| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹63.1 LAccepted-AOC EDAVANNUR P O KANNUR | KANNUR | KANNUR | KERALA | 1 | Accepted-AOC AOC ISSUED . SANCTION FROM ADDL DIRECTOR OF SOIL CONSERVATION | |
| 2 | 2₹64.3 L+₹1.2 L (1.84%)Rejected-AOC | 2 | Rejected-AOC SECOND LOWEST BIDDER | |
| 3 | 3₹65.0 L+₹1.8 L (2.92%)Rejected-Finance BALADIKA HOUSE NEKRAJE POST KASARAGOD 671543 | KASARAGOD | KASARAGOD | KERALA | 671543 | 3 | Rejected-Finance SANCTION AS PER Letter No. Pg(2) 5936/2018 dated 18.09.2020 of Director of soil Survey and Soil Conservation |
Tender Value
₹67.7 L
EMD Value
₹50,000
Closing Date
13 Aug 2020, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
DISTRICT SOIL CONSERVATION OFFICER , KANNUR
Office of the District Soil Conservation Officer, Civil Station , B.- Block , Annexe Building , Kannur
Infrastructure development works - Construction of water harvesting structure (SasthamkottaAyappakshetraKulam )
2020_DSSC_373522_1
K(2) /1208/2017/2020-7
Open Tender
Civil Works - Others
Item Rate
180 days
peralasseri panchayath
Please refer Tender documents.
6 documents required · 6 mandatory
₹2,500
online
₹50,000
13 Nov 2020
28 Jul 2020
14 Aug 2020
28 Jul 2020
13 Aug 2020
28 Jul 2020
28 Jul 2020 - 13 Aug 2020
60 days
Amount
SASTHAMKOTTA AYAPPAKSHETRA KULAM-- PERALASSERY G.P
Earth work in excavation by mechanical means (Hydraulic excavator) /manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed. All kind of Soil (2.6.1)
Earth work in excavation by mechanical means (Hydraulic excavator) /manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift from 1.5to 3.00 m, disposed earth to be levelled and neatly dressed & It; br > . All kind of Soil (od5976/2019-2020)
Earth work in excavation by mechanical means (Hydraulic excavator) /manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift from 3 to 4.50m, disposed earth to be levelled and neatly dressed &. All kind of Soil (od5977/2019-2020)
Earth work in excavation by mechanical means (Hydraulic excavator) /manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift from 4.50 to6.00 m, disposed earth to be levelled and neatly dressed All kind of Soil (od5979/2019-2020)
Earth work in excavation by mechanical means (Hydraulic excavator) /manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift from 6.00 to7.50 m, disposed earth to be levelled and neatly dressed All kind of Soil (od5980/2019-2020)
Filling with Quarry Muck-Filling up low lying and water logged areas with local materials/ quqrry muck, spreading in layers, levelling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade (51.2.3)
Laterite roughly dressed stones of size 40x20x15 cm or nearest size laid for dry pitching Revetment etc for foundation and superstructure including cost of all materials and labour charges etc complete (od 5981/2019-2020)
Laterite masonry with neatly dressed Laterite stones of size 40x20x15 cm or nearest size in Cement mortar 1:6 for superstructure, landing , parapet and pillar etcincluding cost of all materials and labour charges etc complete (50.6.7.1)
Centering and shuttering including strutting, propping etc. and removal of form work for:Lintels, beams, plinth beams, girders, bressumers and cantilevers (5.9.5)
Providing and laying in position cement concrete of specified grade excluding the cost centering and shuttering- All work upto plinth level 1:3:6 (1 cement:3 coarse sand: 6 graded stone aggregate 20mm nominal size) (4.1.5) for intermediate belt , top of steps etc
Filling available excavated earth (excluding rock) in trenches, Plinth, sides of foundation etc. in layers not exceeding 20cm depth, consolidating each deposited layers by ramming and watering, lead upto 50m and lift upto 1.50m (2.25)
12 mm cement plaster of mix:1:4, (1 cement :4 fine sand) (13.1.1)
White washing with lime to give an even shade : New works(three or more coats) (13.37.1)
Providing and fixing PVC pipes including fixing the pipe with clamps/clips at 1.00m spacing. This includes joining of pipes with one step PVC solvent cement and testing of joints complete as per direction of Engineer-in-charge 110mm dia 4 kgf/cm2- External work- Exposed on wall (50.18.9.19.2)
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade: Two or more coats on new works (13.61.1)
Lettering with black japan paint of approved brand and manufacture for lettering (13.71)
Pumping or Bailing out of water and removing slush etc by using pumpset including cost of labour, oil hire charges of pumpset etc complete (50.2.3.1)
VINOOP. E.V.
ABDUL SATHAR B A
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_528951.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .