| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.6 LAccepted-AOC OOTTANCHERY H KAMBALAKALLU P O MAMANKARA | ₹5.6 L | L1 | Accepted-AOC First bid rank |
| 2 | L2₹5.8 LRejected-AOC 1507 SUB TREASURY NILAMBUR | KANNUR | KERALA | 670612 | ₹5.8 L | L2 | Rejected-AOC Second bid rank |
| Sl No | Description | Qty | Unit | VARGHESE U O L1 | SAMSON M JOHN L2 |
|---|---|---|---|---|---|
| 1.00Placing of Shutter for storing water and other works | |||||
| 1.00 | OD9009/2025-2026:Removing shutters and plastic sheet at check dam site after water storage season, conveyance of theshutters from CD to the storage shed, including labour charges, loading and unloading, hire charges for tools and plants etc complete. Rate for shutter removal from each vents. (If divers are required for shutter removal in case of flood/high water level, it shall be paid separately.) | 5 | each | 5,221.6 ₹26,108 | 5,459.44 ₹27,297.20 |
| 1.00 | OD9012/2025-2026:Placing shutters with plastic sheet for check dam for storage of water including conveyance of the shutters from storage shed to the CD site, loading and unloading, labour charges for cleaning shutters and groves, painting with anticorrossive bitumastic paint. Rate for each vents (If wooden logs and wastes are deposited at check dam pillars or grooves due to floods, separate payment shall be made for such removal) | 5 | each | 5,062.12 ₹25,310.60 | 5,292.7 ₹26,463.50 |
| 1.00 | OD9014/2025-2026:Engaging divers for removal of wooden logs, silt etc at upstream side of regulator shutters deposited due to floods, to be cleared to avoid further flooding up of river as per direction of the departmental officers at site. | 10 | each | 601.72 ₹6,017.20 | 629.13 ₹6,291.30 |
| 1.00 | OD9011/2025-2026:Engaging skilled labourers (Man mazdoor) for assisting divers for removal of wooden logs, silt etc at upstream side of regulator shutters as per the direction of the departmental officers at site. | 15 | each | 572.33 ₹8,584.95 | 598.4 ₹8,976 |
| 1.00 | OD9008/2025-2026:Using chain blocks for flood clearance works or other necessary works including hire charges for chain blocks, labour charges etc complete. | 4 | Day | 1,835.87 ₹7,343.48 | 1,919.49 ₹7,677.96 |
| 1.01 | OD9015/2025-2026:Engaging skilled labours with necessary equipment for cutting and removing wood logs and other materials deposited in check dam vents/piers including labour charges, hire charges and cost of all materialsetc complete as per direction of departmental officers at site. | 4 | Day | 3,976.55 ₹15,906.20 | 4,157.68 ₹16,630.72 |
| 1.01 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 185 | cum | 260.27 ₹48,149.95 | 272.12 ₹50,342.20 |
| 1.01 | 60.7.6:Supplying and stacking granite stone 20 to 45 dm3 for dumping works- Supplying at site of work granite stone 20 to 45 dm3 in size (60% 45m3,30%30 to 40dm3 and 10% 20 to 30dm3 stones) for measurement ( deducting not less than 15% for voids as fixed by the departmental officer at site) including all cost, conveyance, loading and unloading charges all other incidental charges all leads and lifts etc. complete as per the direction of the departmental officers at site. | 98 | cum | 2,326.24 ₹2.3 L | 2,432.2 ₹2.4 L |
| 1.01 | 60.7.7:Conveyance and dumping of departmental granite stones-Conveyance of departmental granite stone 20 to 45 dm3 in size from stack at site and dumping in position (60% 45m3,30%30 to 40dm3 and 10% 20 to 30dm3 stones) to lines and levels to from the core of the sea wall as per approved design including all leads and lifts etc. complete as per the direction of the departmental officers at site. | 98 | cum | 767.9 ₹75,254.20 | 802.87 ₹78,681.26 |
Tender Value
₹5.1 L
EMD Value
₹12,709
Closing Date
1 Nov 2025, 6:00 pmClosed
Abdurahiman Pulikkathumbayil
Assistant Executive Engineer Minor Irrigation Sub division Civil Station Malappuram 676505
GENERAL-AM 2025-26 Annual Maintenance of Arampulikkal Check dam cum Bridge in Chungathara GP of Nilambur Constituency in Malappuram Dt.-AM-General Civil Work
2025_Irrig_814289_1
IRR/IA/TR/3437/2025_5_1_1/1
Open Tender
Civil Works - Others
chungathara
Please refer Tender documents.
10 documents required · 10 mandatory
₹1,125
Yes
₹12,709
Yes
31 Jan 2026
25 Oct 2025
4 Nov 2025
25 Oct 2025
1 Nov 2025
25 Oct 2025
Amount
Placing of Shutter for storing water and other works
OD9009/2025-2026:Removing shutters and plastic sheet at check dam site after water storage season, conveyance of theshutters from CD to the storage shed, including labour charges, loading and unloading, hire charges for tools and plants etc complete. Rate for shutter removal from each vents. (If divers are required for shutter removal in case of flood/high water level, it shall be paid separately.)
OD9012/2025-2026:Placing shutters with plastic sheet for check dam for storage of water including conveyance of the shutters from storage shed to the CD site, loading and unloading, labour charges for cleaning shutters and groves, painting with anticorrossive bitumastic paint. Rate for each vents (If wooden logs and wastes are deposited at check dam pillars or grooves due to floods, separate payment shall be made for such removal)
OD9014/2025-2026:Engaging divers for removal of wooden logs, silt etc at upstream side of regulator shutters deposited due to floods, to be cleared to avoid further flooding up of river as per direction of the departmental officers at site.
OD9011/2025-2026:Engaging skilled labourers (Man mazdoor) for assisting divers for removal of wooden logs, silt etc at upstream side of regulator shutters as per the direction of the departmental officers at site.
OD9008/2025-2026:Using chain blocks for flood clearance works or other necessary works including hire charges for chain blocks, labour charges etc complete.
OD9015/2025-2026:Engaging skilled labours with necessary equipment for cutting and removing wood logs and other materials deposited in check dam vents/piers including labour charges, hire charges and cost of all materialsetc complete as per direction of departmental officers at site.
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
60.7.6:Supplying and stacking granite stone 20 to 45 dm3 for dumping works- Supplying at site of work granite stone 20 to 45 dm3 in size (60% 45m3,30%30 to 40dm3 and 10% 20 to 30dm3 stones) for measurement ( deducting not less than 15% for voids as fixed by the departmental officer at site) including all cost, conveyance, loading and unloading charges all other incidental charges all leads and lifts etc. complete as per the direction of the departmental officers at site.
60.7.7:Conveyance and dumping of departmental granite stones-Conveyance of departmental granite stone 20 to 45 dm3 in size from stack at site and dumping in position (60% 45m3,30%30 to 40dm3 and 10% 20 to 30dm3 stones) to lines and levels to from the core of the sea wall as per approved design including all leads and lifts etc. complete as per the direction of the departmental officers at site.
60.7.4:DR PACKING FOR APRONS - Rough stone dry packing for apron with good quality blasted rubble including packing to compactness to lines levels, cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
10.25.1:Item Shifted to Sub head 14 as item 14.73 Item Shifted to head 14 as item 14.74 Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In stringers, treads,landings etc. of stair cases, including use of chequered plate wherever required, all complete
SAMSON M JOHN (BID ID -2423232)
Bidder Name
VARGHESE U O
SAMSON M JOHN
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1362026.xls
BOQ • 0.31 MB
SBDarampuli.pdf
Tender Documents • 1.63 MB