Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.7 LAccepted-Finance | ₹30.7 L | L1 | Accepted-Finance Accepted |
| 2 | L1₹30.7 LAccepted-Finance | ₹30.7 L | L1 | Accepted-Finance Accepted |
| 3 | L2₹40.3 LAccepted-Finance | ₹40.3 L | L2 | Accepted-Finance Accepted |
| 4 | L2₹40.3 LAccepted-Finance | ₹40.3 L | L2 | Accepted-Finance Accepted |
| 5 | L2₹40.3 LAccepted-Finance GOPESWARI PRADHAN ODISHA | BALESHWAR | ODISHA | 756001 | ₹40.3 L | L2 | Accepted-Finance Accepted |
Tender Value
₹40.3 L
EMD Value
₹40,307
Closing Date
14 Jul 2026, 5:00 pmClosed
BDO Paikmal
Block Office Paikmal
Civil Work
2026_PRBPK_134070_1
PKL-BLK-02/2026-27
Open Tender
Civil Works - Buildings
Percentage
Paikmal
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹40,307
17 Jul 2026
2 Jul 2026
15 Jul 2026
2 Jul 2026
14 Jul 2026
2 Jul 2026
2 Jul 2026 - 14 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth Work in excavation of foundation in hard soil within initial leads of 50m & lifts of 1.5m including dressing and leveling of bed etc and adding contractor's profit and over head charges etc. complete in all respect | 1 | cum | 1 | ₹1 |
| 2 | Filling Foundation & Plinth with excavated materials etc including OH T & P etc 2/3 rate of earthwork in excavation of Foundation etc. | - | cum | 1 | - |
| 3 | Cement Concrete ( 1:3:6) using 40mm size hard granite CB metal approved quality from approved quarry including cost, carriage, rolyalty, cost of all labour etc complete and as directed by EIC. | 1 | cum | - | - |
| 4 | Brick work with Fly ash Bricks 25cm × 12cm × 8cm size having crushing strength not less than 75Kg/cm2 with dimensional tolerance +2 percent in cement mortar (1:6) in Foundation and Plinth including watering curring, cost of carriage and royalty of all materials cost of all | - | cum | 1 | - |
| 5 | RCC M-25 grade with 20mm and down grade CB Chips of approved quality from approved quality from approved quarry including hoisting, laying hire charges of concrete mixture, vibrator, watering, curing and cost
Ground Floor Column Base Up to P/L | - | cum | 1 | - |
| 6 | Ground Floor Column Super Str | - | cum | - | - |
| 7 | Ground Floor Plinth Beam | 1 | cum | - | - |
| 8 | Ground Floor Lintel | 1 | cum | - | - |
| 9 | Ground Floor Roof Beam | - | cum | - | - |
| 10 | Ground Floor RCC Chhajja | 1 | cum | 1 | ₹1 |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
finance_599216.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.18 MB
DTCN.pdf
Tender Documents • 30.43 MB
BOQ_599216.xls
BOQ • 0.34 MB
EMDEXEMPTIONALLOWED.pdf
PDF • 0.70 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].