| 1 | L1₹30.6 LAccepted-AOC KOTI COLONY KOTI DEHRADUN | L1 | Accepted-AOC L1 | |
| 2 | L2₹31.0 L+₹44,979.45 (1.47%)Rejected-AOC 01 VIDYA VIHAR PHASE I KARGI ROAD DEHRADUN | DEHRADUN | UTTARAKHAND | 248001 | L2 | Rejected-AOC L2 | |
| 3 | L3₹32.0 L+₹1.5 L (4.87%)Rejected-AOC 192 LAKHI BAG DEHRADUN | DEHRADUN | UTTARAKHAND | 248001 | L3 | Rejected-AOC L3 | |
| 4 | L4₹32.9 L+₹2.3 L (7.66%)Rejected-AOC 26 NETAJI STREET DEHRADUN UTTARAKHAND | L4 | Rejected-AOC L4 | |
| 5 | Rejected-Technical 150 45 SHANTI VIHAR GOVIND GARH DISTT DEHRADUN | DEHRADUN | UTTARAKHAND | 248001 | - | Rejected-Technical Technically Disqualified |
Tender Value
₹41.7 L
EMD Value
₹1.1 L
Closing Date
23 Mar 2023, 5:00 pmClosed
EE CM UJVN Ltd Dehradun
EE CM UJVN Ltd Yamuna bhawan Yamuna colony Dehradun
Outer Painting and associated repair work of Type III residences of UJVN Limited at Yamuna Colony Dehradun
2023_UJVN_55751_1
22/EE(CM)/DDN/2022-23
Open Tender
Civil Works
Item Rate
365 days
DEHRADUN
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,360
UJVN Limited PNB Ac no 0639002100009390
₹1.1 L
19 Sept 2023
2 Mar 2023
24 Mar 2023
2 Mar 2023
23 Mar 2023
9 Mar 2023
Amount
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) 4.1.3
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:6 (1 cement : 6 coarse sand) 6.1.2
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor five level in cement mortar 1:6 (1 cement : 6 coarse sand) : With Modular bricks 6.4.2
Providing and fixing on wall face unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion, (i) Single socketed pipes. 75 mm diameter 12.41.1
Providing and fixing on wall face unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion, (i) Single socketed pipes 110 mm diameter 12.41.2
Providing and fixing on wall face unplasticised - PVC moulded fittings/ accessories for unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion. Single tee with door 75x75x75 mm 12.42.3.1
Providing and fixing on wall face unplasticised - PVC moulded fittings/ accessories for unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion. Single tee with door110x110x110 mm 12.42.3.2
Providing and fixing on wall face unplasticised - PVC moulded fittings/ accessories for unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion. Shoe (Plain) 75 mm Shoe ) 12.42.6.1
Providing and fixing on wall face unplasticised - PVC moulded fittings/ accessories for unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion. Shoe (Plain) 110 mm Shoe 12.42.6.2
Providing and fixing to the inlet mouth of rain water pipe PTMT (an Engineering Thermoplastic) grating square (Slit) 150 mm square with a height of 8 mm and weighing not less than 100 gms. 12.46
12 mm cement plaster: 1:4 (1 cement : 4 fine sand) : 13.1.1
Extra for providing and mixing water proofing material in cement plaster work in proportion recommended by the manufacturers. : 13.21
Extra for plastering exterior walls of height more than 10 m from ground level for every additional height of 3 m or part thereof. :13.22
Forming groove of uniform size in the top layer of washed stone grit plaster as per approved pattern using wooden battens, nailed to the under layer, including removal of wooden battens, repair to the edges of panels and finishing the groove complete as per specifications and direction of the Engineer-in-charge :
Finishing walls with Acrylic Smooth exterior paint of required shade New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) :13.46.1
Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : One or more coats on old work 13.99.1
Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete. 13.80
Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two or more coat applied @ 0.90 ltr/ 10 sqm over an under coat of primer applied @ 0.80 ltr/ 10 sqm of approved brand and manufacture : 13.48.3
Providing and fixing double scaffolding system (cup lock type) on the exterior side, up to seven story height made with 40 mm dia M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after .The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and approval of Engineer-in-charge .The elevational area of the scaffolding shall be measured for payment purpose .The payment will be made once irrespective of duration of scaffolding. Note: - This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done. : 14.72
Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. 15.2.2
Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. 15.56
Disposal of building rubbish/malba/similar unserviceable, dismantled or waste materials by mechanical means including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all loads including all lifts involved. 15.60
Providing and fixing 15 mm dia. nominal bore G.I. pipes complete with G.I. fittings and clamps, including cutting and making good the walls etc. Internal work - Exposed on wall. 18.10.1
Water proofing treatment of RCC sunshade with Zycosil/ equivalent water proofing Solution (1 litre of zycosil/equivalent & 20 litres of water stirred first & 2 litres of Zycoprime/equivalent added and stirred (total 23 litres)) till it meets the saturation level and testing as per RILEM or by water drops test in which water drops do not absorb but drops remain or rolls.: 26.60
Engaging one suitable Labour for attending minor type of repair for full day as directed by Engineer in Charge : 0114
U.A. Construction co.
Mukesh Kumar Aggarwal
Arihant Constructions
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .