Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹69.8 LAccepted-AOC | ₹69.8 L | L1 | Accepted-AOC L1 |
| 2 | L2₹83.8 LRejected-AOC | ₹83.8 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | SAJITH P L1 | A V BALAKRISHNAN L2 |
|---|---|---|---|---|---|
| 1.00Construction of Building | |||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 110.03 | cum | 276.03 ₹30,372.13 | 331.98 ₹36,528.42 |
| 1.00 | 2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil | 6.68 | cum | 100.75 ₹672.71 | 122 ₹814.59 |
| 1.00 | 20.2A.1:Boring, providing and installation bored cast-in-situ reinforced cement concrete piles of garde M-25 of
specified diameter and length below pile cap, to carry a safe working load not less than specified,
excluding the cost of steel reinforcement but including the cost of boring with bentonite solution and
temporary casing of appropriate length for setting out and removal of same and the length of the pile to
be embedded in the pile cap etc. by Crawler mounted, telescopic boom hydraulic pilling Rig all complete,
including removal of excavated earth with all its lifts and leads (length of pile for payment shall be
measured up to bottom of pile cap).
Note: Truck Mounted rotary/TMR/Tube well boring machine shall not be used.600 mm dia piles | 468 | metre | 4,540.27 ₹21.2 L | 5,448.98 ₹25.5 L |
| 1.00 | 20.6.2.1:Vertical load testing of piles in accordance with IS 2911 (Part IV) including installation of loading platform by Kentledge/Anchor piles method and preparation of pile head or construction of test cap and dismantling of test cap after test etc. complete as per specification & the direction of Engineer in-charge.
Single pile above 50 tonne and upto 100 tonne capacityInitial test (Test Load 2.5 times the Safe capacity) | 1 | per test | 55,477.45 ₹55,477.45 | 66,581.02 ₹66,581.02 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 7.36 | cum | 6,100.18 ₹44,921.73 | 7,321.1 ₹53,912.58 |
| 1.01 | OD262961/2024-2025:Providing and laying in position machine batched and machine mixed design mix M- 25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge.Note: Contractor has to bring the design mix from any approved govt: institutions and there will not be any payment for excess cement. All work up to plinth level | 53.37 | cum | 8,373.78 ₹4.5 L | 10,049.76 ₹5.4 L |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 29,227.08 | kilogram | 86.45 ₹25.3 L | 103.75 ₹30.3 L |
| 1.01 | OD262957/2024-2025:Laterate masonry with neatly dressed laterate stone of size 35x20x20cm or nearest size in cement mortar 1:6 for foundation and basement including all cost of materials, labour charges etc. | 35.55 | cum | 5,604.71 ₹2.0 L | 6,726.47 ₹2.4 L |
| 1.01 | OD262962/2024-2025:Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. Note:- Cement content considered in this item is @ 330 kg/cum. Contractor has to bring the design mix from any govt approved institution and there will not be any payment for excess cement . All work above plinth level upto floor V level
Note:- Contractor has to bring mix design from any approved govt.institution and there will not be any payment for excess cement. | 45.51 | cum | 9,938.25 ₹4.5 L | 11,927.35 ₹5.4 L |
Tender Value
₹84.7 L
EMD Value
₹50,000
Closing Date
14 Nov 2025, 5:00 pmClosed
EXECUTIVE ENGINEER
EXECUTIVE ENGINEER PWD BUILDINGS DIVISON, THALASSERY
GENERAL GWHS S CHERUKUNNU Construction of school building for UP wing of Govt welfare Higher secondary school Cherukunnu Kannur General Civil Work
2025_PWD_819273_1
60/2025-26
Open Tender
Civil Works - Buildings
540 days
CHERUKUNNU
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹50,000
Yes
7 Mar 2026
5 Nov 2025
17 Nov 2025
5 Nov 2025
14 Nov 2025
5 Nov 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1373258.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
SBD.pdf
Tender Documents • 1.63 MB
BOQ_1373258.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid