Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹51.6 LAccepted-AOC | ₹51.6 L | L1 | Accepted-AOC L1 |
| 2 | L2₹51.7 LRejected-AOC KOOLETTU HOUSE NEERIKKADU P O KOTTAYAM 686564 | KOTTAYAM | KOTTAYAM | KERALA | 686564 | ₹51.7 L | L2 | Rejected-AOC L2 |
| 3 | L3₹54.6 LRejected-AOC | ₹54.6 L | L3 | Rejected-AOC L3 |
| 4 | Rejected-Technical KUMARAKOM VAIKOM | KOTTAYAM | KERALA | 686001 | - | - | Rejected-Technical L5 |
| 5 | Rejected-Technical | - | - | Rejected-Technical L4 |
| Sl No | Description | Qty | Unit | kjthomas L2 | Joji Joseph L5 | SAJI A KURUVILLA L6 | J M J DEVELOPERS L3 | SACHU SONY L1 | Jomon joseph L4 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00BUND FORMATION | |||||||||
| 1.00 | 2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | 1,552.5 | sqm | 9 ₹13,972.50 | 8.22 ₹12,761.55 | 8.74 ₹13,568.85 | 10 ₹15,525 | 7 ₹10,867.50 | 14 ₹21,735 |
| 1.00 | OD32812/2025-2026:Bund formation : earth work in rough excavation,banking excavated earth in layers not
exceeding 20cm in depth , breaking clods,rolling,each layer with 1/2 tonne roller or wooden or
steel rammers and dressing up in embankments for roads , flood banks, marginal banks and
guide banks or fillling up ground depressions,lead upto 50m and lift upto 1.5m ;all kinds of soil | 1,304.1 | cum | 750 ₹9.8 L | 911.83 ₹11.9 L | 969.78 ₹12.6 L | 845 ₹11.0 L | 835 ₹10.9 L | 670 ₹8.7 L |
| 1.00 | OD32811/2025-2026:Strengthening slopes/ earthern bund using coir geo textile(740 GSM) etc.complete including
cost ,conveyance and all other incidental charges as per the direction of the departmental
officers at site. | 2,587.5 | sqm | 75 ₹1.9 L | 72.12 ₹1.9 L | 76.68 ₹2.0 L | 90 ₹2.3 L | 66 ₹1.7 L | 85 ₹2.2 L |
| 2.00Construction of retaining wall | |||||||||
| 2.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 262.08 | cum | 225 ₹58,968 | 228.51 ₹59,887.90 | 242.95 ₹63,672.34 | 280 ₹73,382.40 | 209 ₹54,774.72 | 250 ₹65,520 |
| 2.00 | OD32938/2025-2026:Common Approved OD-1.4 : Dry stone packing under foundation with good quality blasted
rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site | 262.08 | cum | 3,000 ₹7.9 L | 3,137.49 ₹8.2 L | 3,335.58 ₹8.7 L | 3,100 ₹8.1 L | 2,872 ₹7.5 L | 3,700 ₹9.7 L |
| 2.00 | OD33087/2025-2026:Common Approved OD-3.4 : Supplying and Stacking well matured 1/2 split and straight coconut post for driving down through various strata below bed level including cost,
conveyance, labour charges etc complete | 1,122 | metre | 110 ₹1.2 L | 127.94 ₹1.4 L | 136.02 ₹1.5 L | 300 ₹3.4 L | 117 ₹1.3 L | 185 ₹2.1 L |
| 2.00 | OD33088/2025-2026:Common Approved OD-3.5: Driving down coconut pile half split to lines and levels through
soft to medium clay soil strata
including all hire charges and labour and all other appliances necessary for pile driving down after pointing the bottom end. Details for one post of 6m long 15 numbers per day 6X15=90m Details for 90m length. | 935 | metre | 130 ₹1.2 L | 167.61 ₹1.6 L | 178.2 ₹1.7 L | 200 ₹1.9 L | 153 ₹1.4 L | 200 ₹1.9 L |
| 2.00 | OD33111/2025-2026:Common Approved OD-3.7: (60.64.3). Coconut pile -Supplying 1/4 split well matured and straight coconut wailing pieces of required length and tied to the post with iron wires etc complete as per standard specification. | 352.8 | metre | 80 ₹28,224 | 92.52 ₹32,641.06 | 98.36 ₹34,701.41 | 200 ₹70,560 | 84 ₹29,635.20 | 150 ₹52,920 |
Tender Value
₹63.5 L
EMD Value
₹50,000
Closing Date
26 Dec 2025, 6:00 pmClosed
Eecutive Engineer,K.D.Division , Thanneermukom
Eecutive Engineer, K.D.Division , Thanneermukom
GENERAL-Karikandam padasekharam-KP FMP-Improvement works to Karikandam padasekharam in Kurichy panchayath in Changanassery LAC Phase II-General Civil Work
2025_Irrig_822549_1
21/EE/KD/2025-26
Open Tender
Civil Works - Water Works
300 days
Kurichi Panchayath
Please refer Tender documents.
11 documents required · 11 mandatory
₹2,760
Yes
₹50,000
Yes
30 Jan 2026
18 Dec 2025
30 Dec 2025
18 Dec 2025
26 Dec 2025
18 Dec 2025
Amount
BUND FORMATION
2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared.
OD32812/2025-2026:Bund formation : earth work in rough excavation,banking excavated earth in layers not exceeding 20cm in depth , breaking clods,rolling,each layer with 1/2 tonne roller or wooden or steel rammers and dressing up in embankments for roads , flood banks, marginal banks and guide banks or fillling up ground depressions,lead upto 50m and lift upto 1.5m ;all kinds of soil
OD32811/2025-2026:Strengthening slopes/ earthern bund using coir geo textile(740 GSM) etc.complete including cost ,conveyance and all other incidental charges as per the direction of the departmental officers at site.
Construction of retaining wall
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
OD32938/2025-2026:Common Approved OD-1.4 : Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site
OD33087/2025-2026:Common Approved OD-3.4 : Supplying and Stacking well matured 1/2 split and straight coconut post for driving down through various strata below bed level including cost, conveyance, labour charges etc complete
OD33088/2025-2026:Common Approved OD-3.5: Driving down coconut pile half split to lines and levels through soft to medium clay soil strata including all hire charges and labour and all other appliances necessary for pile driving down after pointing the bottom end. Details for one post of 6m long 15 numbers per day 6X15=90m Details for 90m length.
OD33111/2025-2026:Common Approved OD-3.7: (60.64.3). Coconut pile -Supplying 1/4 split well matured and straight coconut wailing pieces of required length and tied to the post with iron wires etc complete as per standard specification.
OD32939/2025-2026:Common Approved OD-1.2: Dry rubble masonry (without concrete levelling course) with good quality blasted rubble and packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources)
kjthomas (BID ID -2446935)
J M J DEVELOPERS (BID ID -2447808)
Jomon joseph (BID ID -2447639)
Joji Joseph (BID ID -2447722)
SAJI A KURUVILLA (BID ID -2447969)
Bidder Name
Joji Joseph
kjthomas
SAJI A KURUVILLA
Jomon joseph
J M J DEVELOPERS
SACHU SONY
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1378579.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.04 MB
viewsbd.pdf
Tender Documents • 2.24 MB
BOQ_1378579.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid