| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹10.5 CrAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹11.6 Cr+₹1.1 Cr (11.0%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹12.0 Cr+₹1.5 Cr (14.1%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹12.3 Cr+₹1.8 Cr (17.6%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | L5₹12.8 Cr+₹2.3 Cr (21.6%)Admitted-Finance | L5 | Admitted-Finance |
Tender Value
₹17.6 Cr
Closing Date
21 Oct 2021, 6:00 pmClosed
CE WR ZONE KOTA
CE WR ZONE KOTA
Construction of Anicut Near Village Arniya on Parwati river Tehsil-Atru Distt. Baran
2021_WRDAS_237572_1
CE WR ZONE KOTA NITNO-02-2021-22
Open Tender
Civil Works
Percentage
720 days
KOTA
Please refer Tender documents.
3 documents required · 3 mandatory
₹15,000
15000 EE WR DIV. III BARAN
Yes
CE WR ZONE KOTA
3 Dec 2021
18 Aug 2021
22 Oct 2021
18 Aug 2021
21 Oct 2021
18 Aug 2021
25 Aug 2021
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect Hard soil mixed with kankar / boulders, morrum | 1 | Cum | - | - |
| 2Excavation including loading unloading disposal and dressing of excavated rock within initial lead of 50m and lift upto 1.5m in dry or moist including dressing of excavated area, de-watering wherever required complete in all respect. | |||||
| 2.1 | Soft / disintegrated rock | - | Cum | - | - |
| 2.2 | Hard Rock not Requiring Blasting | - | Cum | - | - |
| 2.3 | Hard rock (dry or moist) requiring blasting (where hardness of rock is more than 2) including disposal of excavated material in the designated spoil bank/ embankment, dressing of excavated material and dewatering with all leads & lifts of excavation and d | - | Cum | - | - |
| 3Final excavation by line drilling including removing of hard rock by wedging and barring and chiseling near final levels (only upto 0.3 m depth) without resorting to blasting including dewatering, disposal of excavated material within in | |||||
| 4Preparation of foundation of structure including removal of all loose stones, silt and final washing.(b) By compressed air & water under pressure | |||||
| 5Drilling holes of 35 mm diameter for anchor rods. | |||||
| 5.1 | Upto 1.50 m. depth | - | M. | - | - |
| 5.2 | Labour charges for Fixing of anchor bars in neat cement grout including cost of cement and curing etc. complete | - | Nos. | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.48 MB
BOQ_423894.xls
BOQ • 0.29 MB
tech_Arniya.pdf
Tender Documents • 2.07 MB
Financial_Bid_Arniya.pdf
Tender Documents • 1.83 MB
Arniya_vetted_drawing_compressed.pdf
Tender Documents • 2.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .