| Sl No | Description | Qty | Unit | ATHULKRISHNA L1 | Unnikrishnan T R L2 |
|---|---|---|---|---|---|
| 1.00Road work | |||||
| 1.00 | 2.5.2.A:Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately Bituminous course - By Mechanical Means | 2 | cum | 502.15 ₹1,004.3 Lowest | 506.76 ₹1,013.52 |
| 1.00 | 2.4.4.B:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Dismantling Stone Masonry - Rubble stone masonry in cement mortar. | 12.59 | cum | 729.19 ₹9,176.86 Lowest | 735.89 ₹9,261.18 |
| 1.00 | 2.4.2.A:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Cement Concrete Grade M-15 & M-20 - By Mechanical Means | 7.2 | cum | 748.4 ₹5,388.48 Lowest | 755.28 ₹5,438.02 |
| 1.00 | 3.13.1.B:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Ordinary soil - Mechanical Means - (Depth upto 3 m) | 24 | cum | 62.4 ₹1,497.6 Lowest | 62.98 ₹1,511.52 |
| 1.00 | OD87338/2024-2025:Back filling along road side berms as per Technical Specification using departmental material | 12 | cum | 30.9 ₹370.8 Lowest | 31.18 ₹374.16 |
| 1.01 | 13.9.A:Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification Granular material | 20.88 | cum | 2,786.7 ₹58,186.3 Lowest | 2,812.27 ₹58,720.2 |
| 1.01 | 12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. | 14.05 | cum | 7,031.76 ₹98,796.23 Lowest | 7,096.28 ₹99,702.73 |
| 1.01 | 12.8.A.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15 | 14.53 | cum | 8,106.16 ₹1,17,790.61 Lowest | 8,180.52 ₹1,18,871.14 |
| 1.01 | OD115871/2024-2025:Plain/ Reinforced cement concrete in open foundation complete as per drawing and Technical specifications<br> PCC grade M15 (without formwork) <br> | 6.5 | cum | 7,132 ₹46,358 Lowest | 7,197.43 ₹46,783.3 |
Tender Value
Refer Docs
EMD Value
₹11,424
Closing Date
12 May 2025, 11:00 amClosed
ASSISTANT EXECUTIVE ENGINEER PWD ROADS SUB DIVISIO
ASSISTANT EXECUTIVE ENGINEER PWD ROADS SUB DIVISION THRISSUR
FDR 2024 25
2025_PWD_762016_1
03/2025-26/AEE/TSR
Open Tender
Civil Works - Roads
Item Rate
120 days
Cherpu
Please refer Tender documents.
8 documents required · 8 mandatory
₹1,010
Yes
₹11,424
Yes
23 Oct 2025
26 Apr 2025
14 May 2025
26 Apr 2025
12 May 2025
26 Apr 2025
Amount
Road work
2.5.2.A:Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately Bituminous course - By Mechanical Means
2.4.4.B:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Dismantling Stone Masonry - Rubble stone masonry in cement mortar.
2.4.2.A:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Cement Concrete Grade M-15 & M-20 - By Mechanical Means
3.13.1.B:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Ordinary soil - Mechanical Means - (Depth upto 3 m)
OD87338/2024-2025:Back filling along road side berms as per Technical Specification using departmental material
13.9.A:Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification Granular material
12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
12.8.A.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15
OD115871/2024-2025:Plain/ Reinforced cement concrete in open foundation complete as per drawing and Technical specifications<br> PCC grade M15 (without formwork) <br>
12.8.1.C.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer
12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications
4.1.A.1:Construction of granular sub-base by providing graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with a motor grader on the prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 Grading-I - Plant Mix Method
4.12:Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
Unnikrishnan T R (BID ID -2207909)
Bidder Name
ATHULKRISHNA
Unnikrishnan T R
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1240173.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .