Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹12.3 LAdmitted-Fee/PreQual/Technical/Finance AT PO CHATTIGUDA PS DABUGAM UMERKOTE PIN 764072 | UMERKOTE | NABARANGPUR | ODISHA | 764072 | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹13.4 L+₹1.2 L (9.60%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹14.0 L+₹1.7 L (13.7%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L3₹14.0 L+₹1.7 L (13.7%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L4₹14.1 L+₹1.8 L (15.1%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹16.8 L
EMD Value
₹16,900
Closing Date
9 Jun 2026, 5:00 pmClosed
Project Administrator
Integrated Tribal Development Agency, Nabarangpur
Repair of Boundary Wall at Govt. SSD Girls High School, Raighar under Raighar Block
2026_STSCD_129747_13
ITDANBG-02/26-27
Open Tender
Civil Works - Others
Percentage
120 days
Nabarangpur
D and C Class
2 documents required · 2 mandatory
₹6,000
₹16,900
Yes
23 Jun 2026
26 May 2026
16 Jun 2026
26 May 2026
9 Jun 2026
26 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling brick or stone masonry in lime or cement mortar above 3m. height including stacking the useful materials for reuse and removing the debris within 50m. Lead | 9.34 | Sqm | 1,706.55 | ₹15,939.18 |
| 2 | Earthwork excavation for foundation in hard soil or gravelly soil within 50m. Initial lead and 1.5m initial lift including dressing the bed as per the direction of the Engineer-in-charge. | 37.5 | Cum | 276.89 | ₹10,383.38 |
| 3 | Filling foundation and plinth with well watered and rammed sand including all cost, convayance and royality of all materials etc. complete as per the direction of the engineer-in-charge. | 7.5 | Cum | 1,198.32 | ₹8,987.4 |
| 4 | CC(1:4:8) using 40 mm size hard metal including all cost , conveyance , curing , taxes and royality etc complete. | 37.13 | Cum | 6,044.79 | ₹2,24,443.05 |
| 5 | Fly ash Brick work Masonaryin cement mortar (1:6) in foundation and plinth per cum. | 122.18 | Cum | 5,775.61 | ₹7,05,664.03 |
| 6 | RCC Work of M-20 grade using 20 mm & down grade black hard granite (crusherbroken ) stone chips including hoisting and laying.
Plinth Bend | 11.4 | Cum | 6,983.5 | ₹79,611.9 |
| 6.1 | Column | 2.58 | Cum | 18,656.12 | ₹48,132.79 |
| 7 | Supplying,Cutting,straightening of steel HYSD (Fe-500) conforming to (IS.1786) with bending,binding,cranking,hooking,welding Jointing if necessary & tying the grills and placing in position as required for the Rod work in all floors and for providing fan hooks hosting lowering,&laying steels including conveyance,taxes & royalities of an materials and binding wires or 18 to 20 gauge & cost of all labour T&P requred for the work etc. | 12.58 | Qntl | 10,269.29 | ₹1,29,187.67 |
| 8 | 16 mm thick cement plaster (1 : 6 ) overbrick masonary including all cost , conveyance , royality etc complete. | 495 | Sqm | 284.87 | ₹1,41,010.65 |
| 9 | 12 mm thick cement plaster(1 : 6 ) overbrick masonary including all cost , conveyance , royality , curing with all etc complete. | 472.5 | Sqm | 198.79 | ₹93,928.28 |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.49 MB
BOQ_592501.xls
BOQ • 0.27 MB
DTCN2.pdf
Tender Documents • 2.73 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .