Tender Value
₹1.4 L
EMD Value
₹2,740
Closing Date
15 Sept 2026, 6:00 pmDue today
Executive Engineer
XEN
As Per BOQ
2026_RDPR_323788_1
103REW Samba of 2026-27 Dated-07-09-2026
Open Tender
Civil Works
Percentage
30 days
Vijaypur
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
Executve Engineer Rew Samba
₹2,740
8 Sept 2026
8 Sept 2026
16 Sept 2026
8 Sept 2026
15 Sept 2026
8 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in Cement mortar 1:6 ( 1 cement : 6 coarse sand) | 2.4 | cum | 1,725 | ₹4,140 |
| 2 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in Cement mortar 1:6 ( 1 cement : 6 coarse sand) | 0.36 | cum | 7,571.55 | ₹2,725.76 |
| 3 | Extra for brick work with common burnt clay bricks/cement concrete bricks in
superstructure above plinth level upto floor five level). | 0.36 | cum | 1,455.65 | ₹524.03 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level.1:5:10 aggregate 40mm nominal size). | 0.66 | cum | 4,826.5 | ₹3,185.49 |
| 5 | Providing and Laying cement concrete 1:3:6 (1 cement :3 coarse sand :6 grade crushed stone aggregate 20mm nominal size) | 14.83 | cum | 5,733.6 | ₹85,029.29 |
| 6 | Centring and shuttermg including strutting, propping etc. and removal of form for Foundations: footings, bases of columns etc. for mass concrete. | 38.7 | sqm | 286.35 | ₹11,081.75 |
| 7 | 12mm Cement plaster of mix in 1 : 6 | 34.2 | sqm | 266.2 | ₹9,104.04 |
| 8 | Structural steel work in built up sections, trusses and framed work,
including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 120 | kg | 138.2 | ₹16,584 |
| 9 | Labour engaged for clearing and cleaning of site | 6 | nos | 500 | ₹3,000 |
| 10 | Cost of sign Board | 1 | nos | 2,000 | ₹2,000 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.98 MB
BOQ_1090979.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .