. Berger: Luxol High Gloss.
5. Grauer WELL (India) Ltd.: Growel make Pentolite Super Synthetic Enamel.
3.0 Mode of measurements & payment:
The rate shall be for a unit of one Square Metre.
ITEM NO-3 : Labour charges for Repairing of damaged existing M.S. covers of trenches
EW- 279 PUR-F-006 RFQ-76356
laying at various location in P.H. area including cutting, straightening, strengthening,
refixing in position and applying a priming coat of red lead paint in plates and angle as in
main and cross bracing.
The relevant specifications of item No-1 above shall be followed.
2.0 Mode of measurements & payment:
The rate shall be for unit of one M.T.
ITEM NO-4 : Providing & Laying Cement concrete work 1:2:4 (1-Cement : 2-Coarse sand: 4-
Graded stone aggregates 20mm nominal size) and curing complete excluding cost of form
work and reinforcement for reinforced concrete work in (B) Slabs, landing, shelves,
Balconies, Lintels, Beams, Girders and Cantilevers up to floor two level.
1.0 Materials: Water shall conform to M-1. Cement shall conform to M-3. Sand shall conform to
M-6. Grit shall conform to M-8. Graded stone aggregate 20 mm. Nominal size shall conform
2.0 General:
2.1 The concrete mix is not required to be designed by preliminary tests. The proportion of the
concrete mix shall be 1: 2: 4 (1 cement: 2 coarse sand: 4 graded stone aggregate 10 mm.
Nominal size) by volume. Concrete work shall have exposed concrete surface or as specified
in the item.
2.2 The designation ordinary M-100, M-150, M-200, M-250 specified as per I. S. Corresponding
approximately to 1 : 3 : 6, 1 : 2 : 4, 1 ½ : 3 and 1 : 1 : 2 nominal mix of ordinary concrete by
volume respectively.
2.3 The ingredients required for ordinary concrete containing one beg of cement of 50 Kg. By
weight (0.0342 Cu. M.) For different proportions of mix shall be as under :
Grade of concrete Total quantity of dry Proportion of fine Quantity of water per
aggregate by volume aggregate to coarse 50 Kgs. Of cement
per 50 kgs. Of aggregate maximum
cement to be taken
1 as the sum of
individual of fine and
coarse aggregates, 3
M-100 (1 : 3 : 6) 300 Liters Generally 1 : 2 for 34 liters
fine aggregate to
coarse aggregate by
volume but subject
to and upper limit of
1:1 1/2 and lower
limit 1 :
2.4 The water cement ratio shall not more than those specified in the above table. The cement
content of the mix specified in the Table shall be increased if the quantity of water in a mix
has to be increased to overcome the difficulties of placement and compaction so that the
water-cement-ratio specified in the Table is not exceeded.
2.5 Workability of the concrete shall be controlled by maintaining a water-cement-ratio that is
bound to give a concrete mix which is just sufficiently wet to be placed and compacted
without difficulty with the means available.
2.6 The maximum size of coarse aggregate shall be as large as possible within the limits
specified but in no case greater than one fourth of the minimum thickness of the member,
provided that the concrete can be placed without difficulty so as to surround all
reinforcement thoroughly and to fill the corners of the form.
2.7 For reinforced concrete work, coarse aggregates having a nominal size of 20 mm. Are
generally considered satisfactory.
2.8 For heavily reinforced concrete members as in the case of ribs of main beams, the nominal
maximum size of coarse aggregate should usually be restricted to 5 mm. Less than the
minimum clear distance between the main bars, or 5 mm. Less than the minimum cover to
the reinforcement whichever is smaller.
Where the reinforcement is widely spaced as in solid slabs, limitations of size of the
EW- 279 PUR-F-006 RFQ-76356
aggregate may not be important and the nominal maximum size may sometimes be as
great as or greater than the minimum cover.
2.9 Admixture may be used in concrete only with approval of Engineer-in-charge upon the
evidence that with the passage of time, neither the compressive strength of concrete is
reduced nor are other requisite qualities of concrete and steel impaired by the use of such
admixtures.
3.0 Workmanship:
3.1 Proportioning: proportioning shall be done by volume, except cement which shall be
measured in terms of bags of 50 Kg. Weight. The volume of one such bag being taken as
0.0342 Cu. Meter Boxes of suitable sizes shall be used for measuring sand aggregate. The
size of the boxes (internal) shall be 35 cms. X 25 cms. And 40 cms. Deep. While measuring
the aggregate and sand, the box shall be filled without shaking ramming or hammering.
The proportioning of sand shall be on the basis of its dry volume and in case of damp
sand; allowances for bulk age shall be made.
3.2 Mixing :
3.2.1 For all work. Concrete shall be mixed in a mechanical mixer which along with other
accessories shall be kept in first class working condition and so maintained throughout
the construction. Measured quantity of aggregate, sand, cement required for each batch
shall be poured into the drum of the mechanical mixer while it is continuously running.
After about half a minute of dry mixing, measured quantity of water required for each
batch of concrete mix shall be added gradually and mixing continued for another one
and a half minute. Mixing shall be continued till materials are uniformly distributed and
uniform color of the entire mass is obtained and each individual particle of the coarse
aggregate shows complete coating of mortar containing its proportionate amount of
cement. In no case shall the mixing be done for less than 2 minutes after all ingredients
have been put into the mixer.
3.2.2 When hand mixing is permitted by the Engineer-in-charge for small jobs or for certain
other reasons, it shall be done on the smooth watertight platform large enough to allow
efficient turning over the ingredients of concrete before and after adding water. Mixing
platform shall be so arranged that no foreign materials get mixed with concrete nor does
the mixing water flow out. Cement in required number of bags shall be placed in a
uniform layer on top of the measured quantity of fine and coarse aggregate, which shall
also be spread in a layer of uniform thickness on the mixing platform. Dry coarse and
fine aggregate and cement shall then be mixed thoroughly by turning over to get a
mixture to uniform color. Specified quantity of water shall then be added gradually
through a rose-can and the mass turned over till a mix of required consistency is
obtained. In hand mixing, quantity of cement shall be increased by 10 percent above that
specified.
3.2.3 Mixers which have been out of use for more than 30 minutes shall be thoroughly cleaned
before putting in a new batch. Unless otherwise agreed to by the Engineer-in-charge the
first batch of concrete from the mixture shall contain only two thirds of normal quantity
of coarse aggregate. Mixing plant shall be thoroughly cleaned before changing from one
type of cement to another.
3.3 Consistency:
3.3.1 The degree of consistency which shall depend upon the nature of the work and methods
of vibration of concrete shall be determined by regular slumps tests in accordance with I.
S. 1199-1959. The slumps of 10 mm To 25 mm shall be adopted when vibrators are used
and 80 mm when vibrators are not used.
3.4 Inspection :
3.4.1 Contractor shall give the Engineer-in-charge due notice before placing any concrete in
the forms to permit him to inspect and accept the false work and forms as to their
strength, alignment, and general fitness but such inspection shall not relive the
contractor of his responsibility for the safety of men, machinery, materials and for results
obtained. Immediately before concreting, all forms shall be thoroughly cleaned.
3.4.2 Centering design and its erection shall be got approved from the Engineer-in-charge. One
carpenter with helper shall invariably be kept present throughout the period of
concreting. Movement of labor and other persons shall be totally prohibited for
reinforcement laid in position. For access to different parts, suitable mobile platforms
shall be provided so that steel reinforcement in position is not disturbed for ensuring
proper cover; mortar blocks of suitable size shall be cast and tied to the reinforcement.
Timber, kapachi or metal pieces shall not be used for this purpose.
3.5 Transporting and laying:
3.5.1 The method of transporting and placing concrete shall be as approved. Concrete shall be
so transported and placed that no contamination, segregation or loss of its constituent
material takes place.
All formwork shall be cleaned and made free from standing water, dust show or ice
immediately before placing of concrete.
EW- 279 PUR-F-006 RFQ-76356
No concrete shall be placed in any part of the structure until the approval of the
Engineer-in-charge has been obtained.
3.5.2 Concreting shall proceed continuously over the area between construction joints. Fresh
concrete shall not be placed against concrete which has been in position for more than
30 minutes unless a proper construction joints is formed. Concrete shall be compacted
in its final position within 30 minutes of its discharge from the mixer. Except where
otherwise agreed to by the Engineer-in-charge concrete shall be deposited shall be
deposited in horizontal layers to a compacted depth of not more than 0.45 meter when
internal vibrators are used and not exceeding 0.30 meter in all other cases.
3.5.3 Unless otherwise agreed to by the Engineer-in-charge, concrete shall not be dropped into
place from a height exceeding 2 meters. When trucking or chutes are used they shall be
kept close and used in such a way as to avoid segregation. When concreting has to be
resumed on a surface which has hardened, it shall be roughened, swept clean,
thoroughly wetted and covered with a 13 mm. Thick layer of mortar composed of cement
and sand in the same ratio as in the concrete mix itself. This 13 mm. Layer of mortar
shall be freshly mixed and placed immediately before placing of new concrete. Where
concrete has not fully hardened, all laitance shall be removed by scrubbing the wet
surface with wire or bristle brushes, care being taken to avoid dislodgement of any
particles of coarse aggregate. The surface shall then be thoroughly wetted all free water
removed and then coated with neat cement grout. The first layer of concrete to be placed
on his surface shall not exceed 150 mm. In thickness and shall be well rammed against
old work, particular attention being given to corners and close spots.
3.5.4 All concrete shall be compacted to produce a dense homogeneous mass with the
assistance of vibrators, unless otherwise permitted by the Engineer-in-charge for
exceptional cases, such as concreting under water, where vibrators cannot be used.
Sufficient vibrators in serviceable condition shall be kept at site so that spare equipment
is always available in the event of breakdowns.
Concrete shall be judged to be compacted when the mortar fills the spaces between the
coarse aggregate and begins to cream up to form an even surface. Compaction shall be
completed before the initial setting starts i.e. Within 30 minutes of addition of water to
dry mixture. During compaction, it shall be observed that needle vibrators are not
applied on reinforcement which is likely to destroy the bond between concrete and
reinforcement.
3.6 Curing: Immediately after compaction, concrete shall be protected from weather,
including rain, running water, shocks, vibration, traffic, rapid temperature changes, frost
and drying out process. It shall be covered with wet sacking, hessian or other similar
absorbent material approved soon after the initial set and shall be kept continuously wet
for a period of not less than 14 days from the date of placement. Masonry work over
foundation concrete may be started after 48 hours of its laying but curing of concrete
shall be continued for a minimum period of 14 days.
3.7 Sampling and Testing of concrete:
3.7.1 Samples from fresh concrete shall be taken as per I. S. 1199-1959 and cubes shall be
made, cured and tested at 7 days or 28 days as per requirements in accordance with I. S.
516-1959. A random sampling procedure shall be adopted to ensure that each concrete
batch shall have a reasonable chance of being tested i.e. the sampling should be spread
over the entire period of concreting and cover all mixing units. The minimum frequency
of sampling of concrete of each grade shall be in accordance with following:
Quantity of concrete No. Of samples Quantity of concrete No. Of samples
in the work in the works
1-5 Cmt. 1 16-30 Cmt.
51 and above + one additional for each additional 50 M. Or part thereof.
NOTE: At least one sample shall be taken from each shift. Ten test specimens shall be
made from each sample, five for testing at 7 days and the remaining five at 28 days. The
samples of concrete shall be taken on each day of the concreting as per above frequency.
The number of specimens may be suitably increased as deemed necessary by the
Engineer-in-charge when procedure of tests given above levels a poor quality of concrete
and in other special cases.
3.7.2 The average strength of the group of cubes case for each day shall not be less than the
specified cube strength of 150 kg/Cm2 at 28 days. 20% of the cubes cast for each day
may have value less than the specified strength provided the lowest value is not less than
85% of the specified strength. If the concrete made in accordance with the proportions
given for a particular grade, does not yield the specified strength, such concrete shall be
classified as belonging to the appropriate lower grade. Concrete made in accordance with
the proportions given for a particular grade shall not however, be placed in a higher
grade on the ground that the test strength are higher than the minimum specified.
3.8 Stripping :
EW- 279 PUR-F-006 RFQ-76356
3.8.1 The Engineer-in-charge shall be informed in advanced by the contractor of his intention
to strike the form work. While fixing the time for removal of form work due consideration
shall be given to local conditions, character of the structure the weather and other
condition that influence the setting of concrete and of the materials used in the mix in
normal circumstances (generally where temperatures are above 20ºc) and where ordinary
concrete is used forms may be struck after expiry of periods specified in item No. 9.1 (A)
for respective item of form work.
3.8.2 All formwork shall be removed without causing any shock or vibration as would damage
the concrete. Before the soffits and struts are removed the concrete surface shall be
exposed where necessary in order to ascertain that the concrete has sufficiently
hardened. Centering shall be gradually and uniformly lowered in such manner as to
permit the concrete to take stresses due to its own weight uniformly and gradually.
Where internal metal ties are permitted they or their removable parts shall be extracted
without causing any damage to the concrete and remaining holes filled with mortar. No
permanently embedded metal part shall have less than 25 mm. Cover to the finished
concrete surface. Where it is intended to re-use the formwork, it shall be cleaned and
made good to the satisfaction of the Engineer-in-charge. After removable of form work
and shuttering the Executive Engineer shall inspect the work and satisfy by random
checks that concrete produced is of good quality.
3.8.3 Immediately after the removal of forms all exposed bolts etc., passing through the cement
concrete member and use for shuttering or any other purpose shall be cut inside the
cement concrete members to a depth of at least 25 mm. Below the surface of the concrete
and the resulting holes be filled by cement mortar. All fine caused by form joints, all
cavities produced by the removal of forms ties and all other holes and depressions
honeycomb spots broken edges or corners and other defects shall be thoroughly cleaned,
saturated with water and carefully pointed and rendered true with mortar of cement and
fine aggregate mixed in the proportion used in the grade of concrete that is being finished
and of as dry consistency as is possible to use. Considerable pressure shall be applied in
filling and pointing to ensure through filling in all voids. Surfaces which are pointed shall
be kept moist for a period of 24 hours.
If rock pockets honeycombs in the opinion of the Engineer-in-charge are of such an
extent or character as to affect the strength of the structure materially or to endanger the
life of the steel reinforcement he may declare the concrete defective and require the
removal and replacement of the portions of the structure affected.
4.0 Mode of measurement and payment:
4.1 The consolidated cubical contents of concrete work as specified in item shall be
measured the concrete laid in excess of section shown on drawings or as directed shall
not be measured. No deduction shall be made for
(a) Ends of dis-similar materials such as joints, beams, posts, girders, rafters, purling
trusses, corbels and steps etc. Up to 500 Sq. Cm. In section.
(b) Opening up to 0.1 Sq. M.
4.2 The rate includes cost of all materials, labor, tools and plant required for mixing, placing
in position, vibrating and compacting, finishing as directed curing and all other
incidental expenses for producing concrete of specified strength. The rate excludes the
cost of form work.
4.3 The rate shall be for a unit of one cubic meter.
ITEM NO-5:- Providing TMT bar FE 500D reinforcement for RCC work including bending,
binding and placing in position complete up to floor two level.
1.0 Materials: 1.1 Cold twisted steel bars (high yield strength steel deformed bars) shall
conform to M-19 mild steel binding wires shall conform to M-21.
2.0 Workmanship:
2.1 The work shall consist of furnishing and placing reinforcement to the shape and
dimensions shown as on the drawings or as directed.
2.2 Steel shall be clean and free from rust and loose mill scale at the time of fixing in
position and subsequent concreting.
2.3 Reinforcing steel shall conform accurately to the dimensions given in the bar bending
schedules shown on relevant drawings. Bars shall be bent cold to specified shape and
dimensions or as directed using a proper bar bender, operated by hand or power to
attain proper radius of bends. Bars shall not be bent or straightened in a manner that
will injure the material. Bars bent during transport or handling shall be straightened
before being used on the work. They shall not be heated to facilitate bending. Unless
otherwise specified a „U‟ type hook at the end of each bar shall invariably be provided to
main reinforcement. The radius of the bend shall not be less than twice the diameter of
the round bar and the length of straight part of the bar beyond the end of the curve shall
be at least four times the diameter of the round bar. In case of bars which are not round
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
GTPS_Tender _ EW-279_02_05_2026.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .