Tender Value
₹20 L
EMD Value
₹40,000
Closing Date
7 Aug 2026, 4:00 pm
ER Iqbal Ganie
Office of the EXEN PWD RNB Div Banihal
Refer to BOQ
2026_PWDJK_316780_8
NIT 31 Of 2026-27 Dated 18-07-2026
Open Tender
Civil Works
Percentage
90 days
Executive Engineer PWD RnB Division Banihal
Refer to SBD
2 documents required · 2 mandatory
₹800
Office of the EXEN PWD RNB Div Banihal
₹40,000
Executive Engineer PWD RnB Division Banihal
18 Jul 2026
18 Jul 2026
8 Aug 2026
18 Jul 2026
7 Aug 2026
18 Jul 2026
30 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : | 4,562.1 | cum | 187.3 | ₹8,54,481.33 |
| 0.0 | Ordinary Rock | 1,140.53 | cum | 392.8 | ₹4,48,000.18 |
| 0.0 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil : | - | cum | 256.85 | - |
| 0.0 | Ordinary Rock | 7.41 | cum | 493.5 | ₹3,656.84 |
| 0.0 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 2.75 | cum | 4,826.5 | ₹13,272.88 |
| 0.0 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) | 2.89 | cum | 5,673.4 | ₹16,396.13 |
| 0.0 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) with 20% boulders | 5.21 | cum | 4,586.88 | ₹23,897.64 |
| 0.0 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts,struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills, fillets etcupto floor V level, including curing but excluding the cost of centring, shuttering and finishing with. 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 19.81 | cum | 8,422.45 | ₹1,66,848.73 |
| 0.0 | Dry random rubble masonry with hard stone in foundation and plinth: Without bond stone Nallah | 29.4 | cum | 2,793.8 | ₹82,137.72 |
| 0.0 | Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: Cement mortar 1:6 (1 Cement : 6 coarse sand) Nallah | 38.75 | cum | 5,402.9 | ₹2,09,362.38 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.86 MB
BOQ_1034979.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].