| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.5 LAccepted-AOC | ₹13.5 L | L1 | Accepted-AOC 1st Lowest |
| 2 | L2₹14.1 L+₹60,278 (4.46%)Rejected-Finance | ₹14.1 L+₹60,278 (4.46%) | L2 | Rejected-Finance Higher Side |
| 3 | L3₹15.0 L+₹1.5 L (10.8%)Rejected-Finance | ₹15.0 L+₹1.5 L (10.8%) | L3 | Rejected-Finance Higher Side |
| 4 | L4₹15.0 L+₹1.5 L (11.0%)Rejected-Finance JOGINDER NAGAR | JALANDHAR | PUNJAB | 144020 | ₹15.0 L+₹1.5 L (11.0%) | L4 | Rejected-Finance Higher Side |
| Sl No | Description | Qty | Unit | ANURAG SHARMA L4 | G.P.ACHARYA L3 | VISHAL RAJPUT L2 | Kulvinder L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | Providing laying and rolling built-up-spray grout layer over prepared base consisting of a single layer composite construction of compacted crushed stone agg. Using motor grader for aggregates key stone chips spreader may be used with application of bituminous binder after each layer, and with key aggregates placed on top of the second layer to serve as a base, conforming to the line, grades and cross-section specified, the compacted layer thickness being 75mm (seventy five millimetre) as per technical specification clause 505 ( Bitumen VG-10) and as per direction of Engineer with in all leads and lifts and other incidental.The rate including of octroi, royality, Malkana, toll tax, sale tax or other taxes imposed by the government. | 196.56 | Per Square metre | 300 ₹58,968 | 250 ₹49,140 | 215 ₹42,260.4 Lowest | 225 ₹44,226 |
| 2.00 | Providing and applying tack coat with Bitument emulsion (RS-I) using emulsion pressure distributor at the rate of 0.20 to 0.25 kg. (zero point twenty to zero Point Twenty Five ) per/ Square metre on the prepared bituminous cleaned with hydraulic broom as per M.O.R.D. technical specifications section No. 503 as per the entire satisfaction and direction of Engineer-In-Charge including carriage of materials within all leads and lifts and other incidentals. The rate including of octroi, royality, Malkana, toll tax, sale tax or other taxes imposed by the government. | 3,276 | Per Square metre | 20 ₹65,520 | 22 ₹72,072 | 22 ₹72,072 | 18 ₹58,968 Lowest |
| 3.00 | Providing and laying bituminous cocrete 30mm (thirty milimetre) thick with 100-120 (one hundred - one hundred twenty )TPH batch type hot mix plant producing an average output of 75 (seventy five) tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder VG-10 @ 5.5(five point five point ) per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tendem rollers to achive the desired compaction as per MORTH specification clause 509 and as per the directions of Engineer-in-Charge including carriage of material within all leads and lifts and other incidentals and to the entire satisfaction of the Engineer-in-Charge .The rate is including octroi, royality, GST, toll tax, Sale Tax or other taxes imposed by the government. | 98.28 | Per Cubic metre | 14,000 ₹13,75,920 | 14,000 ₹13,75,920 | 13,200 ₹12,97,296 | 12,700 ₹12,48,156 Lowest |
Tender Value
₹14.6 L
EMD Value
₹29,300
Closing Date
2 Apr 2022, 11:00 amClosed
Xen HPPWD Division Baijnath
Xen HPPWD Division Baijnath
Providing and Laying built-up-spray grout,Tack Coat and 30 mm thick Bituminous concrete at Km 63/00 to 64/00
2022_PWD_58368_1
PWD-BD-TA-2021-22-19479-19525
Open Tender
Civil Works - Roads
Item Rate
60 days
Baijnath
Please refer Tender documents.
11 documents required · 11 mandatory
₹500
₹29,300
14 Sept 2026
23 Mar 2022
2 Apr 2022
23 Mar 2022
2 Apr 2022
23 Mar 2022
Amount
Providing laying and rolling built-up-spray grout layer over prepared base consisting of a single layer composite construction of compacted crushed stone agg. Using motor grader for aggregates key stone chips spreader may be used with application of bituminous binder after each layer, and with key aggregates placed on top of the second layer to serve as a base, conforming to the line, grades and cross-section specified, the compacted layer thickness being 75mm (seventy five millimetre) as per technical specification clause 505 ( Bitumen VG-10) and as per direction of Engineer with in all leads and lifts and other incidental.The rate including of octroi, royality, Malkana, toll tax, sale tax or other taxes imposed by the government.
Providing and applying tack coat with Bitument emulsion (RS-I) using emulsion pressure distributor at the rate of 0.20 to 0.25 kg. (zero point twenty to zero Point Twenty Five ) per/ Square metre on the prepared bituminous cleaned with hydraulic broom as per M.O.R.D. technical specifications section No. 503 as per the entire satisfaction and direction of Engineer-In-Charge including carriage of materials within all leads and lifts and other incidentals. The rate including of octroi, royality, Malkana, toll tax, sale tax or other taxes imposed by the government.
Providing and laying bituminous cocrete 30mm (thirty milimetre) thick with 100-120 (one hundred - one hundred twenty )TPH batch type hot mix plant producing an average output of 75 (seventy five) tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder VG-10 @ 5.5(five point five point ) per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tendem rollers to achive the desired compaction as per MORTH specification clause 509 and as per the directions of Engineer-in-Charge including carriage of material within all leads and lifts and other incidentals and to the entire satisfaction of the Engineer-in-Charge .The rate is including octroi, royality, GST, toll tax, Sale Tax or other taxes imposed by the government.
VISHAL RAJPUT
G.P.ACHARYA
ANURAG SHARMA
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .