| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.6 LAccepted-AOC | L1 | Accepted-AOC Lowest | |
| 2 | L2₹3.6 L+₹657 (0.18%)Rejected-AOC | L2 | Rejected-AOC Highest rate hence rejected | |
| 3 | L3₹3.9 L+₹26,237 (7.24%)Rejected-Finance | L3 | Rejected-Finance Highest rate hence rejected | |
| 4 | L4₹3.9 L+₹30,346 (8.37%)Rejected-Finance | L4 | Rejected-Finance Highest rate hence rejected |
Tender Value
₹3.8 L
EMD Value
₹9,376
Closing Date
3 May 2023, 5:00 pmClosed
Seeja KR
O/o Assistant Executive Engineer Electrical Wing (I) Sub division, Aluva
Fully Comprehensive Annual Maintenance of Veliyathunadu 1, Mudikkal LI Scheme under Electrical LI section Aluva-
2023_Irrig_554000_15
PWD/BLDG/TR/10885/2022
Open Tender
Electrical Works
Item Rate
365 days
Aluva
Please refer Tender documents.
11 documents required · 11 mandatory
₹830
₹9,376
16 Jun 2023
17 Apr 2023
5 May 2023
17 Apr 2023
3 May 2023
17 Apr 2023
17 Apr 2023 - 2 May 2023
Amount
Overhauling
OD69072/2022-2023:Dismantling the 5 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, test running including scrapping, cleaning and painting with enamel paint.
OD69073/2022-2023:Dismantling the 100 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, test running including scrapping, cleaning and painting with enamel paint.
Lowering / Refitting
OD69089/2022-2023: Lowering down and erecting 5 HP motor/vacuum motor pump set, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
OD69090/2022-2023:Lowering down and erecting 100 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
Accessories Supply and Other Items( SITC Should be completed with in 3 Months after executing the Agreement)
OD69085/2022-2023:Supply and filling of transformer oil of good quality to the Transformer /starter/ regulator etc as required
OD69087/2022-2023:Supply and Installing 20 W LED Tube light.
OD120215/2022-2023:Supply and renewal of the LED Indication lamps in panel board after dismantling the damaged one
OD120219/2022-2023:Replacing the damaged bearing , supply and fixing new ball/Roller bearing , SKF / FAG or equivalent , suitable for motor / pump set as per the direction of departmental staff at site - Bearing No 6316-2Z or its equivalent size
Periodical Maintenance
OD69078/2022-2023:Fully Comprehensive Annual Maintenance of 5 HP Vacuum motor pump set , D.O.L starter ,controlling electrical accessories , etc complete for a period of 12 months including attending all repairs , reconditioning the damaged parts , replacing spares with original make as per sample , dismantling and refitting , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump,maintaince of the motor pump sets , pipes , starter and valves electrical accessories etc complete in good working condition(excluding motor rewinding)all time during the period of contract and the faults should be rectified with in the time allowed
OD69081/2022-2023: Fully Comprehensive Annual Maintenance of 100 HP Slip ring induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter and slip ring unit, replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump and starter ( excluding motor rewinding ) and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
OD136846/2022-2023:Fully Comprehensive Annual Maintenance of 100 HP squirrel cage induction motor with split case / End suction pump set, controlling electrical accessories , panel board,etc complete for a period of 12 months including attending all repairs,replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump ( excluding motor rewinding ) and maintain the motor pump set, electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
Lifting
OD69075/2022-2023: Lifting the 5 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
OD69077/2022-2023:Lifting the 100HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
Overhauling
OD69070/2022-2023:Dismantling the 5 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, test running including scrapping, cleaning and painting with enamel paint.
OD69105/2022-2023:Dismantling the 75 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, test running including scrapping, cleaning and painting with enamel paint.
OD69071/2022-2023:Dismantling the 120 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, test running including scrapping, cleaning and painting with enamel paint.
Lowering / Refitting
OD69109/2022-2023:Lowering down and erecting 75 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
OD69110/2022-2023:Lowering down and erecting 120 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
OD97697/2022-2023:Lowering down and erecting 5 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
Accessories Supply and Other Items( SITC Should be completed with in 3 Months after executing the Agreement)
OD69061/2022-2023:Supply and filling of transformer oil of good quality to the Transformer /starter/ regulator etc as required
OD120224/2022-2023:Replacing the damaged bearing , supply and fixing new ball/Roller bearing , SKF / FAG or equivalent , suitable for motor / pump set as per the direction of departmental staff at site - Bearing No 6316-2Z or its equivalent size
OD69062/2022-2023: Supply and renewal of the LED Indication lamps in panel board after dismantling the damaged one
OD69063/2022-2023:Supply and Installing 20 W LED Tube light.
Periodical Maintenance
OD69066/2022-2023:Fully Comprehensive Annual Maintenance of 5 HP Vacuum motor pump set , D.O.L starter ,controlling electrical accessories , etc complete for a period of 12 months including attending all repairs , reconditioning the damaged parts , replacing spares with original make as per sample , dismantling and refitting , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump,maintaince of the motor pump sets , pipes , starter and valves electrical accessories etc complete in good working condition(excluding motor rewinding)all time during the period of contract and the faults should be rectified with in the time allowed
OD136849/2022-2023:Fully Comprehensive Annual Maintenance of 75 HP squirrel cage induction motor with split case / End suction pump set, controlling electrical accessories , panel board,etc complete for a period of 12 months including attending all repairs,replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump and ( excluding motor rewinding ) and maintain the motor pump set, electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
Lifting
OD97699/2022-2023:Lifting the 5HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
OD97700/2022-2023:Lifting the 120 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
OD97701/2022-2023:Lifting the 75HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
GK INDUSTRIES
SHIJU M.T
Edward P J
Bidder Name
Edward P J
SHIJU M.T
GK INDUSTRIES
FRANCIS PINHERO
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_844272.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .